Industrial Park Water Improvements Phase 1 REBID

 

Industrial Park Water Improvements Phase 1 REBID

 

City of Wapakoneta, Auglaize County

Please click here for bid tab results.

Pending awardee announcement.

 
 
 

Eaton High School North Parking Lot Improvements

 

Eaton High School North Parking Lot Improvements

 

Eaton Community School District, Preble County

Please click here for bid tab results.

Pending awardee announcement.

 
 
 

Portable Barricades and Trailers

 

Portable Barricades and Trailers

 

Village of Yellow Springs, Greene County

Please click here for bid tab results.

Project awarded to ... No award. Project will be rebid.

 
 
 

Defiance Avenue Lift Station Replacement

 

Defiance Avenue Lift Station Replacement

 

Village of Hicksville, Defiance County

Please click here for bid tab results.

Project awarded to JDY Excavating LLC, Hicksville, Ohio

 
 
 

2025 Street Maintenance

 

2025 Street Maintenance

 

Village of Carey, Wyandot County

Please click here for bid tab results.

Project awarded to M&B Asphalt Co., Inc., Old Fort, Ohio

 
 
 

Main Street Traffic Signal Battery Backup Project REBID

 

Main Street Traffic Signal Battery Backup Project REBID

 

Hardin County Board of Commissioners

Please click here for bid tab results.

Project awarded to Capital Electric Line Builders, Dayton, Ohio

 
 
 

Industrial Park Water Improvements Phase 1

 

Industrial Park Water Improvements Phase 1

 

City of Wapakoneta, Auglaize County

Project awarded to ... No award. Project will be rebid.

 
 
 

Morrow Road Reconstruction

 

Morrow Road Reconstruction

 

City of South Lebanon, Warren County

Please click here for bid tab results.

Project awarded to Fillmore Construction, Leesburg, Ohio

 
 
 

Main Street Pump Station Rehabilitation

 

Main Street Pump Station Rehabilitation

 

Village of Russia, Shelby County

Project awarded to ... No award. Project will be rebid.

 
 
 

Hamilton Street Sidewalk

 

Hamilton Street Sidewalk

 

Village of New Richmond, Clermont County

Please click here for bid tab results.

Project awarded to Fillmore Construction LLC, Leesburg, Ohio

 
 
 

Detroit Street Lead Line Replacement

 

Detroit Street Lead Line Replacement

 

City of Kenton, Hardin County

Please click here for bid tab results.

Project awarded to Mid Ohio Utilities, LLC, Lancaster, Ohio

 
 
 

Blosser Street Reconstruction Phase 4

 

Blosser Street Reconstruction Phase 4

 

Village of New Lebanon, Montgomery County

Please click here for bid tab results.

Project awarded to M&T Excavating, Bradford, Ohio

 
 
 

25-10 Aldrin Drive Water Main Replacement

 

25-10 Aldrin Drive Water Main Replacement

 

City of Sidney, Ohio

Please click here for bid tab results.

Pending awardee announcement.

 
 
 

S. Main St. Water Extension to Schafer Oil

 

S. Main St. Water Extension to Schafer Oil

 

Village of Fort Loramie, Shelby County

Please click here for bid tab results.

Project awarded to Tom's Construction, Inc., St. Henry, Ohio

 
 
 

GCWW Interconnection PRV Installation

 

GCWW Interconnection PRV Installation

 

City of South Lebanon, Warren County

Please click here for bid tab results.

Project awarded to Benchmark Land Management LLC, West Chester, Ohio

 
 
 

Old High Service Pump Building Equipment Upgrade

 

Old High Service Pump Building Equipment Upgrade

 

City of New Carlisle, Clark County

Project awarded to ... All bids have been rejected. Project will be rebid.

 
 
 

Lazenby Street Water Main Replacement

 

Lazenby Street Water Main Replacement

 

Village of Blanchester, Clinton County

Please click here for bid tab results.

Project awarded to Wilson Excavating of Jackson County LLC, Wellston, Ohio

 
 
 

MOT Woodman Dr Reconstruction, PID 115003

 

MOT Woodman Dr Reconstruction, PID 115003

 

Montgomery County, Ohio

Project awarded to Barrett Paving Materials

 
 
 

25-04 Stewart Subdivision Water & Sewer Replacement Phase I

 

25-04 Stewart Subdivision Water & Sewer Replacement Phase I

 

City of Sidney, Ohio

Project awarded to Milligan Construction

 
 
 

US Route 40 Water Transmission Main Replacement

 

US Route 40 Water Transmission Main Replacement

 

Village of West Jefferson, Madison County

Please click here for bid tab results.

Project awarded to J & J Schlaegel, Inc., Urbana, Ohio

 
 
 

2024-2 CCMG Monroe Project

 

2024-2 CCMG Monroe Project

 

Town of Monroe, Adams County

Please click here for bid tab results.

Project awarded to Brooks Construction Co Inc., Fort Wayne, Indiana

 
 
 

2024-2 CCMG Parker City Project

 

2024-2 CCMG Parker City Project

 

Town of Parker City, Randolph County

Please click here for bid tab results.

Project awarded to E&B Paving, LLC, Daleville, Indiana

 
 
 

2024-2 CCMG Farmland Project

 

2024-2 CCMG Farmland Project

 

Town of Farmland, Randolph County

Please click here for bid tab results.

Project awarded to Howard Companies, Indianapolis, Indiana

 
 
 

E. 4th Street Sanitary Extension

 

E. 4th Street Sanitary Extension

 

Village of Spencerville, Allen County

Please click here for bid tab results.

Project awarded to Hohenbrink Excavating LLC, Findlay, Ohio

 
 
 

2024-2 CCMG Cambridge City Project

 

2024-2 CCMG Cambridge City Project

 

Town of Cambridge City, Wayne County

Please click here for bid tab results.

Project awarded to Milestone Contractors, L.P., Richmond, IN

 
 
 

2024-2 CCMG Portland Project

 

2024-2 CCMG Portland Project

 

City of Portland, Jay County

Please click here for bid tab results.

Project awarded to Brooks Construction Co Inc., Fort Wayne, IN

 
 
 

2024-2 CCMG Redkey Project

 

2024-2 CCMG Redkey Project

 

Town of Redkey, Jay County

Please click here for bid tab results.

Project awarded to Brooks Construction Co Inc., Fort Wayne, Indiana

 
 
 

Morris-Rose Waterline Loop

 

Morris-Rose Waterline Loop

 

Village of Jackson Center, Shelby County

Please click here for bid tab results.

Project awarded to Precise Boring of Ohio, Lancaster, Ohio

 
 
 

West Montford Avenue Improvement Project

 

West Montford Avenue Improvement Project

 

Hardin County Board of Commissioners, Ohio

Please click here for bid tab results.

Project awarded to Hohenbrink Excavating LLC, Findlay, Ohio

 
 
 

South Gilbert Street Storm Sewer Improvement Project

 

South Gilbert Street Storm Sewer Improvement Project

 

Hardin County Board of Commissioners, Ohio

Please click here for bid tab results.

Project awarded to Hohenbrink Excavating LLC, Findlay, Ohio

 
 
 

Kathryn Hanlon Park Resurfacing

 

Kathryn Hanlon Park Resurfacing

 

Village of Georgetown, Brown County

Please click here for bid tab results.

Project awarded to Fillmore Construction LLC, Leesburg, Ohio

 
 
 

Tipp City Curb Ramp Project

 

Tipp City Curb Ramp Project

 

Miami County Commissioners, Miami County

Please click here for bid tab results.

Project awarded to Double Jay Construction, Inc., Englewood, Ohio

 
 
 

2024 Hardscape Projects REBID

 

2024 Hardscape Projects REBID

 

Centerville-Washington Park District, Montgomery County

Please click here for bid tab results.

Project awarded to Neyra Paving, Cincinnati, Ohio

 
 
 

Perry and Taft Signal Improvements

 

Perry and Taft Signal Improvements

 

Village of Ottawa, Putnam County

Please click here for bid tab results.

Project awarded to FET Construction Services, LLC

 
 
 

Taylor Blair Emergency Forcemain Replacement

 

Taylor Blair Emergency Forcemain Replacement

 

Village of West Jefferson, Madison County

Please click here for bid tab results.

Project awarded to J & J Schlaegel, Inc., Urbana, Ohio

 
 
 

Cherokee and Main Water Main REBID

 

Cherokee and Main Water Main REBID

 

City of Loveland, Hamilton County

Please click here for bid tab results.

Project awarded to Majors Enterprises, Inc., Monroe, Ohio

 
 
 

Watermain and Service Line Replacement

 

Watermain and Service Line Replacement

 

City of New Carlisle, Clark County

Please click here for bid tab results.

Project awarded to Outdoor Enterprise, LLC, Troy, Ohio

 
 
 

Richardson Park Path

 

Richardson Park Path

 

Jefferson Township, Montgomery County

Please click here for bid tab results.

Project awarded to Outdoor Enterprise, LLC, Troy, Ohio

 
 
 

Buckeye Avenue One-Way Traffic Flow

 

Buckeye Avenue One-Way Traffic Flow

 

Village of Ada, Hardin County

Please click here for bid tab results.

Project awarded to A&A Safety, Inc., Amelia, Ohio

 
 
 

Sanitary Rehab Phase 21

 

Sanitary Rehab Phase 21

 

Village of New Lebanon, Montgomery County

Please click here for bid tab results.

Project awarded to Insituform Technologies, LLC, Chesterfield, MO

 
 
 

Veterans Memorial Park

 

Veterans Memorial Park

 

Sugarcreek Township, Greene County

Please click here for bid tab results.

Project awarded to Outdoor Enterprise, LLC, Troy, Ohio

 
 
 

Stillwater River Water Main Crossing

 

Stillwater River Water Main Crossing

 

Village of West Milton, Miami County

Please click here for bid tab results.

Project awarded to R.B. Jergens Contractors, Inc., Vandalia, Ohio

 
 
 

S. Main St. Storm Sewer Replacement

 

S. Main St. Storm Sewer Replacement

 

City of Delphos, Allen County

Please click here for bid tab results.

Project awarded to Hohenbrink Excavating LLC, Findlay, Ohio

 
 
 

Bonnewitz Avenue Extension

 

Bonnewitz Avenue Extension

 

City of Van Wert, Van Wert County

Please click here for bid tab results.

Project awarded to Fenson Contracting LLC, Fort Jennings, Ohio

 
 
 

Lift Station Improvement Projects

 

Lift Station Improvement Projects

 

Village of Wayne, Wood County

Please click here for bid tab results.

Project awarded to Geo. Gradel Co., Toledo, Ohio

 
 
 

2024 Hardscape Projects

 

2024 Hardscape Projects

 

Centerville-Washington Park District, Montgomery County

Please click here for bid tab results.

Project awarded to No award. Project will be rebid.

 
 
 

Bluffton Soccer Complex – Storm Infrastructure Project

 

Bluffton Soccer Complex – Storm Infrastructure Project

 

Village of Bluffton, Allen County

Please click here for bid tab results.

Project awarded to Hohenbrink Excavating LLC, Findlay, Ohio

 
 
 

Butler Street Reconstruction, PH. 1

 

Butler Street Reconstruction, PH. 1

 

Village of Fort Recovery, Mercer County

Please click here for bid tab results.

Project awarded to Tom's Construction, Inc., St. Henry, Ohio

 
 
 

Vine Street Water Tower Rehab

 

Vine Street Water Tower Rehab

 

Village of Blanchester, Clinton County

Please click here for bid tab results.

Project awarded to Clearcreek Coatings, LTD, New Carlisle, Ohio

 
 
 

Batavia Township Parks Parking Lot Resurfacing

 

Batavia Township Parks Parking Lot Resurfacing

 

Batavia Township, Clermont County

Please click here for bid tab results.

Project awarded to Fillmore Construction LLC, Leesburg, Ohio

 
 
 

Forest Avenue Reconstruction

 

Forest Avenue Reconstruction

 

City of South Lebanon, Warren County

Please click here for bid tab results.

Project awarded to Benchmark Land Management, LLC, West Chester, Ohio

 
 
 

Ada Fire Hydrant Replacements

 

Ada Fire Hydrant Replacements

 

Hardin County Board of Commissioners

Please click here for bid tab results.

Project awarded to Hohenbrink Excavating LLC, Findlay, Ohio

 
 
 

2024 Street Resurfacing Project

 

2024 Street Resurfacing Project

 

City of Delphos, Allen County

Please click here for bid tab results.

Project awarded to Bluffton Paving, Inc., Bluffton, Ohio

 
 
 

Cherokee and Main Water Main

 

Cherokee and Main Water Main

 

City of Loveland, Hamilton County

Project awarded to ... No award. Project will be rebid.

 
 
 

Parkview Curb Ramp Replacement

 

Parkview Curb Ramp Replacement

 

Auglaize County Board of Commissioners

Please click here for bid tab results.

Project awarded to D.L. Smith Concrete LLC, Norwalk, Ohio

 
 
 

Main Street Traffic Signal Battery Backup Project

 

Main Street Traffic Signal Battery Backup Project

 

Hardin County Board of Commissioners

Project awarded to ... No award. Project will be rebid.

 
 
 

Main Street Water Main Replacement

 

Main Street Water Main Replacement

 

City of Van Wert, Van Wert County

Please click here for bid tab results.

Project awarded to Hohenbrink Excavating, LLC, Findlay, OH

 
 
 

Pocono Drive Utility Improvements

 

Pocono Drive Utility Improvements

 

Village of Bluffton, Hancock County

Please click here for bid tab results.

Project awarded to Beaverdam Contracting, Inc., Bluffton, Ohio

 
 
 

Franklin Road Water Main and Street Improvements, Phase 2

 

Franklin Road Water Main and Street Improvements, Phase 2

 

Village of Waynesville, Warren County

Please click here for bid tab results.

Project awarded to Smithcorp Inc., Cincinnati, Ohio

 
 
 

Lane Street and High Street Improvements

 

Lane Street and High Street Improvements

 

Village of Port Jefferson, Shelby County

Please click here for bid tab results.

Project awarded to Sturm Construction Inc., Sidney, Ohio

 
 
 

S. Howard Water Main Replacement, Phase 2

 

S. Howard Water Main Replacement, Phase 2

 

Village of Sabina, Clinton County

Please click here for bid tab results.

Project awarded to Waugh Construction LLC, Gallipolis, Ohio

 
 
 

Elm Street Culvert Replacement

 

Elm Street Culvert Replacement

 

Village of Spencerville, Allen County

Please click here for bid tab results.

Project awarded to Fenson Contracting LLC, Fort Jennings, Ohio

 
 
 

Water Meter Replacement REBID

 

Water Meter Replacement REBID

 

Village of Yellow Springs, Greene County

Please click here for bid tab results.

Project awarded to Neptune Equipment Company, Inc., Cincinnati, Ohio

 
 
 

US Route 40 Water Main Replacement

 

US Route 40 Water Main Replacement

 

Village of West Jefferson, Madison County

Please click here for bid tab results.

Project awarded to Fillmore Construction LLC, Leesburg, Ohio

 
 
 

Third Ward Storm Sewer Improvements, Phase 1

 

Third Ward Storm Sewer Improvements, Phase 1

 

City of London, Madison County

Please click here for bid tab results.

Project awarded to Fillmore Construction LLC, Leesburg, Ohio

 
 
 

2024 Street Resurfacing Project

 

2024 Street Resurfacing Project

 

Village of New Knoxville, Auglaize County

Please click here for bid tab results.

Project awarded to Shinn Bros. Inc., Celina, OH

 
 
 

S. East Street Bridge Replacement

 

S. East Street Bridge Replacement

 

Village of Bethel, Clermont County

Please click here for bid tab results.

Project awarded to Fillmore Construction LLC, Leesburg, Ohio

 
 
 

Water System Improvements – Phase 2

 

Water System Improvements – Phase 2

 

Village of Middleport, Meigs County

Please click here for bid tab results.

Project awarded to Tribute Contracting & Consultants, LLC, South Point, Ohio

 
 
 

2024-1 CCMG Saratoga Project

 

2024-1 CCMG Saratoga Project

 

Town of Saratoga, Randolph County

Please click here for bid tab results.

Project awarded to Dirt Works & Asphalt Paving Inc., Parker City, IN

 
 
 

2024-1 CCMG Jay County Project

 

2024-1 CCMG Jay County Project

 

Jay County

Please click here for bid tab results.

Project awarded to Brooks Construction Co Inc., Fort Wayne, IN

 
 
 

DJFS Repaving Project

 

DJFS Repaving Project

 

Clinton County Land Bank

Please click here for bid tab results.

Project awarded to Fillmore Construction LLC, Leesburg, Ohio

 
 
 

Cross Street Drainage Project

 

Cross Street Drainage Project

 

Village of Unionville Center

Please click here for bid tab results.

Project awarded to Dirt Slingers Excavating

 
 
 

Clay Street Water Main Replacement

 

Clay Street Water Main Replacement

 

City of Delphos, Allen County

Please click here for bid tab results.

Project awarded to Hohenbrink Excavating LLC, Findlay, Ohio

 
 
 

Park Street Water & Roadway Improvements

 

Park Street Water & Roadway Improvements

 

Village of Fort Loramie, Shelby County

Please click here for bid tab results.

Project awarded to Tom's Construction, Inc., St. Henry, Ohio

 
 
 

2024 Paving Program

 

2024 Paving Program

 

Village of Russia, Shelby County

Please click here for bid tab results.

Project awarded to Fillmore Construction, Leesburg, Ohio

 
 
 

Mason Morrow Millgrove Road Widening Phase 2

 

Mason Morrow Millgrove Road Widening Phase 2

 

City of South Lebanon, Warren County

Please click here for bid tab results.

Project awarded to Fillmore Construction, Leesburg, Ohio

 
 
 

Water Tower Demolition

 

Water Tower Demolition

 

Defiance County Commissioners

Please click here for bid tab results.

Project awarded to Baumann Enterprises, Inc., Garfield Heights, Ohio

 
 
 

Fourth Street Watermain Replacement

 

Fourth Street Watermain Replacement

 

City of Delphos, Allen County

Please click here for bid tab results.

Project awarded to Brenneman Excavating, Inc., Elida, OH

 
 
 

Orchard View and Orchard Circle Improvements, Phase 1

 

Orchard View and Orchard Circle Improvements, Phase 1

 

Village of Blanchester, Clinton County

Please click here for bid tab results.

Project awarded to Panetta Excavating Inc., Blanchester, Ohio

 
 
 

S. Church Street Reconstruction

 

S. Church Street Reconstruction

 

Village of Jamestown, Greene County

Please click here for bid tab results.

Project awarded to Fillmore Construction LLC, Leesburg, Ohio

 
 
 

US 23 SR 103 Storm Improvements

 

US 23 SR 103 Storm Improvements

 

Village of Carey, Wyandot County

Please click here for bid tab results.

Project awarded to Beaverdam Contracting, Inc., Bluffton, Ohio

 
 
 

South Patterson Street Reconstruction Phase 1

 

South Patterson Street Reconstruction Phase 1

 

Village of Carey, Wyandot County

Please click here for bid tab results.

Project awarded to Hohenbrink Excavating LLC, Ottawa, Ohio

 
 
 

Loveland Miamiville Sidewalk & Water Main, Phase 2

 

Loveland Miamiville Sidewalk & Water Main, Phase 2

 

City of Loveland, Clermont County

Please click here for bid tab results.

Project awarded to Majors Enterprises, Inc., Monroe, Ohio

 
 
 

Water Meter Replacement

 

Water Meter Replacement

 

Village of Yellow Springs, Greene County

Project awarded to ... All bids have been rejected. Project will be rebid.

 
 
 

Loramie Creek Drive & Indian Trail Repaving

 

Loramie Creek Drive & Indian Trail Repaving

 

Village of Fort Loramie, Shelby County

Please click here for bid tab results.

Project awarded to Buehler Asphalt Paving, Inc, St. Marys, Ohio

 
 
 

North Water Tower and SR 49 Water Extension

 

North Water Tower and SR 49 Water Extension

 

Village of Fort Recovery, Mercer County

Please click here for bid tab results.

Project awarded to Caldwell Tanks, Inc., Louisville, Kentucky

 
 
 

Sidewalk Improvements 2024

 

Sidewalk Improvements 2024

 

Village of Anna, Shelby County

Please click here for bid tab results.

Project awarded to Jagger Construction LLC, Lima, Ohio

 
 
 

Marysville Estates Drainage Improvements

 

Marysville Estates Drainage Improvements

 

UMH Properties, Inc.

Project awarded to Joe and Joe Contracting, LLC, Elida, Ohio

 
 
 

Meadow Lane Water Service Replacement

 

Meadow Lane Water Service Replacement

 

Village of Hicksville, Defiance County

Please click here for bid tab results.

Project awarded to Dangler Excavating, LLC, Paulding, Ohio

 
 
 

Water Treatment Plant Roof Rehabilitation

 

Water Treatment Plant Roof Rehabilitation

 

City of Delphos, Allen County

Please click here for bid tab results.

Project awarded to B&B Construction Inc., Doylestown, Ohio

 
 
 

Blosser Street Reconstruction Phase 3

 

Blosser Street Reconstruction Phase 3

 

Village of New Lebanon, Montgomery County

Please click here for bid tab results.

Project awarded to Coate Construction LLC, West Milton, Ohio

 
 
 

S. 5th Street & E. Main Street Projects

 

S. 5th Street & E. Main Street Projects

 

City of Tipp City, Miami County

Please click here for bid tab results.

Project awarded to Ranger Earthworks LLC, Casstown, Ohio

 
 
 

Paving Program 2024

 

Paving Program 2024

 

Village of West Jefferson, Madison County

Please click here for bid tab results.

Project awarded to Cox Paving LLC, Washington Courthouse, Ohio

 
 
 

Main Street Pedestrian Crossing REBID

 

Main Street Pedestrian Crossing REBID

 

Village of West Jefferson, Madison County

Please click here for bid tab results.

Project awarded to Perram Electric, Inc., Wadsworth, Ohio

 
 
 

East Highland Avenue Improvements

 

East Highland Avenue Improvements

 

Village of Ada, Hardin County

Please click here for bid tab results.

Project awarded to Hohenbrink Excavating LLC, Findlay, Ohio

 
 
 

Hayes Street Water Main Replacement

 

Hayes Street Water Main Replacement

 

Village of West Milton, Miami County

Please click here for bid tab results.

Project awarded to Finfrock Construction Co., Inc., Covington, Ohio

 
 
 

Waverly Street Sanitary Sewer Replacement

 

Waverly Street Sanitary Sewer Replacement

 

Village of Cridersville, Auglaize County

Please click here for bid tab results.

Project awarded to Tom's Construction, Inc., St. Henry, Ohio

 
 
 

WTP Discharge Replacement

 

WTP Discharge Replacement

 

Village of Enon, Clark County

Please click here for bid tab results.

Project awarded to Precise Boring of Ohio LLC, Lancaster, Ohio

 
 
 

Prospect Street Water Main Replacement

 

Prospect Street Water Main Replacement

 

Village of Beaverdam, Allen County

Please click here for bid tab results.

Project awarded to Fenson Contracting LLC, Fort Jennings, Ohio

 
 
 

2023-2 CCMG Cambridge City Project

 

2023-2 CCMG Cambridge City Project

 

Town of Cambridge City, Wayne County

Please click here for bid tab results.

Project awarded to Dave O'Mara Contractor, Inc., North Vernon, Indiana

 
 
 

2023-2 CCMG Portland Project

 

2023-2 CCMG Portland Project

 

City of Portland, Jay County

Please click here for bid tab results.

Project awarded to Scodeller Construction Inc., Plain City, Ohio

 
 
 

2023-2 CCMG Monroe Project

 

2023-2 CCMG Monroe Project

 

Town of Monroe, Adams County

Please click here for bid tab results.

Project awarded to Brooks Construction Co Inc., Fort Wayne, Indiana

 
 
 

Main Street Pedestrian Crossing

 

Main Street Pedestrian Crossing

 

Village of West Jefferson, Madison County

Project awarded to ... No award. Project will be rebid.

 
 
 

SR 119 Sidewalk Improvements

 

SR 119 Sidewalk Improvements

 

Village of Minster, Auglaize County

Please click here for bid tab results.

Project awarded to American Decorative Concrete LTD, Greenville, Ohio

 
 
 

Derby Road Reconstruction – Phase 2

 

Derby Road Reconstruction – Phase 2

 

Jefferson Township, Montgomery County

Please click here for bid tab results.

Project awarded to Fillmore Construction LLC, Leesburg, Ohio

 
 
 

Sanitary Sewer Collection System Improvements

 

Sanitary Sewer Collection System Improvements

 

Town of Geneva, Adams County

Please click here for bid tab results.

Project awarded to Bunn Excavating, Inc., Fort Wayne, Indiana

 
 
 

Hay Avenue Phase 2 Reconstruction

 

Hay Avenue Phase 2 Reconstruction

 

City of Brookville, Montgomery County

Please click here for bid tab results.

Project awarded to M&T Excavating, Bradford, Ohio

 
 
 

2023-2 CCMG Redkey Project

 

2023-2 CCMG Redkey Project

 

Town of Redkey, Jay County

Please click here for bid tab results.

Project awarded to Brooks Construction Co Inc., Fort Wayne, Indiana

 
 
 

2023-2 CCMG Lynn Project

 

2023-2 CCMG Lynn Project

 

Town of Lynn, Randolph County

Please click here for bid tab results.

Project awarded to E&B Paving, LLC, Daleville, Indiana

 
 
 

2023-2 CCMG Dunkirk Project

 

2023-2 CCMG Dunkirk Project

 

City of Dunkirk, Jay County

Please click here for bid tab results.

Project awarded to Brooks Construction Co Inc., Fort Wayne, Indiana

 
 
 

Patterson Property Multi-Use Path

 

Patterson Property Multi-Use Path

 

City of Washington Court House, Fayette County

Please click here for bid tab results.

Project awarded to Fillmore Construction LLC, Leesburg, Ohio

 
 
 

Civic Center Waterline Replacement

 

Civic Center Waterline Replacement

 

Miami Township, Clermont County

Please click here for bid tab results.

Project awarded to Ford Development Corp., Cincinnati, Ohio

 
 
 

Elm Street and Butler Street Traffic Signal

 

Elm Street and Butler Street Traffic Signal

 

Village of Fort Recovery, Mercer County

Please click here for bid tab results.

Project awarded to Capital Electric Line Builders, Dayton, Ohio

 
 
 

Wolf Creek Water Main Replacement

 

Wolf Creek Water Main Replacement

 

City of Brookville, Montgomery County

Please click here for bid tab results.

Project awarded to Tom's Construction, Inc., St. Henry, Ohio

 
 
 

Water Meter Replacement

 

Water Meter Replacement

 

Village of Russells Point, Logan County

Please click here for bid tab results.

Project awarded to Everett J. Prescott, Inc., Huber Heights, Ohio

 
 
 

Water Tower Replacement and Distribution System Improvements

 

Water Tower Replacement and Distribution System Improvements

 

Town of Lynn, Randolph County

Please click here for bid tab results.

Project awarded to Pittsburg Tank & Tower Co., Inc., Henderson, Kentucky

 
 
 

Sanitary Rehab Phase 20

 

Sanitary Rehab Phase 20

 

Village of New Lebanon, Montgomery County

Please click here for bid tab results.

Project awarded to Miller Pipeline, LLC, Indianapolis, Indiana

 
 
 

West Broadway Storm Sewer Project

 

West Broadway Storm Sewer Project

 

City of South Lebanon, Warren County

Please click here for bid tab results.

Project awarded to KT Holden Construction LLC, Lebanon, Ohio

 
 
 

SR 28 & Lorven Signal Modifications

 

SR 28 & Lorven Signal Modifications

 

Miami Township, Clermont County

Please click here for bid tab results.

Project awarded to Bansal Construction, Fairfield, Ohio

 
 
 

Cornelia Water Main Replacement

 

Cornelia Water Main Replacement

 

Village of Hicksville, Defiance County

Please click here for bid tab results.

Project awarded to Hohenbrink Excavating LLC, Findlay, Ohio

 
 
 

City Park Improvements CDBG Walking Paths

 

City Park Improvements CDBG Walking Paths

 

City of Brookville, Montgomery County

Please click here for bid tab results.

Project awarded to Husac Paving & Excavating Inc., W. Harrison, Indiana

 
 
 

Smyrna Road Improvements

 

Smyrna Road Improvements

 

Franklin Township Trustees, Clermont County

Please click here for bid tab results.

Project awarded to Fillmore Construction LLC, Leesburg, Ohio

 
 
 

Russia Park Pavilion and Splash Pad

 

Russia Park Pavilion and Splash Pad

 

Village of Russia, Shelby County

Project awarded to Level MB Construction, Troy, Ohio

 
 
 

Russells Point Storm Improvements

 

Russells Point Storm Improvements

 

Village of Russells Point, Logan County

Please click here for bid tab results.

Project awarded to Helms & Sons Excavating, Inc., Findlay, Ohio

 
 
 

Veteran’s Park Water Main Connection

 

Veteran’s Park Water Main Connection

 

City of Wapakoneta, Auglaize County

Please click here for bid tab results.

Project awarded to Fenson Contracting LLC, Fort Jennings, Ohio

 
 
 

23-12 Brooklyn Avenue Sewer Diversion

 

23-12 Brooklyn Avenue Sewer Diversion

 

City of Sidney, Ohio

Please click here for bid tab results.

Project awarded to J & J Schlaegel, Inc., Urbana, Ohio

 
 
 

Sycamore Street Valve Replacement

 

Sycamore Street Valve Replacement

 

Village of Columbus Grove, Putnam County

Please click here for bid tab results.

Project awarded to Hohenbrink Excavating LLC, Findlay, Ohio

 
 
 

Harrison Avenue Improvements

 

Harrison Avenue Improvements

 

City of Loveland, Clermont County

Please click here for bid tab results.

Project awarded to Ford Development Corp., Cincinnati, Ohio

 
 
 

Elizabeth Street Storm Control

 

Elizabeth Street Storm Control

 

Village of Spencerville, Allen County

Please click here for bid tab results.

Project awarded to VTF Excavation, LLC of Celina, Ohio

 
 
 

Van Wert 2023 Street Maintenance

 

Van Wert 2023 Street Maintenance

 

City of Van Wert, Van Wert County

Please click here for bid tab results.

Project awarded to The Shelly Company, Findlay, Ohio

 
 
 

Water Treatment Plant Roof Replacements

 

Water Treatment Plant Roof Replacements

 

City of Van Wert, Van Wert County

Please click here for bid tab results.

Project awarded to Bebout and Houg Roofing and Siding Inc., Van Wert, Ohio

 
 
 

North End Sanitary Rehabilitation

 

North End Sanitary Rehabilitation

 

Village of West Milton, Miami County

Please click here for bid tab results.

Project awarded to Advanced Rehabilitation Technology, LLC for Contract A and Miller Pipeline, LLC for Contract B

 
 
 

Eastmoor, Park and Plum Street Reconstruction

 

Eastmoor, Park and Plum Street Reconstruction

 

Village of New Bremen, Auglaize County

Please click here for bid tab results.

Project awarded to Brenneman Excavating Inc., Elida, Ohio

 
 
 

Wiggs/Gwendolyn Street Improvements

 

Wiggs/Gwendolyn Street Improvements

 

Village of Fort Recovery, Mercer County

Please click here for bid tab results.

Project awarded to PAB Construction Co., Coldwater, Ohio

 
 
 

Franklin Road Water Main and Street Improvements, Phase 1

 

Franklin Road Water Main and Street Improvements, Phase 1

 

Village of Waynesville, Warren County

Please click here for bid tab results.

Project awarded to KT Holden Construction LLC, Lebanon, Ohio

 
 
 

Seventh & Paris Street Reconstruction

 

Seventh & Paris Street Reconstruction

 

Village of Minster, Auglaize County

Please click here for bid tab results.

Project awarded to Hohenbrink Excavating LLC, Findlay, Ohio

 
 
 

Sixth & West Seventh Street Reconstruction

 

Sixth & West Seventh Street Reconstruction

 

Village of Minster, Auglaize County

Please click here for bid tab results.

Project awarded to Fenson Contracting LLC, Fort Jennings, Ohio

 
 
 

Wilson and Grant Storm and Street Improvements

 

Wilson and Grant Storm and Street Improvements

 

Village of Harveysburg, Warren County

Please click here for bid tab results.

Project awarded to KT Holden Construction LLC, Lebanon, Ohio

 
 
 

2023 Street Maintenance

 

2023 Street Maintenance

 

Village of Spencerville, Allen County

Please click here for bid tab results.

Project awarded to Beaverdam Contracting, Inc., Bluffton, Ohio

 
 
 

Paving Program 2023, Waite Avenue & Homeway Drive

 

Paving Program 2023, Waite Avenue & Homeway Drive

 

Village of New Lebanon, Montgomery County

Please click here for bid tab results.

Project awarded to Butler Asphalt, LLC, Vandalia, Ohio

 
 
 

3rd Street Water Main Replacement and Street Resurfacing

 

3rd Street Water Main Replacement and Street Resurfacing

 

Village of Waynesville, Warren County

Please click here for bid tab results.

Project awarded to Smith Corp Inc., Cincinnati, Ohio

 
 
 

Charity Street Storm Sewer Improvements

 

Charity Street Storm Sewer Improvements

 

Village of Bethel, Clermont County

Please click here for bid tab results.

Project awarded to Fillmore Construction LLC, Leesburg, Ohio

 
 
 

Municipal Park Hill – Phase 1

 

Municipal Park Hill – Phase 1

 

Village of West Milton, Miami County

Please click here for bid tab results.

Project awarded to Coate Construction LLC, West Milton, Ohio

 
 
 

Garau Street Water Main Replacement

 

Garau Street Water Main Replacement

 

Village of Bluffton, Allen County

Please click here for bid tab results.

Project awarded to Beaverdam Contracting, Inc., Bluffton, Ohio

 
 
 

Geiger Street Water Main Replacement

 

Geiger Street Water Main Replacement

 

Village of Bluffton, Allen County

Please click here for bid tab results.

Project awarded to Beaverdam Contracting, Inc., Bluffton, Ohio

 
 
 

West Main Street Reconstruction

 

West Main Street Reconstruction

 

Village of Russia, Shelby County

Please click here for bid tab results.

Project awarded to Brumbaugh Construction, Inc., Arcanum, Ohio

 
 
 

2023-1 CCMG Geneva Project

 

2023-1 CCMG Geneva Project

 

Town of Geneva, Adams County

Please click here for bid tab results.

Project awarded to Brooks Construction Co Inc., Fort Wayne, Indiana

 
 
 

2023-1 CCMG Jay County Project

 

2023-1 CCMG Jay County Project

 

Jay County

Please click here for bid tab results.

Project awarded to Milestone Contractors, L.P., Richmond, Indiana

 
 
 

North Main Curb and Curb Ramp Replacement

 

North Main Curb and Curb Ramp Replacement

 

City of New Carlisle, Clark County

Please click here for bid tab results.

Project awarded to A&B Asphalt, Corp., Springfield, Ohio

 
 
 

S. Cass St. & Central St. Water Main Replacement

 

S. Cass St. & Central St. Water Main Replacement

 

City of Delphos, Allen County

Please click here for bid tab results.

Project awarded to Hohenbrink Excavating LLC, Findlay, Ohio

 
 
 

Miami St. Water Main REBID

 

Miami St. Water Main REBID

 

Village of West Milton, Miami County

Please click here for bid tab results.

Project awarded to Outdoor Enterprise, LLC, Troy, Ohio

 
 
 

Park Shelter House REBID

 

Park Shelter House REBID

 

Village of Cridersville, Auglaize County

Please click here for bid tab results.

Project awarded to Norwalk Concrete Industries, Norwalk, Ohio

 
 
 

Water Street Reconstruction

 

Water Street Reconstruction

 

City of Wapakoneta, Auglaize County

Please click here for bid tab results.

Project awarded to RD Jones Excavating Inc., Harrod, Ohio

 
 
 

Fenwick Drive Phase II Street & Drainage Improvement

 

Fenwick Drive Phase II Street & Drainage Improvement

 

New Carlisle, Ohio

Please click here for bid tab results.

Project awarded to Sturm Construction

 
 
 

E. Seventh Street Paving

 

E. Seventh Street Paving

 

City of Delphos, Allen County

Please click here for bid tab results.

Project awarded to Bluffton Paving, Inc., Bluffton, Ohio

 
 
 

Sanitary Sewer Rehabilitation Phase 1 Rebid

 

Sanitary Sewer Rehabilitation Phase 1 Rebid

 

Village of Jackson Center, Shelby County

Please click here for bid tab results.

Project awarded to Advanced Rehabilitation Technology, LLC of Bryan, Ohio

 
 
 

Park Shelter House

 

Park Shelter House

 

Village of Cridersville, Auglaize County

Please click here for bid tab results.

Project awarded to ... No award. Project will be rebid.

 
 
 

Loveland Miamiville Sidewalk, Phase 1

 

Loveland Miamiville Sidewalk, Phase 1

 

City of Loveland, Clermont County

Please click here for bid tab results.

Project awarded to Adleta Inc., Cincinnati, Ohio

 
 
 

Clepper Park Pickleball and Multi-Use Courts

 

Clepper Park Pickleball and Multi-Use Courts

 

Union Township, Clermont County

Please click here for bid tab results.

Project awarded to Barry L. Brown Paving, Fairfield, Ohio

 
 
 

Public Alley Water

 

Public Alley Water

 

Village of Spencerville, Allen County

Please click here for bid tab results.

Project awarded to Beaverdam Contracting, Inc., Bluffton, Ohio

 
 
 

2023 Paving Program

 

2023 Paving Program

 

Village of Bethel, Clermont County

Please click here for bid tab results.

Project awarded to Brown County Construction Co., Inc., Aberdeen, Ohio

 
 
 

2023 Street Maintenance

 

2023 Street Maintenance

 

Village of Carey, Wyandot County

Please click here for bid tab results.

Project awarded to The Shelly Company, Findlay, Ohio

 
 
 

Miami St. Water Main

 

Miami St. Water Main

 

Village of West Milton, Miami County

Please click here for bid tab results.

Project awarded to ... No award. Project will be rebid.

 
 
 

Deershadow Road Paving & Catch Basin Replacement

 

Deershadow Road Paving & Catch Basin Replacement

 

Village of Maineville, Warren County

Please click here for bid tab results.

Project awarded to Fillmore Construction LLC, Leesburg, Ohio

 
 
 

Scott Avenue Lead Line Replacement

 

Scott Avenue Lead Line Replacement

 

City of Kenton, Hardin County

Please click here for bid tab results.

Project awarded to VTF Excavation, LLC, Celina, Ohio

 
 
 

Sanitary Sewer Rehabilitation Phase 1

 

Sanitary Sewer Rehabilitation Phase 1

 

Village of Jackson Center, Shelby County

Please click here for bid tab results.

Project awarded to ... No award. Project will be rebid.

 
 
 

Columbus Street Reconstruction Phase 2

 

Columbus Street Reconstruction Phase 2

 

Village of West Liberty, Logan County

Please click here for bid tab results.

Project awarded to J & J Schlaegel, Inc., Urbana, Ohio

 
 
 

Ridgeway Basketball Court Installation Project

 

Ridgeway Basketball Court Installation Project

 

Hardin County Board of Commissioners

Please click here for bid tab results.

Project awarded to Joe and Joe Construction LLC

 
 
 

2022 Street Resurfacing

 

2022 Street Resurfacing

 

Village of Alger, Hardin County

Please click here for bid tab results.

Project awarded to Bluffton Paving Inc., Bluffton, Ohio

 
 
 

Grant Park Barn

 

Grant Park Barn

 

Centerville-Washington Park District, Montgomery County

Please click here for bid tab results.

Project awarded to Oheil Site Solutions, Centerville, Ohio

 
 
 

East Fancy Street Water Main Replacement REBID

 

East Fancy Street Water Main Replacement REBID

 

Village of Blanchester, Clinton County

Please click here for bid tab results.

Project awarded to JTM Smith Construction, Inc., Fayetteville, Ohio

 
 
 

2022-2 CCMG Parker City Project

 

2022-2 CCMG Parker City Project

 

Town of Parker City, Randolph County

Please click here for bid tab results.

Project awarded to Dirt Works & Asphalt Paving Inc., Parker City, Indiana

 
 
 

2022-2 CCMG Monroe Project

 

2022-2 CCMG Monroe Project

 

Town of Monroe, Adams County

Please click here for bid tab results.

Project awarded to KBL Transport LLC, Portland, Indiana

 
 
 

S.R. 103 Curb Repair

 

S.R. 103 Curb Repair

 

Village of Bluffton, Allen County

Please click here for bid tab results.

Project awarded to Smith Paving & Excavating Inc., Norwalk, Ohio

 
 
 

Vision Drive Extension

 

Vision Drive Extension

 

City of Van Wert, Van Wert County

Please click here for bid tab results.

Project awarded to Kauser Excavating LLC, Antwerp, Ohio

 
 
 

Water Tower Rehabilitation

 

Water Tower Rehabilitation

 

Village of Yellow Springs, Greene County

Please click here for bid tab results.

Project awarded to Viking Painting, LLC, La Vista, Nebraska

 
 
 

Youth Park Court Improvements

 

Youth Park Court Improvements

 

Village of Fort Loramie, Shelby County

Please click here for bid tab results.

Project awarded to Shinn Bros. Inc., Celina, Ohio

 
 
 

2022-2 CCMG Farmland Project

 

2022-2 CCMG Farmland Project

 

Town of Farmland, Randolph County

Please click here for bid tab results.

Project awarded to Milestone Contractors, L.P., Richmond, Indiana

 
 
 

Walker Way Extension

 

Walker Way Extension

 

Village of West Jefferson, Madison County

Please click here for bid tab results.

Project awarded to J & J Schlaegel, Inc., Urbana, Ohio

 
 
 

2023 Paving Program

 

2023 Paving Program

 

Village of West Jefferson, Madison County

Please click here for bid tab results.

Project awarded to Strawser Paving Company, Columbus, Ohio

 
 
 

2022-2 CCMG Lynn Project

 

2022-2 CCMG Lynn Project

 

Town of Lynn, Randolph County

Please click here for bid tab results.

Project awarded to Milestone Contractors, L.P., Richmond, Indiana

 
 
 

SR 119 Water and Sewer Extension

 

SR 119 Water and Sewer Extension

 

Village of Minster, Auglaize County

Please click here for bid tab results.

Project awarded to Donald A. Sommer Inc., Anna, Ohio

 
 
 

2022-2 CCMG Geneva Project

 

2022-2 CCMG Geneva Project

 

Town of Geneva, Adams County

Please click here for bid tab results.

Project awarded to Brooks Construction Co Inc., Fort Wayne, Indiana

 
 
 

2022-2 CCMG Dunkirk Project

 

2022-2 CCMG Dunkirk Project

 

City of Dunkirk, Jay County

Please click here for bid tab results.

Project awarded to Brooks Construction Co Inc., Fort Wayne, Indiana

 
 
 

2022-2 CCMG Portland Project

 

2022-2 CCMG Portland Project

 

City of Portland, Jay County

Please click here for bid tab results.

Project awarded to Milestone Contractors, L.P., Richmond, Indiana

 
 
 

2022-2 CCMG Redkey Project

 

2022-2 CCMG Redkey Project

 

Town of Redkey, Jay County

Please click here for bid tab results.

Project awarded to Brooks Construction Co Inc., Fort Wayne, Indiana

 
 
 

Lane Street Resurfacing

 

Lane Street Resurfacing

 

Village of Fort Loramie, Shelby County

Please click here for bid tab results.

Project awarded to Wagner Paving, Inc., Laura, Ohio

 
 
 

Maple Lane Sewer Separation

 

Maple Lane Sewer Separation

 

Village of Hicksville, Defiance County

Please click here for bid tab results.

Project awarded to Fenson Contracting LLC, Fort Jennings, Ohio

 
 
 

Karl Brown Pedestrian Crossing

 

Karl Brown Pedestrian Crossing

 

City of Loveland, Clermont County

Please click here for bid tab results.

Project awarded to Adleta Inc., Cincinnati, Ohio

 
 
 

Eggerss Stadium Sewer Replacement REBID

 

Eggerss Stadium Sewer Replacement REBID

 

City of Van Wert, Van Wert County

Please click here for bid tab results.

Project awarded to RD Jones Excavating Inc., Harrod, Ohio

 
 
 

Business 28 Sidewalk & Water Main, Cook Rd Sidewalk

 

Business 28 Sidewalk & Water Main, Cook Rd Sidewalk

 

Miami Township, Clermont County

Please click here for bid tab results.

Project awarded to Welsh Excavation Co. Inc., Cleves, Ohio

 
 
 

Blosser Street Reconstruction Phase 1 & 2

 

Blosser Street Reconstruction Phase 1 & 2

 

Village of New Lebanon, Montgomery County

Please click here for bid tab results.

Project awarded to Coate Construction LLC, West Milton, Ohio

 
 
 

Bremen Street Improvements, Phase 2

 

Bremen Street Improvements, Phase 2

 

Village of New Knoxville, Auglaize County

Please click here for bid tab results.

Project awarded to Fenson Contracting LLC, Fort Jennings, Ohio

 
 
 

Wastewater Treatment Plant Clarifier Rehabilitation

 

Wastewater Treatment Plant Clarifier Rehabilitation

 

City of New Carlisle, Clark County

Please click here for bid tab results.

Project awarded to Peterson Construction Company, Wapakoneta, Ohio

 
 
 

Pauline Drive Stormwater Project

 

Pauline Drive Stormwater Project

 

City of South Lebanon, Warren County

Please click here for bid tab results.

Project awarded to SiteWORX, LLC, Lebanon, Ohio

 
 
 

Eggerss Stadium Sewer Replacement

 

Eggerss Stadium Sewer Replacement

 

City of Van Wert, Van Wert County

Please click here for bid tab results.

Project awarded to ... No award. Project will be rebid.

 
 
 

22-19 Broadway Avenue Water Main Replacement

 

22-19 Broadway Avenue Water Main Replacement

 

City of Sidney, Ohio

Please click here for bid tab results.

Project awarded to Sturm Construction

 
 
 

Street Resurfacing

 

Street Resurfacing

 

Village of Anna, Shelby County

Please click here for bid tab results.

Project awarded to Fillmore Construction LLC, Leesburg, Ohio

 
 
 

Bayside and Barrett Water Main Replacement, Phase 2

 

Bayside and Barrett Water Main Replacement, Phase 2

 

Montgomery County, Ohio

Please click here for bid tab results.

Project awarded to Milcon Concrete, Inc.

 
 
 

King Street Water Main Extension

 

King Street Water Main Extension

 

Village of Yellow Springs, Greene County

Please click here for bid tab results.

Project awarded to JNT Excavating LLC, Independence, KY

 
 
 

North Main Street Water Main Replacement

 

North Main Street Water Main Replacement

 

Village of Georgetown, Brown County

Please click here for bid tab results.

Project awarded to Ford Development Corp., Cincinnati, Ohio

 
 
 

Dellwood Estates Water Main Replacement

 

Dellwood Estates Water Main Replacement

 

Montgomery County, Ohio

Please click here for bid tab results.

Project awarded to Double Jay Construction

 
 
 

2" Galvanized Water Main Replacements

 

2" Galvanized Water Main Replacements

 

Village of Yellow Springs, Greene County

Please click here for bid tab results.

Project awarded to JNT Excavating LLC, Independence, KY

 
 
 

Sanitary Rehab Phase 19

 

Sanitary Rehab Phase 19

 

Village of New Lebanon, Montgomery County

Please click here for bid tab results.

Project awarded to Miller Pipeline, LLC, Indianapolis, Indiana

 
 
 

Lock 9 Park

 

Lock 9 Park

 

City of Piqua, Miami County

Project awarded to ... No award.

 
 
 

Main Street Watermain Replacement

 

Main Street Watermain Replacement

 

City of Brookville, Montgomery County

Please click here for bid tab results.

Project awarded to Associated Excavating Inc., Brookville, Ohio

 
 
 

Westbrook Road Resurfacing

 

Westbrook Road Resurfacing

 

City of Brookville, Montgomery County

Please click here for bid tab results.

Project awarded to Wagner Paving, Inc., Laura, Ohio

 
 
 

Grandview Boulevard Reconstruction

 

Grandview Boulevard Reconstruction

 

Village of Ada, Hardin County

Please click here for bid tab results.

Project awarded to Beaverdam Contracting, Inc., Bluffton, Ohio

 
 
 

Tocsin Sanitary Sewer Improvements

 

Tocsin Sanitary Sewer Improvements

 

Wells County Regional Sewer District, Wells County

Please click here for bid tab results.

Project awarded to ... No award. Project will be rebid.

 
 
 

Kingsland Sanitary Sewer Improvements

 

Kingsland Sanitary Sewer Improvements

 

Wells County Regional Sewer District, Wells County

Please click here for bid tab results.

Project awarded to VTF Excavation, LLC, Celina, Ohio

 
 
 

Amelia-Olive Branch Road Sidewalk Phase 2

 

Amelia-Olive Branch Road Sidewalk Phase 2

 

Batavia Township, Clermont County

Please click here for bid tab results.

Project awarded to Ford Development Corp., Cincinnati, Ohio

 
 
 

Water Transmission Main Replacement

 

Water Transmission Main Replacement

 

City of Greenville, Darke County

Please click here for bid tab results.

Project awarded to Brumbaugh Construction, Inc., Arcanum, Ohio

 
 
 

Kettlersville Road Repaving REBID

 

Kettlersville Road Repaving REBID

 

Village of Kettlersville, Shelby County

Please click here for bid tab results.

Project awarded to Wagner Paving, Inc., Laura, Ohio

 
 
 

North Ohio Street REBID

 

North Ohio Street REBID

 

City of Greenville, Darke County

Please click here for bid tab results.

Project awarded to Brumbaugh Construction, Inc., Arcanum, Ohio

 
 
 

Neville-Spur Culvert Replacements and Resurfacing

 

Neville-Spur Culvert Replacements and Resurfacing

 

Village of Neville, Clermont County

Please click here for bid tab results.

Project awarded to Fillmore Construction LLC, Leesburg, Ohio

 
 
 

East Fancy Street Water Main Replacement

 

East Fancy Street Water Main Replacement

 

Village of Blanchester, Clinton County

Please click here for bid tab results.

Project awarded to ... All bids have been rejected. Project will be rebid.

 
 
 

2022 Hardscape Improvements

 

2022 Hardscape Improvements

 

Centerville-Washington Park District, Montgomery County

Please click here for bid tab results.

Project awarded to Outdoor Enterprise, LLC, Troy, Ohio

 
 
 

Buckland Neighborhood Improvements

 

Buckland Neighborhood Improvements

 

Auglaize County Commissioners

Please click here for bid tab results.

Project awarded to Shinn Bros. Inc., Celina, Ohio

 
 
 

Westbrook and Albert Drainage Improvements

 

Westbrook and Albert Drainage Improvements

 

City of Brookville, Montgomery County

Please click here for bid tab results.

Project awarded to Associated Excavating Inc., Brookville, Ohio

 
 
 

South Howard Street Water REBID

 

South Howard Street Water REBID

 

Village of Sabina, Clinton County

Please click here for bid tab results.

Project awarded to Stauffer Site Services LLC, Morrow, Ohio

 
 
 

Kettlersville Road Repaving REBID

 

Kettlersville Road Repaving REBID

 

Village of Kettlersville, Shelby County

Please click here for bid tab results.

Project awarded to ... No award. Project will be rebid.

 
 
 

Carpenter Road Improvements

 

Carpenter Road Improvements

 

Sugarcreek Township, Greene County

Please click here for bid tab results.

Project awarded to Fillmore Construction LLC, Leesburg, Ohio

 
 
 

Bentley Road Intersection Improvements

 

Bentley Road Intersection Improvements

 

Village of Bluffton, Allen County

Please click here for bid tab results.

Project awarded to Hohenbrink Excavating LLC, Findlay, Ohio

 
 
 

2022 Street Maintenance

 

2022 Street Maintenance

 

City of Van Wert, Van Wert County

Please click here for bid tab results.

Project awarded to The Shelly Company, Findlay, Ohio

 
 
 

2022-1 CCMG Cambridge City Project

 

2022-1 CCMG Cambridge City Project

 

Town of Cambridge City, Wayne County

Please click here for bid tab results.

Project awarded to Milestone Contractors, L.P., Richmond, Indiana

 
 
 

2022 Street Maintenance

 

2022 Street Maintenance

 

Village of Yellow Springs, Greene County

Please click here for bid tab results.

Project awarded to Fillmore Construction LLC, Leesburg, Ohio

 
 
 

Paving Program 2022 - Clayton Road

 

Paving Program 2022 - Clayton Road

 

Village of New Lebanon, Montgomery County

Please click here for bid tab results.

Project awarded to Butler Asphalt, LLC, Vandalia, Ohio

 
 
 

Blosser Street Reconstruction Phase 1

 

Blosser Street Reconstruction Phase 1

 

Village of New Lebanon, Montgomery County

Please click here for bid tab results.

Project awarded to ... No award. Project will be rebid.

 
 
 

Walnut Street Resurfacing

 

Walnut Street Resurfacing

 

Village of Port Jefferson, Shelby County

Please click here for bid tab results.

Project awarded to Wagner Paving, Inc., Laura, Ohio

 
 
 

Westchester Subdivision Improvements REBID

 

Westchester Subdivision Improvements REBID

 

Village of West Jefferson, Madison County

Please click here for bid tab results.

Project awarded to Strawser Paving Company, Columbus, Ohio

 
 
 

Goshen Township Fire Station

 

Goshen Township Fire Station

 

Goshen Township, Clermont County

Project awarded to ... All bids have been rejected. Project canceled.

 
 
 

Reynolds and Oakland Culverts

 

Reynolds and Oakland Culverts

 

Village of Spencerville, Allen County

Please click here for bid tab results.

Project awarded to Fenson Contracting LLC, Fort Jennings, Ohio

 
 
 

Ash Street Bridge Replacement

 

Ash Street Bridge Replacement

 

Village of Bethel, Clermont County

Please click here for bid tab results.

Project awarded to Fillmore Construction LLC, Leesburg, Ohio

 
 
 

South Howard Street Water

 

South Howard Street Water

 

Village of Sabina, Clinton County

Please click here for bid tab results.

Project awarded to ... No award. Project will be rebid.

 
 
 

Kettlersville Road Repaving

 

Kettlersville Road Repaving

 

Village of Kettlersville, Shelby County

Project awarded to ... No award. Project will be rebid.

 
 
 

S. Main St. Watermain Replacement

 

S. Main St. Watermain Replacement

 

City of Delphos, Allen County

Please click here for bid tab results.

Project awarded to Hohenbrink Excavating LLC, Findlay, Ohio

 
 
 

Milligan Street Reconstruction

 

Milligan Street Reconstruction

 

Village of Fort Recovery, Mercer County

Please click here for bid tab results.

Project awarded to M&T Excavating, Bradford, Ohio

 
 
 

Lock Nine Park - Phase 1

 

Lock Nine Park - Phase 1

 

City of Piqua, Miami County

Project awarded to ... No award. Project will be rebid.

 
 
 

2022 Paving Program

 

2022 Paving Program

 

Goshen Township, Clermont County

Please click here for bid tab results.

Project awarded to Fillmore Construction LLC, Leesburg, Ohio

 
 
 

Westchester Subdivision Improvements

 

Westchester Subdivision Improvements

 

Village of West Jefferson, Madison County

Project awarded to ... No award. Project will be rebid.

 
 
 

Northmoor Drive Overlay

 

Northmoor Drive Overlay

 

Franklin Township Trustees, Shelby County

Please click here for bid tab results.

Project awarded to ... All bids have been rejected. Project will be rebid

 
 
 

2022 Street Maintenance Program

 

2022 Street Maintenance Program

 

Village of Carey, Wyandot County

Please click here for bid tab results.

Project awarded to Kokosing Construction Company, Inc., Mansfield, Ohio

 
 
 

Grant Park McEwen Road Entrance

 

Grant Park McEwen Road Entrance

 

Centerville-Washington Park District, Montgomery County

Please click here for bid tab results.

Project awarded to Brumbaugh Construction, Inc., Arcanum, Ohio

 
 
 

Harshman Road Concrete Median Repairs REBID

 

Harshman Road Concrete Median Repairs REBID

 

City of Riverside, Montgomery County

Please click here for bid tab results.

Project awarded to R.B. Jergens Contractors, Inc., Vandalia, Ohio

 
 
 

2022-1 CCMG Jay County Project

 

2022-1 CCMG Jay County Project

 

Jay County

Please click here for bid tab results.

Project awarded to Milestone Contractors, L.P., Richmond, Indiana

 
 
 

Storm Sewer Upgrades Phase 2

 

Storm Sewer Upgrades Phase 2

 

Village of Fort Loramie, Shelby County

Please click here for bid tab results.

Project awarded to Fenson Contracting LLC, Fort Jennings, Ohio

 
 
 

Dog Leg Road Water and Sanitary Extension

 

Dog Leg Road Water and Sanitary Extension

 

City of Vandalia, Montgomery County

Please click here for bid tab results.

Project awarded to Outdoor Enterprise, LLC, Troy, Ohio

 
 
 

National Pike (US 40) and Taylor Blair Road Traffic Signal

 

National Pike (US 40) and Taylor Blair Road Traffic Signal

 

Village of West Jefferson, Madison County

Please click here for bid tab results.

Project awarded to Miller Cable Company, Green Springs, Ohio

 
 
 

Dues Storm Sewer Reconstruction

 

Dues Storm Sewer Reconstruction

 

Village of Minster, Auglaize County

Please click here for bid tab results.

Project awarded to RD Jones Excavating Inc., Harrod, Ohio

 
 
 

S.R. 103 Sanitary Replacement

 

S.R. 103 Sanitary Replacement

 

Village of Bluffton, Hancock County

Please click here for bid tab results.

Project awarded to Beaverdam Contracting, Inc., Bluffton, Ohio

 
 
 

Lawn & Jackson Water Main Replacement

 

Lawn & Jackson Water Main Replacement

 

Village of Bluffton, Allen County

Please click here for bid tab results.

Project awarded to Hohenbrink Excavating LLC, Findlay, Ohio

 
 
 

Skinner St. Water Main Replacement

 

Skinner St. Water Main Replacement

 

City of Delphos, Allen County

Please click here for bid tab results.

Project awarded to All Purpose Contracting, Inc., Delphos, Ohio

 
 
 

2022 Asphalt Resurfacing Program

 

2022 Asphalt Resurfacing Program

 

City of Monroe, Butler County

Please click here for bid tab results.

Project awarded to John R. Jurgensen Co., Cincinnati, Ohio

 
 
 

South Water Storage Tank Rehabilitation

 

South Water Storage Tank Rehabilitation

 

Village of West Jefferson, Madison County

Please click here for bid tab results.

Project awarded to L.C. United Painting Co, Inc., Sterling Heights, Michigan

 
 
 

Columbus Street Storm Replacement

 

Columbus Street Storm Replacement

 

Hardin County Commissioners, Hardin County

Please click here for bid tab results.

Project awarded to Hohenbrink Excavating LLC, Findlay, Ohio

 
 
 

Harshman Road Concrete Median Repairs

 

Harshman Road Concrete Median Repairs

 

City of Riverside, Montgomery County

Project awarded to ... No award. Project will be rebid.

 
 
 

Austin Boulevard Sanitary Sewer Replacement

 

Austin Boulevard Sanitary Sewer Replacement

 

Montgomery County, Ohio

Please click here for bid tab results.

Project awarded to Milcon Concrete, Inc.

 
 
 

2022 Street Resurfacing

 

2022 Street Resurfacing

 

City of Delphos, Allen County

Please click here for bid tab results.

Project awarded to Bluffton Paving, Inc., Bluffton, Ohio

 
 
 

Bayside And Barrett Water Main Replacement, Phase 1

 

Bayside And Barrett Water Main Replacement, Phase 1

 

Montgomery County Environmental Services, Ohio

Please click here for bid tab results.

Project awarded to Milcon Concrete, Inc.

 
 
 

Storm Sewer Improvements 2021

 

Storm Sewer Improvements 2021

 

Village of Wayne, Wood County

Please click here for bid tab results.

Project awarded to B. Hill'z Excavating, Inc., Wayne, Ohio

 
 
 

Gormley Street Storm Improvements

 

Gormley Street Storm Improvements

 

Hardin County Commissioners

Please click here for bid tab results.

Project awarded to Beaverdam Contracting, Inc., Bluffton, Ohio

 
 
 

Craigville Sanitary Sewer

 

Craigville Sanitary Sewer

 

Wells County Regional Sewer District

Please click here for bid tab results.

Project awarded to VTF Excavation, LLC, Celina, Ohio

 
 
 

Espy Street Water Main Replacement

 

Espy Street Water Main Replacement

 

City of Kenton, Hardin County

Please click here for bid tab results.

Project awarded to RD Jones Excavating Inc., Harrod, Ohio

 
 
 

Lost Creek Climbing & Observation Tower – MIAM-029

 

Lost Creek Climbing & Observation Tower – MIAM-029

 

Miami County Park District, Miami County

Please click here for bid tab results.

Project awarded to Redpoint Adventures, Industry, Pennsylvania

 
 
 

N. Barron Street Utility Extensions

 

N. Barron Street Utility Extensions

 

City of Eaton, Preble County

Please click here for bid tab results.

Project awarded to C.G. Construction & Utilities, Inc., Miamisburg, Ohio

 
 
 

Murray Storm Sewer Improvements

 

Murray Storm Sewer Improvements

 

Wells County Commissioners, Wells County

Please click here for bid tab results.

Project awarded to VTF Excavation, LLC, Celina, Ohio

 
 
 

2022 Street Maintenance

 

2022 Street Maintenance

 

Village of Russia, Shelby County

Please click here for bid tab results.

Project awarded to Fillmore Construction LLC of Leesburg, Ohio

 
 
 

2022 ADA Compliance Program

 

2022 ADA Compliance Program

 

City of Monroe, Butler County

Please click here for bid tab results.

Project awarded to J-Co Concrete, LLC., Jackson, Ohio

 
 
 

Bill Yeck Trail Extension

 

Bill Yeck Trail Extension

 

Centerville-Washington Park District, Montgomery County

Please click here for bid tab results.

Project awarded to Outdoor Enterprise, LLC, Troy, Ohio

 
 
 

Silver Street Reconstruction

 

Silver Street Reconstruction

 

City of Wapakoneta, Auglaize County

Please click here for bid tab results.

Project awarded to Hohenbrink Excavating LLC of Findlay, Ohio

 
 
 

Loveland Schools 2022 Improvements

 

Loveland Schools 2022 Improvements

 

Loveland City Schools, Hamilton County

Please click here for bid tab results.

Project awarded to JK Meurer Corporation of Loveland, Ohio

 
 
 

Industrial Drive Reconstruction

 

Industrial Drive Reconstruction

 

Town of Lynn, Randolph County

Project awarded to Milestone Contractors, L.P., Richmond, Indiana

 
 
 

Morris and Hickory Reconstruction

 

Morris and Hickory Reconstruction

 

Town of Farmland, Randolph County

Please click here for bid tab results.

Project awarded to Dirt Works & Asphalt Paving Inc., Parker City, Indiana

 
 
 

Wells Street Sidewalk

 

Wells Street Sidewalk

 

Village of Moscow, Clermont County

Please click here for bid tab results.

Project awarded to Fillmore Construction LLC of Leesburg, Ohio

 
 
 

2022 Paving Program

 

2022 Paving Program

 

City of Riverside, Montgomery County

Please click here for bid tab results.

Project awarded to Fillmore Construction LLC, Leesburg, Ohio

 
 
 

Woodland Water Main Replacement

 

Woodland Water Main Replacement

 

City of Van Wert, Van Wert County

Project awarded to Sturm Construction, Sidney, Ohio

 
 
 

Loveland Safety Center Parking Improvements

 

Loveland Safety Center Parking Improvements

 

City of Loveland, Hamilton County

Please click here for bid tab results.

Project awarded to JK Meurer Corporation, Loveland, Ohio

 
 
 

2021-2 CCMG Portland Project

 

2021-2 CCMG Portland Project

 

City of Portland, Jay County

Please click here for bid tab results.

Project awarded to Milestone Contractors, L.P., Richmond, Indiana

 
 
 

2021-2 CCMG Dunkirk Project

 

2021-2 CCMG Dunkirk Project

 

City of Dunkirk, Jay County

Please click here for bid tab results.

Project awarded to Brooks Construction Co Inc., Fort Wayne, Indiana

 
 
 

2021-2 CCMG Cambridge City Project

 

2021-2 CCMG Cambridge City Project

 

Town of Cambridge City, Wayne County

Please click here for bid tab results.

Project awarded to Milestone Contractors, L.P., Richmond, Indiana

 
 
 

2021-2 CCMG Parker City Project

 

2021-2 CCMG Parker City Project

 

Town of Parker City, Randolph County

Please click here for bid tab results.

Project awarded to Brooks Construction Co Inc., Fort Wayne, Indiana

 
 
 

Water Valve Replacement

 

Water Valve Replacement

 

City of Delphos, Allen County

Please click here for bid tab results.

Project awarded to All Purpose Contracting, Inc., Delphos, Ohio

 
 
 

Cherry Street Water and Storm Improvements Phase 2

 

Cherry Street Water and Storm Improvements Phase 2

 

Village of Blanchester, Clinton County

Please click here for bid tab results.

Project awarded to Panetta Excavating Inc., Blanchester, Ohio

 
 
 

South Street Reconstruction - Phase 2

 

South Street Reconstruction - Phase 2

 

Village of Anna, Shelby County

Please click here for bid tab results.

Project awarded to PAB Construction Co., Coldwater, Ohio

 
 
 

Sanitary Rehab Phase 18

 

Sanitary Rehab Phase 18

 

Village of New Lebanon, Montgomery County

Please click here for bid tab results.

Project awarded to Miller Pipeline, LLC, Indianapolis, Indiana

 
 
 

Amelia-Olive Branch Road Sidewalk

 

Amelia-Olive Branch Road Sidewalk

 

Batavia Township, Clermont County

Please click here for bid tab results.

Project awarded to Fillmore Construction LLC, Leesburg, Ohio

 
 
 

Lead Water Service Replacement, Phase 1

 

Lead Water Service Replacement, Phase 1

 

City of Greenville, Darke County

Please click here for bid tab results.

Project awarded to Outdoor Enterprise, LLC, Troy, Ohio

 
 
 

East Main Street Sanitary Sewer Replacement

 

East Main Street Sanitary Sewer Replacement

 

Village of Cridersville, Auglaize County

Please click here for bid tab results.

Project awarded to Beaverdam Contracting, Inc., Bluffton, Ohio

 
 
 

N. Winter to Railroad Storm Improvements

 

N. Winter to Railroad Storm Improvements

 

Village of Yellow Springs, Greene County

Please click here for bid tab results.

Project awarded to Fillmore Construction LLC, Leesburg, Ohio

 
 
 

AUG-CR25A-3.29

 

AUG-CR25A-3.29

 

City of Wapakoneta, Auglaize County

Please click here for bid tab results.

Project awarded to Hohenbrink Excavating LLC, Ottawa, Ohio

 
 
 

Riverfront & First Stop Path

 

Riverfront & First Stop Path

 

Village of Moscow, Clermont County

Please click here for bid tab results.

Project awarded to Roberts Paving Inc., Mowrystown, Ohio

 
 
 

Chapel Road Sidewalk

 

Chapel Road Sidewalk

 

Batavia Township, Clermont County

Please click here for bid tab results.

Project awarded to Fillmore Construction LLC, Leesburg, Ohio

 
 
 

Broadway and 4th Street Sidewalk Improvements

 

Broadway and 4th Street Sidewalk Improvements

 

Village of Williamsburg, Clermont County

Please click here for bid tab results.

Project awarded to Fillmore Construction LLC of Leesburg, Ohio

 
 
 

Hay Avenue Reconstruction - Phase 1

 

Hay Avenue Reconstruction - Phase 1

 

City of Brookville, Montgomery County

Please click here for bid tab results.

Project awarded to Brumbaugh Construction, Inc., Arcanum, Ohio

 
 
 

East South Street Water Main Replacement

 

East South Street Water Main Replacement

 

Village of Carey, Wyandot County

Please click here for bid tab results.

Project awarded to Hohenbrink Excavating LLC, Findlay, Ohio

 
 
 

Commerce Drive Extension

 

Commerce Drive Extension

 

Village of Russia, Shelby County

Please click here for bid tab results.

Project awarded to Sturm Construction, Sidney, Ohio

 
 
 

Charles Snider Road Widening

 

Charles Snider Road Widening

 

Goshen Township, Clermont County

Please click here for bid tab results.

Project awarded to Rack & Ballauer Excavating Co. Inc., Hamilton, Ohio

 
 
 

Lewistown Sanitary Sewer REBID

 

Lewistown Sanitary Sewer REBID

 

Logan County Sewer District, Logan County

Please click here for bid tab results.

Project awarded to ... All bids have been rejected. Project canceled.

 
 
 

Seventh Street Reconstruction

 

Seventh Street Reconstruction

 

Village of Minster, Auglaize County

Please click here for bid tab results.

Project awarded to Brumbaugh Construction, Inc., Arcanum, Ohio

 
 
 

Bill Yeck Parking Lot

 

Bill Yeck Parking Lot

 

Centerville-Washington Park District, Greene County

Please click here for bid tab results.

Project awarded to Brumbaugh Construction, Inc. of Arcanum, Ohio

 
 
 

Jackson Center Detention Basin

 

Jackson Center Detention Basin

 

Village of Jackson Center, Shelby County

Please click here for bid tab results.

Project awarded to R.D. Jones Excavating Inc., Harrod, Ohio

 
 
 

Larchview Drive and Plainfield Road Improvements

 

Larchview Drive and Plainfield Road Improvements

 

Sycamore Township, Hamilton County

Please click here for bid tab results.

Project awarded to Ford Development Corp, Cincinnati, Ohio

 
 
 

Jefferson Street Resurfacing

 

Jefferson Street Resurfacing

 

City of Delphos, Allen County

Please click here for bid tab results.

Project awarded to Bluffton Paving, Inc., Bluffton, Ohio

 
 
 

Market Street Paving

 

Market Street Paving

 

City of Van Wert, Van Wert County

Please click here for bid tab results.

Project awarded to Helms & Sons Excavating, Inc., Findlay, Ohio

 
 
 

Orchard Island Sanitary Replacement

 

Orchard Island Sanitary Replacement

 

Logan County Sewer District, Logan County

Please click here for bid tab results.

Project awarded to Helms & Sons Excavating, Inc., Findlay, Ohio

 
 
 

Walnut Street Waterline

 

Walnut Street Waterline

 

City of Brookville, Montgomery County

Please click here for bid tab results.

Project awarded to Finfrock Construction Co., Inc., Covington, Ohio

 
 
 

Bill Yeck Park Trail Extension

 

Bill Yeck Park Trail Extension

 

Centerville-Washington Park District, Montgomery County

Project awarded to Project was cancelled.

 
 
 

Lewistown Sanitary Sewer

 

Lewistown Sanitary Sewer

 

Logan County Sewer District, Logan County

Project awarded to ... No award. Project will be rebid.

 
 
 

Center Street Improvements

 

Center Street Improvements

 

Town of Monroe, Adams County, Indiana

Please click here for bid tab results.

Project awarded to Wayne Asphalt & Const. Co. Inc., Fort Wayne, Indiana

 
 
 

Sidewalk Improvements - 2021

 

Sidewalk Improvements - 2021

 

Village of Anna, Shelby County

Please click here for bid tab results.

Project awarded to Wannemacher Constr. Inc., Anna, Ohio

 
 
 

2021-01 CCMG Project Improvements

 

2021-01 CCMG Project Improvements

 

Town of Redkey, Jay County

Please click here for bid tab results.

Project awarded to Dirt Works & Asphalt Paving Inc., Parker City, Indiana

 
 
 

Activity Center Park Trail

 

Activity Center Park Trail

 

Centerville-Washington Park District, Montgomery County

Please click here for bid tab results.

Project awarded to Oakley Blacktop, Inc., Dayton, Ohio

 
 
 

Main/Chestnut/Wall/Hill Water Main and Street Improvements

 

Main/Chestnut/Wall/Hill Water Main and Street Improvements

 

City of Loveland, Hamilton County

Please click here for bid tab results.

Project awarded to Ford Development Corp., Cincinnati, Ohio

 
 
 

New Bremen Bike Paths and Resurfacing Rebid

 

New Bremen Bike Paths and Resurfacing Rebid

 

Village of New Bremen, Auglaize County

Please click here for bid tab results.

Project awarded to Buehler Asphalt Paving Inc., St. Marys, Ohio

 
 
 

Street Resurfacing 2021

 

Street Resurfacing 2021

 

Village of Buckland, Auglaize County

Please click here for bid tab results.

Project awarded to Buehler Asphalt Paving Inc., St. Marys, Ohio

 
 
 

Church Street Reconstruction, Phase 3

 

Church Street Reconstruction, Phase 3

 

Village of New Lebanon, Montgomery County

Please click here for bid tab results.

Project awarded to Outdoor Enterprise, LLC, Troy, Ohio

 
 
 

2021 Paving Program Gloria Avenue

 

2021 Paving Program Gloria Avenue

 

Village of New Lebanon, Montgomery County

Please click here for bid tab results.

Project awarded to Outdoor Enterprise, LLC, Troy, Ohio

 
 
 

2021 Asphalt Resurfacing Program

 

2021 Asphalt Resurfacing Program

 

City of Monroe, Butler County

Please click here for bid tab results.

Project awarded to Barrett Paving Materials Inc., Franklin, Ohio

 
 
 

Broadway & Mulberry Water

 

Broadway & Mulberry Water

 

Village of Spencerville, Allen County

Please click here for bid tab results.

Project awarded to PAB Construction Co. of Coldwater, Ohio.

 
 
 

West Bremen Street Paving & Widening

 

West Bremen Street Paving & Widening

 

Village of New Knoxville, Auglaize County

Please click here for bid tab results.

Project awarded to Tom's Construction, Inc., St. Henry, Ohio

 
 
 

2021 Street Resurfacing Project

 

2021 Street Resurfacing Project

 

Village of Cridersville, Auglaize County

Please click here for bid tab results.

Project awarded to Buehler Asphalt Paving Inc., St. Marys, Ohio

 
 
 

2021 ADA Compliance Program

 

2021 ADA Compliance Program

 

City of Monroe, Butler County

Please click here for bid tab results.

Project awarded to R.A. Miller Construction Co. Inc., Hamilton, Ohio

 
 
 

Walnut Street Improvements

 

Walnut Street Improvements

 

Village of Felicity, Clermont County

Please click here for bid tab results.

Project awarded to Fillmore Construction LLC, Leesburg, Ohio

 
 
 

2021 Paving Program

 

2021 Paving Program

 

City of Riverside, Montgomery County

Please click here for bid tab results.

Project awarded to Barrett Paving Materials Inc. of Franklin, Ohio

 
 
 

100,000 Gallon Elevated Tank Interior Painting

 

100,000 Gallon Elevated Tank Interior Painting

 

Village of Felicity, Clermont County

Project awarded to ... No award. Project will be rebid.

 
 
 

New Bremen Bike Paths and Resurfacing

 

New Bremen Bike Paths and Resurfacing

 

Village of New Bremen, Auglaize County

Please click here for bid tab results.

Project awarded to ... No award. Project will be rebid.

 
 
 

Storm Sewer Upgrades

 

Storm Sewer Upgrades

 

Village of Fort Loramie, Shelby County

Please click here for bid tab results.

Project awarded to Tom's Construction, Inc. of St. Henry, Ohio

 
 
 

Water System Improvements

 

Water System Improvements

 

Village of Middleport, Meigs County

Please click here for bid tab results.

Project awarded to Tribute Contracting & Consultants, LLC, South Point, Ohio

 
 
 

State Route 235 Forcemain

 

State Route 235 Forcemain

 

Logan County Sewer District, Logan County

Please click here for bid tab results.

Project awarded to Northeast Ohio Trenching Service Inc., Warrensville Heights, Ohio

 
 
 

Water Street Parking Lot

 

Water Street Parking Lot

 

City of Piqua, Ohio

Please click here for bid tab results.

Project awarded to Outdoor Enterprise, LLC, Troy, Ohio

 
 
 

Progressive Drive Extension

 

Progressive Drive Extension

 

Village of Ottoville, Putnam County

Project awarded to Miller Contracting Group, Inc., Ottoville, Ohio

 
 
 

Butterworth Road Sewer Extension

 

Butterworth Road Sewer Extension

 

City of Loveland, Warren County

Please click here for bid tab results.

Project awarded to Larry Smith, Inc., Cleves, Ohio

 
 
 

Miamiview Drive Extension and Culvert

 

Miamiview Drive Extension and Culvert

 

City of Loveland, Hamilton County

Please click here for bid tab results.

Project awarded to JTM Smith Construction, Inc., Fayetteville, Ohio

 
 
 

Lilly Chapel Reconstruction

 

Lilly Chapel Reconstruction

 

Village of West Jefferson, Madison County

Please click here for bid tab results.

Project awarded to J & J Schlaegel, Inc., Urbana, Ohio

 
 
 

2020-2 Community Crossing Matching Grant Project

 

2020-2 Community Crossing Matching Grant Project

 

City of Portland, Jay County

Please click here for bid tab results.

Project awarded to Brooks Construction Co Inc., Fort Wayne, Indiana

 
 
 

2020-2 Community Crossing Matching Grant Project

 

2020-2 Community Crossing Matching Grant Project

 

City of Dunkirk, Jay County

Please click here for bid tab results.

Project awarded to Brooks Construction Co Inc., Fort Wayne, Indiana

 
 
 

2020-2 Community Crossing Matching Grant Project

 

2020-2 Community Crossing Matching Grant Project

 

Town of Bryant, Jay County

Please click here for bid tab results.

Project awarded to KBL Transport LLC, Portland, Indiana

 
 
 

2020-2 Community Crossing Matching Grant Project

 

2020-2 Community Crossing Matching Grant Project

 

Town of Cambridge City, Wayne County

Please click here for bid tab results.

Project awarded to Midwest Paving, LLC, Noblesville, Indiana

 
 
 

2021 Paving Program

 

2021 Paving Program

 

Village of West Jefferson, Madison County

Please click here for bid tab results.

Project awarded to Cox Paving LLC of Washington Courthouse, Ohio

 
 
 

2020-2 Community Crossing Matching Grant Project

 

2020-2 Community Crossing Matching Grant Project

 

Town of Parker City, Randolph County

Please click here for bid tab results.

Project awarded to Dirt Works & Asphalt Paving Inc., Parker City, Indiana

 
 
 

2020-2 Community Crossing Matching Grant Project

 

2020-2 Community Crossing Matching Grant Project

 

Town of Lynn, Randolph County

Please click here for bid tab results.

Project awarded to Brumbaugh Construction, Inc., Arcanum, Ohio

 
 
 

Sanitary Rehab Phase 17

 

Sanitary Rehab Phase 17

 

Village of New Lebanon, Montgomery County

Please click here for bid tab results.

Project awarded to Miller Pipeline, LLC, Indianapolis, Indiana

 
 
 

2021 Street Maintenance

 

2021 Street Maintenance

 

Village of Russia, Shelby County

Please click here for bid tab results.

Project awarded to Fillmore Construction LLC, Leesburg, Ohio

 
 
 

Ferry Road Water Storage Tank Painting

 

Ferry Road Water Storage Tank Painting

 

Village of Waynesville, Warren County

Please click here for bid tab results.

Project awarded to L&T Painting Inc., Shelby Township, MI

 
 
 

Loveland City Schools 2021 Improvements

 

Loveland City Schools 2021 Improvements

 

Loveland City Schools, Hamilton County

Please click here for bid tab results.

Project awarded to Dura-Seal, Columbus, Ohio

 
 
 

Gay Street Reconstruction Phase 2

 

Gay Street Reconstruction Phase 2

 

Village of Williamsburg, Clermont County

Please click here for bid tab results.

Project awarded to Welsh Excavation Co. Inc., Cleves, Ohio

 
 
 

2020-2 Community Crossing Matching Grant Project

 

2020-2 Community Crossing Matching Grant Project

 

Town of Saratoga, Randolph County

Please click here for bid tab results.

Project awarded to Milestone Contractors, L.P., Richmond, Indiana

 
 
 

Water Tower Repainting

 

Water Tower Repainting

 

Village of Columbus Grove, Putnam County, Ohio

Please click here for bid tab results.

Project awarded to L&T Painting Inc., Shelby Township, MI

 
 
 

Chilo Street Improvements

 

Chilo Street Improvements

 

Village of Chilo, Clermont County

Please click here for bid tab results.

Project awarded to Fillmore Construction LLC of Leesburg, Ohio

 
 
 

Jefferson Street Reconstruction - Phase 2 Rebid

 

Jefferson Street Reconstruction - Phase 2 Rebid

 

Village of Bluffton, Allen County

Please click here for bid tab results.

Project awarded to Underground Utilities, Inc., Monroeville, Ohio

 
 
 

Charity Street Reconstruction

 

Charity Street Reconstruction

 

Village of Bethel, Clermont County, Ohio

Please click here for bid tab results.

Project awarded to JTM Smith Construction, Inc., Fayetteville, Ohio

 
 
 

West Benton Street Reconstruction, Phase 2

 

West Benton Street Reconstruction, Phase 2

 

City of Wapakoneta, Auglaize County

Please click here for bid tab results.

Project awarded to Hohenbrink Excavating LLC, Ottawa, Ohio

 
 
 

Riverside Drive Improvements Phase 3 & 4

 

Riverside Drive Improvements Phase 3 & 4

 

City of Troy, Miami County, Ohio

Please click here for bid tab results.

Project awarded to TC Holzen

 
 
 

Cherry Street Water and Storm Improvements

 

Cherry Street Water and Storm Improvements

 

Village of Blanchester, Clinton County, Ohio

Please click here for bid tab results.

Project awarded to Panetta Excavating Inc., Blanchester, Ohio

 
 
 

Broadway Street Stabilization

 

Broadway Street Stabilization

 

City of Loveland, Clermont County

Please click here for bid tab results.

Project awarded to JTM Smith Construction, Inc., Fayetteville, Ohio

 
 
 

South Elm Street Reconstruction

 

South Elm Street Reconstruction

 

Village of Port Jefferson, Shelby County

Please click here for bid tab results.

Project awarded to Sturm Construction Inc., Sidney, Ohio

 
 
 

Liberty Center Sanitary Sewer

 

Liberty Center Sanitary Sewer

 

Wells County Regional Sewer District, Wells County, Indiana

Please click here for bid tab results.

Project awarded to VTF Excavation, LLC, Celina, Ohio

 
 
 

Murray Sanitary Sewer

 

Murray Sanitary Sewer

 

Wells County Regional Sewer District, Wells County, Indiana

Please click here for bid tab results.

Project awarded to VTF Excavation, LLC, Celina, Ohio

 
 
 

Max Street Storm Sewer

 

Max Street Storm Sewer

 

Village of Ottoville, Putnam County

Please click here for bid tab results.

Project awarded to Hohenbrink Excavating LLC, Findlay, Ohio

 
 
 

Northeast Storm Improvements

 

Northeast Storm Improvements

 

Village of Anna, Shelby County, Ohio

Please click here for bid tab results.

Project awarded to Donald A. Sommer Inc., Anna, Ohio

 
 
 

2020 Resor Road and Winton Road Water Main Replacement

 

2020 Resor Road and Winton Road Water Main Replacement

 

City of Fairfield, Butler County, Ohio

Please click here for bid tab results.

Project awarded to JW Brennan Excavating LLC, Ross, Ohio

 
 
 

Jefferson Street Reconstruction - Phase 2 Rebid

 

Jefferson Street Reconstruction - Phase 2 Rebid

 

Village of Bluffton, Allen County

Please click here for bid tab results.

Project awarded to Project will be rebid.

 
 
 

Union Cemetery Road Sidewalk

 

Union Cemetery Road Sidewalk

 

Symmes Township, Hamilton County

Please click here for bid tab results.

Project awarded to JTM Smith Construction, Inc., Fayetteville, Ohio

 
 
 

Bremen Street Storm

 

Bremen Street Storm

 

Village of New Knoxville, Auglaize County, Ohio

Please click here for bid tab results.

Project awarded to Tom's Construction, Inc., St. Henry, Ohio

 
 
 

SR 571 Bridge Sewer Rehab

 

SR 571 Bridge Sewer Rehab

 

Municipality of West Milton, Miami County

Please click here for bid tab results.

Project awarded to Insight Pipe Contracting, LLC, Harmony, PA

 
 
 

Water Booster Station

 

Water Booster Station

 

Municipality of West Milton, Miami County, Ohio

Please click here for bid tab results.

Project awarded to Outdoor Enterprise, LLC, Troy, Ohio

 
 
 

Kugler Mill Road Improvements

 

Kugler Mill Road Improvements

 

Sycamore Township, Hamilton County

Please click here for bid tab results.

Project awarded to Rack & Ballauer Excavating Co. Inc. of Hamilton, Ohio

 
 
 

SR 571 Bridge Water Main Insulation

 

SR 571 Bridge Water Main Insulation

 

Municipality of West Milton, Miami County

Please click here for bid tab results.

Project awarded to Eagle Bridge Co., Sidney, Ohio

 
 
 

Mt. Zion and Buckwheat Road Sidewalk

 

Mt. Zion and Buckwheat Road Sidewalk

 

Miami Township, Clermont County

Please click here for bid tab results.

Project awarded to Adleta, Inc. of Cincinnati, Ohio

 
 
 

Commerce Drive Extension

 

Commerce Drive Extension

 

Village of Botkins, Shelby County

Please click here for bid tab results.

Project awarded to Donald A. Sommer Inc., Anna, Ohio

 
 
 

Fifth Street Waterline

 

Fifth Street Waterline

 

City of Delphos, Allen County

Please click here for bid tab results.

Project awarded to Hohenbrink Excavating LLC, Findlay, Ohio

 
 
 

Street Repaving

 

Street Repaving

 

Village of Mechanicsburg, Champaign County

Please click here for bid tab results.

Project awarded to Fillmore Construction LLC of Leesburg, Ohio

 
 
 

Greenback Road Reconstruction

 

Greenback Road Reconstruction

 

Village of Fort Loramie, Shelby County

Please click here for bid tab results.

Project awarded to Tom's Construction, Inc. of St. Henry, Ohio

 
 
 

Elm Street Reconstruction

 

Elm Street Reconstruction

 

Village of Fort Recovery, Mercer County

Please click here for bid tab results.

Project awarded to PAB Construction Co., Coldwater, Ohio

 
 
 

Edwards, High, and Miami Improvements

 

Edwards, High, and Miami Improvements

 

Village of Waynesville, Warren County

Please click here for bid tab results.

Project awarded to SmithCorp Inc., Cincinnati, Ohio

 
 
 

Forest St. and Walnut St. Widening

 

Forest St. and Walnut St. Widening

 

Village of Neville, Clermont County

Please click here for bid tab results.

Project awarded to Fillmore Construction LLC, Leesburg, Ohio

 
 
 

Broadway Street Improvements

 

Broadway Street Improvements

 

Mercer County Commissioners, Mercer County

Please click here for bid tab results.

Project awarded to PAB Construction Co., Coldwater, Ohio

 
 
 

Northwoods Boulevard & Falls Creek Drive Intersection Improvements

 

Northwoods Boulevard & Falls Creek Drive Intersection Improvements

 

City of Vandalia, Montgomery County

Please click here for bid tab results.

Project awarded to Outdoor Enterprise, LLC, Troy, Ohio

 
 
 

Patterson Street and Wells Road Storm Improvements

 

Patterson Street and Wells Road Storm Improvements

 

Hardin County Commissioners, Hardin County

Please click here for bid tab results.

Project awarded to Rising Son Company, Inc., Mansfield, Ohio

 
 
 

Ludlow Falls Sanitary Sewer

 

Ludlow Falls Sanitary Sewer

 

Municipality of West Milton, Miami County, Ohio

Please click here for bid tab results.

Project awarded to VTF Excavation, LLC, Celina, Ohio

 
 
 

Parks Trails Paving

 

Parks Trails Paving

 

Centerville-Washington Park District, Montgomery County

Please click here for bid tab results.

Project awarded to Oakley Blacktop, Inc. of Dayton, Ohio

 
 
 

Traffic Signal and Lighting Maintenance Contract

 

Traffic Signal and Lighting Maintenance Contract

 

City of Riverside, Montgomery County

Please click here for bid tab results.

Project awarded to Security Fence Group, Inc., Dayton, Ohio

 
 
 

Phillips Park Public Sewer Connection

 

Phillips Park Public Sewer Connection

 

City of Loveland, Hamilton County

Please click here for bid tab results.

Project awarded to JW Brennan Excavating LLC, Ross, Ohio

 
 
 

Street Maintenance Rebid

 

Street Maintenance Rebid

 

City of Van Wert, Van Wert County

Please click here for bid tab results.

Project awarded to The Shelly Company of Findlay, Ohio

 
 
 

2020 ADA Compliance Program REBID

 

2020 ADA Compliance Program REBID

 

City of Monroe, Butler County

Please click here for bid tab results.

Project awarded to W.G. Stang LLC, Hamilton, Ohio

 
 
 

SR 571 Bridge Water Main Lining

 

SR 571 Bridge Water Main Lining

 

Municipality of West Milton, Miami County

Please click here for bid tab results.

Project awarded to Enviro-Flow Pipe and Conduit Services, Zanesville, Ohio

 
 
 

Street Maintenance

 

Street Maintenance

 

City of Van Wert, Van Wert County

Please click here for bid tab results.

Project awarded to Project will be rebid.

 
 
 

2020 Asphalt Resurfacing Program

 

2020 Asphalt Resurfacing Program

 

City of Monroe, Butler County

Please click here for bid tab results.

Project awarded to John R. Jurgensen Co., Cincinnati, Ohio

 
 
 

S.R. 274 Turn Lane Improvements

 

S.R. 274 Turn Lane Improvements

 

Village of New Bremen, Auglaize County

Please click here for bid tab results.

Project awarded to Tom's Construction, Inc., St. Henry, Ohio

 
 
 

Jefferson Street Reconstruction - Phase 2 - BID CANCELLED

 

Jefferson Street Reconstruction - Phase 2 - BID CANCELLED

 

Village of Bluffton, Allen County

Project awarded to Bid cancelled.

 
 
 

Spring Hill Road Reconstruction

 

Spring Hill Road Reconstruction

 

Village of Clarksville, Clinton County

Please click here for bid tab results.

Project awarded to Fillmore Construction LLC, Leesburg, Ohio

 
 
 

Water Main Trunk Line Replacement

 

Water Main Trunk Line Replacement

 

City of Kenton, Hardin County

Please click here for bid tab results.

Project awarded to Driven Excavating, LLC, Shelby, Ohio

 
 
 

Meranda Road 2020 Repaving Project

 

Meranda Road 2020 Repaving Project

 

Franklin Township Trustees, Shelby County

Please click here for bid tab results.

Project awarded to Ray C. Hensley, Inc. of Springfield, Ohio

 
 
 

Russia Versailles Road Utility Extension

 

Russia Versailles Road Utility Extension

 

Village of Russia, Shelby County

Please click here for bid tab results.

Project awarded to Kinnison Excavating Inc. of Piqua, Ohio

 
 
 

Eintracht Park Sewer Extension

 

Eintracht Park Sewer Extension

 

City of Riverside, Montgomery County

Please click here for bid tab results.

Project awarded to Stevenson Utilities Construction LLC, Springfield, Ohio

 
 
 

2020 ADA Compliance Program

 

2020 ADA Compliance Program

 

City of Monroe, Butler County

Project awarded to ... All bids were rejected due to City error. Project will be rebid.

 
 
 

Jenny Lind Road Improvements Re-bid

 

Jenny Lind Road Improvements Re-bid

 

Pierce Township, Clermont County

Please click here for bid tab results.

Project awarded to JK Meurer Corporation of Loveland, Ohio

 
 
 

Wagner Avenue Widening

 

Wagner Avenue Widening

 

City of Greenville, Darke County, Ohio

Please click here for bid tab results.

Project awarded to Brumbaugh Construction, Inc., Arcanum, Ohio

 
 
 

2020 Paving Program

 

2020 Paving Program

 

City of Riverside, Montgomery County

Please click here for bid tab results.

Project awarded to Barrett Paving Materials Inc. of Franklin, Ohio

 
 
 

2020 Maintenance Contract

 

2020 Maintenance Contract

 

City of Riverside, Montgomery County

Please click here for bid tab results.

Project awarded to Lake Erie Construction Company, Norwalk, Ohio

 
 
 

2020 Street Maintenance

 

2020 Street Maintenance

 

Village of Russia, Shelby County

Please click here for bid tab results.

Project awarded to Wagner Paving Inc. of Laura, Ohio

 
 
 

Community Center Improvements

 

Community Center Improvements

 

Shelby County Commissioners, Shelby County

Project awarded to ... No award. Project has been cancelled.

 
 
 

Airstream Traffic Signal

 

Airstream Traffic Signal

 

Village of Jackson Center, Shelby County

Please click here for bid tab results.

Project awarded to Perram Electric, Inc., Wadsworth, Ohio

 
 
 

Paving Program 2020

 

Paving Program 2020

 

Village of West Jefferson, Madison County

Please click here for bid tab results.

Project awarded to Cox Paving LLC, Washington Courthouse, Ohio

 
 
 

2019 CCMG Street Resurfacing Project

 

2019 CCMG Street Resurfacing Project

 

Town of Farmland, Randolph County

Please click here for bid tab results.

Project awarded to DC Construction Services, Inc., Indianapolis, IN

 
 
 

2019 CCMG Street Resurfacing Project

 

2019 CCMG Street Resurfacing Project

 

Town of Ridgeville, Randolph County

Please click here for bid tab results.

Project awarded to DC Construction Services, Inc., Indianapolis, IN

 
 
 

Water Meter Replacement

 

Water Meter Replacement

 

Village of Bluffton, Allen County

Please click here for bid tab results.

Project awarded to Everett J. Prescott, Inc., Lima, Ohio

 
 
 

West Benton Street Reconstruction, Phase 1

 

West Benton Street Reconstruction, Phase 1

 

Auglaize County Board of Commissioners, Auglaize County

Please click here for bid tab results.

Project awarded to Hohenbrink Excavating LLC, Findlay, Ohio

 
 
 

2019 CCMG Street Resurfacing Project

 

2019 CCMG Street Resurfacing Project

 

Town of Saratoga, Randolph County, Indiana

Please click here for bid tab results.

Project awarded to Milestone Contractors, L.P., Richmond, Indiana

 
 
 

Center Street Improvements

 

Center Street Improvements

 

Town of Cambridge City, Wayne County, Indiana

Please click here for bid tab results.

Project awarded to Milestone Contractors, L.P., Richmond, Indiana

 
 
 

Community Crossing Matching Grant

 

Community Crossing Matching Grant

 

Town of Lynn, Randolph County, Indiana

Please click here for bid tab results.

Project awarded to Milestone Contractors, L.P., Richmond, Indiana

 
 
 

North East Street Storm Improvements

 

North East Street Storm Improvements

 

Village of Bethel, Clermont County

Please click here for bid tab results.

Project awarded to JNT Excavating LLC, Independence, KY

 
 
 

Brooks Avenue Elevated Water Tank Improvements Rebid

 

Brooks Avenue Elevated Water Tank Improvements Rebid

 

City of Van Wert, Van Wert County

Please click here for bid tab results.

Project awarded to Clearcreek Coatings, LTD of New Carlisle, Ohio

 
 
 

Cooper Farms Utility Extension

 

Cooper Farms Utility Extension

 

Mercer County Commissioners

Please click here for bid tab results.

Project awarded to Shinn Bros. Inc., Celina, Ohio

 
 
 

Municipal Pool Renovations

 

Municipal Pool Renovations

 

Village of Jackson Center, Shelby County

Please click here for bid tab results.

Project awarded to Westerheide Construction Company of Sidney, Ohio

 
 
 

Parkdale Drive Sanitary Sewer Replacement

 

Parkdale Drive Sanitary Sewer Replacement

 

Village of West Jefferson, Madison County

Please click here for bid tab results.

Project awarded to B K Layer LLC, Perrysville, OH

 
 
 

Lift Station Replacement REBID

 

Lift Station Replacement REBID

 

Village of Pandora, Putnam County

Please click here for bid tab results.

Project awarded to Peterson Construction Company, Wapakoneta, Ohio

 
 
 

Alley Storm Sewer Project

 

Alley Storm Sewer Project

 

Village of Ottoville, Putnam County

Please click here for bid tab results.

Project awarded to Miller Contracting Group, Inc., Ottoville, Ohio

 
 
 

Traffic Signal Upgrades REBID

 

Traffic Signal Upgrades REBID

 

Village of New Bremen, Auglaize County

Please click here for bid tab results.

Project awarded to Tom's Construction, Inc., St. Henry, Ohio

 
 
 

Sidewalk Project 2019

 

Sidewalk Project 2019

 

Symmes Township, Hamilton County

Please click here for bid tab results.

Project awarded to Fillmore Construction LLC, Leesburg, Ohio

 
 
 

Basketball and Pickleball Courts

 

Basketball and Pickleball Courts

 

Village of Minster, Auglaize County

Please click here for bid tab results.

Project awarded to Shinn Bros. Inc., Celina, Ohio

 
 
 

Third Street Sanitary Sewer Extension REBID

 

Third Street Sanitary Sewer Extension REBID

 

City of Delphos, Allen County

Please click here for bid tab results.

Project awarded to Hohenbrink Excavating LLC, Findlay, Ohio

 
 
 

Traffic Signal Upgrades

 

Traffic Signal Upgrades

 

Village of New Bremen, Auglaize County

Please click here for bid tab results.

Project awarded to ... No award. Project will be rebid.

 
 
 

Sewer Separation Phase 3 - North End

 

Sewer Separation Phase 3 - North End

 

Village of Middleport, Meigs County

Please click here for bid tab results.

Project awarded to Fields Excavating Inc., Kitts Hill, Ohio

 
 
 

Street Maintenance Rebid

 

Street Maintenance Rebid

 

City of Van Wert, Van Wert County

Please click here for bid tab results.

Project awarded to The Shelly Company of Findlay, Ohio

 
 
 

Third Street Sanitary Sewer Extension

 

Third Street Sanitary Sewer Extension

 

City of Delphos, Allen County

Project awarded to no one at this time. Project will be rebid.

 
 
 

Grant Park Bank Restoration Rebid

 

Grant Park Bank Restoration Rebid

 

Centerville-Washington Park District, Montgomery County

Please click here for bid tab results.

Project awarded to Evans Landscaping of Cincinnati, Ohio

 
 
 

Lift Station Replacement

 

Lift Station Replacement

 

Village of Pandora, Putnam County

Project awarded to Project will be rebid.

 
 
 

South Street Reconstruction - Phase 1

 

South Street Reconstruction - Phase 1

 

Village of Anna, Shelby County

Please click here for bid tab results.

Project awarded to Sturm Construction Inc., Sidney, Ohio

 
 
 

Blower Replacement

 

Blower Replacement

 

City of Van Wert, Van Wert County

Please click here for bid tab results.

Project awarded to Titan Mechanical Inc., Haskins, Ohio

 
 
 

Brooks Avenue Elevated Water Tank Improvements

 

Brooks Avenue Elevated Water Tank Improvements

 

City of Van Wert, Van Wert County

Please click here for bid tab results.

Project awarded to Project will be rebid.

 
 
 

Street Maintenance

 

Street Maintenance

 

City of Van Wert, Van Wert County

Please click here for bid tab results.

Project awarded to Project will be rebid.

 
 
 

Lock 9 Park Utility Project

 

Lock 9 Park Utility Project

 

City of Piqua, Miami County

Please click here for bid tab results.

Project awarded to Brumbaugh Construction, Inc., Arcanum, Ohio

 
 
 

Jenny Lind Improvements

 

Jenny Lind Improvements

 

Amelia Village, Clermont County

Please click here for bid tab results.

Project awarded to Project will be rebid.

 
 
 

Grant Park Bank Restoration

 

Grant Park Bank Restoration

 

Centerville-Washington Park District, Montgomery County

Please click here for bid tab results.

Project awarded to ... No award. Project will be rebid.

 
 
 

Blong Road Bridge Replacement Project 2019

 

Blong Road Bridge Replacement Project 2019

 

Symmes Township, Hamilton County

Please click here for bid tab results.

Project awarded to Smith Construction, Fayetteville, Ohio

 
 
 

2019 Sidewalk Improvements Project

 

2019 Sidewalk Improvements Project

 

Village of Anna, Shelby County

Please click here for bid tab results.

Project awarded to PAB Construction Co., Coldwater, Ohio

 
 
 

Ricker Street Improvements

 

Ricker Street Improvements

 

City of Delphos, Allen County

Please click here for bid tab results.

Project awarded to PAB Construction Co., Coldwater, Ohio

 
 
 

Fancy Street Water Main and Resurfacing Project

 

Fancy Street Water Main and Resurfacing Project

 

Village of Blanchester, Clinton County

Please click here for bid tab results.

Project awarded to Queen City Mechanicals, Inc. of Cincinnati, Ohio

 
 
 

Tall Oaks Curb Ramp Replacement Phase 2

 

Tall Oaks Curb Ramp Replacement Phase 2

 

City of Riverside, Montgomery County

Please click here for bid tab results.

Project awarded to L.J. Deweese Co. Inc., Tipp City, Ohio

 
 
 

Cedar Drive Water Main Replacement

 

Cedar Drive Water Main Replacement

 

City of Loveland, Clermont County

Please click here for bid tab results.

Project awarded to JW Brennan Excavating LLC, Ross, Ohio

 
 
 

S.R. 48 and Loveland-Miamiville Improvements

 

S.R. 48 and Loveland-Miamiville Improvements

 

City of Loveland, Clermont County

Please click here for bid tab results.

Project awarded to JNT Excavating LLC, Independence, KY

 
 
 

2019 Resurfacing Project

 

2019 Resurfacing Project

 

Village of Fort Recovery, Mercer County

Please click here for bid tab results.

Project awarded to Wagner Paving, Inc.

 
 
 

Lost Creek Building Site Plan

 

Lost Creek Building Site Plan

 

Miami County Park District, Miami County

Please click here for bid tab results.

Project awarded to Tom's Construction, Inc., St. Henry, Ohio

 
 
 

Perry Street Reconstruction

 

Perry Street Reconstruction

 

City of Wapakoneta, Auglaize County

Please click here for bid tab results.

Project awarded to Hohenbrink Excavating LLC, Findlay, Ohio

 
 
 

Gay Street Reconstruction Phase 1

 

Gay Street Reconstruction Phase 1

 

VILLAGE OF WILLIAMSBURG, CLERMONT COUNTY

Please click here for bid tab results.

Project awarded to Fillmore Construction LLC, Leesburg, Ohio

 
 
 

2019 Repaving Project

 

2019 Repaving Project

 

Franklin Township Trustees, Shelby County

Please click here for bid tab results.

Project awarded to Ray Hensley Inc., Springfield, Ohio

 
 
 

Main Street Water Main Replacement

 

Main Street Water Main Replacement

 

Village of Williamsburg, Clermont County

Please click here for bid tab results.

Project awarded to JW Brennan Excavating LLC, Fairfield, Ohio

 
 
 

Storm Water Improvements Projects

 

Storm Water Improvements Projects

 

Town of Centerville, Wayne County

Please click here for bid tab results.

Project awarded to Milestone Contractors, L.P., Richmond, Indiana

 
 
 

Buckeye Drive Extension

 

Buckeye Drive Extension

 

VILLAGE OF NEW KNOXVILLE, AUGLAIZE COUNTY

Please click here for bid tab results.

Project awarded to Donald A. Sommer Inc., Anna, Ohio

 
 
 

Main Street Water Main Replacement

 

Main Street Water Main Replacement

 

VILLAGE OF WILLIAMSBURG, CLERMONT COUNTY

Please click here for bid tab results.

Project awarded to JW Brennan Excavating LLC from Fairfield, OH.

 
 
 

Ground Storage Water Tank Painting

 

Ground Storage Water Tank Painting

 

VILLAGE OF LEIPSIC, PUTNAM COUNTY

Please click here for bid tab results.

Project awarded to L&T Painting Inc., Shelby Township, MI

 
 
 

Northeast Sanitary Sewer Improvements

 

Northeast Sanitary Sewer Improvements

 

VILLAGE OF MINSTER, AUGLAIZE COUNTY

Please click here for bid tab results.

Project awarded to Helms & Sons Excavating, Inc., Findlay, Ohio

 
 
 

2019 Street Repaving

 

2019 Street Repaving

 

VILLAGE OF RUSSIA, SHELBY COUNTY

Please click here for bid tab results.

Project awarded to Barrett Paving Materials, Franklin, Ohio

 
 
 

Jefferson Street Water Main Replacement

 

Jefferson Street Water Main Replacement

 

VILLAGE OF BLUFFTON, ALLEN COUNTY

Please click here for bid tab results.

Project awarded to Beaverdam Contracting, Inc., Bluffton, Ohio.

 
 
 

Jefferson Street Reconstruction

 

Jefferson Street Reconstruction

 

VILLAGE OF BLUFFTON, ALLEN COUNTY

Please click here for bid tab results.

Project awarded to Beaverdam Contracting, Inc., Bluffton, Ohio.

 
 
 

SR 703 and Lake Campus/Tri-Star Drive Traffic Signal

 

SR 703 and Lake Campus/Tri-Star Drive Traffic Signal

 

MERCER COUNTY COMMISSIONERS, MERCER COUNTY

Please click here for bid tab results.

Project awarded to Perram Electric, Inc. of Wadsworth, Ohio

 
 
 

Kroger #700 – Public Water and Sewer Improvements

 

Kroger #700 – Public Water and Sewer Improvements

 

VILLAGE OF WEST JEFFERSON, MADISON COUNTY

Please click here for bid tab results.

Project awarded to J & J Schlaegel, Inc. of Urbana, Ohio

 
 
 

2018 CCMG Street Resurfacing Project

 

2018 CCMG Street Resurfacing Project

 

TOWN OF CENTERVILLE, WAYNE COUNTY

Please click here for bid tab results.

Project awarded to All Star Paving of Seymour, Indiana

 
 
 

Willeke Ave. Reconstruction Phase 2

 

Willeke Ave. Reconstruction Phase 2

 

VILLAGE OF ADA, HARDIN COUNTY

Please click here for bid tab results.

Project awarded to Hohenbrink Excavating LLC of Findlay, Ohio

 
 
 

2018 CCMG Street Resurfacing Project

 

2018 CCMG Street Resurfacing Project

 

TOWN OF RIDGEVILLE, RANDOLPH COUNTY

Please click here for bid tab results.

Project awarded to Brooks Construction Co. Inc.

 
 
 

2018 CCMG Street Resurfacing Project

 

2018 CCMG Street Resurfacing Project

 

TOWN OF FARMLAND, RANDOLPH COUNTY

Please click here for bid tab results.

Project awarded to Milestone Contractors, L.P. of Richmond, Indiana

 
 
 

Ream Street Water Main Replacement

 

Ream Street Water Main Replacement

 

HARDIN COUNTY COMMISSIONERS, HARDIN COUNTY

Please click here for bid tab results.

Project awarded to Beaverdam Contracting Inc., Bluffton, Ohio

 
 
 

Ream Street Storm Sewer Improvements – Phase II

 

Ream Street Storm Sewer Improvements – Phase II

 

HARDIN COUNTY COMMISSIONERS, HARDIN COUNTY

Please click here for bid tab results.

Project awarded to Cash Services LLC, Northwood, Ohio

 
 
 

Foote Street Improvements

 

Foote Street Improvements

 

TOWN OF CAMBRIDGE CITY, WAYNE COUNTY

Please click here for bid tab results.

Project awarded to Milestone Contractors, L.P., Richmond, Indiana

 
 
 

2019 Paving Program

 

2019 Paving Program

 

VILLAGE OF WEST JEFFERSON, MADISON COUNTY

Please click here for bid tab results.

Project awarded to Cox Paving LLC of Washington Courthouse, Ohio

 
 
 

2018 CCMG Roadway Improvements

 

2018 CCMG Roadway Improvements

 

TOWN OF LYNN, RANDOLPH COUNTY

Please click here for bid tab results.

Project awarded to Milestone Contractors, Richmond, Indiana

 
 