Future Bidding Possibilities
Interested in future projects?
Quarter 3, 2026
Curtis Drive Reconstruction
City of Wilmington, Clinton County, Ohio
Approximate Construction Estimate: $1,300,000
Projected Bidding Timeframe: Quarter 3, 2026 by City of Wilmington
Project Funding: OPWC
MIA-571 Crosswalks X 2, PID 124454
Village of West Milton, Miami County, Ohio
Approximate Construction Estimate: $538,000
Projected Bidding Timeframe: Quarter 3, 2026 by ODOT
Project Funding: ODOT Let
Quarter 4, 2026
BUT-US 127-0.61 Pleasant Avenue Shared-Used Path (120879)
City of Fairfield, Butler County, Ohio
Approximate Construction Estimate: $5,400,000
Projected Bidding Timeframe: Quarter 4, 2026 by City of Fairfield
Project Funding: OKI - ODOT
Brookside Park Drive Culvert
City of Sidney, Shelby County, Ohio
Approximate Construction Estimate: $240,000
Projected Bidding Timeframe: Quarter 4, 2026 by City of Sidney
Project Funding: Local
CCMG Project Aurora FY2027 (Main Street & Judiciary Street)
City of Aurora, Dearborn County, Indiana
Approximate Construction Estimate: $1,145,000
Projected Bidding Timeframe: Quarter 4, 2026 by Choice One
Project Funding: CCMG
CDBG Water System and Road Improvement Project
Village of New Miami, Butler County, Ohio
Approximate Construction Estimate: $220,000
Projected Bidding Timeframe: Quarter 4, 2026 by Butler County
Project Funding: CDBG
Cable Road Forcemain Replacement Project
City of Lima, Allen County, Ohio
Approximate Construction Estimate: Unknown at this time
Projected Bidding Timeframe: Quarter 4, 2026 by Choice One
Project Funding: Local
Caton and Far Hills Water Main Replacement
City of Oakwood, Montgomery County, Ohio
Approximate Construction Estimate: $350,000
Projected Bidding Timeframe: Quarter 4, 2026 by City of Oakwood
Project Funding: Local
Crystal Drive Lift Station Abandonment
City of Fairfield, Butler County, Ohio
Approximate Construction Estimate: $100,000
Projected Bidding Timeframe: Quarter 4, 2026 by City of Fairfield
Project Funding: Local
Gleason to Kuther Sanitary Sewer Evaluation and Replacement
City of Sidney, Shelby County, Ohio
Approximate Construction Estimate: $1,400,000
Projected Bidding Timeframe: Quarter 4, 2026 by City of Sidney
Project Funding: Local
HAM-CR299-6.81 (Loveland Madeira Road) PID 120732
City of Loveland, Hamilton County, Ohio
Approximate Construction Estimate: $5,000,000
Projected Bidding Timeframe: Quarter 4, 2026 by ODOT Let
Project Funding: ODOT STBG/CMAQ
Hay Avenue Reconstruction – Phase 3
City of Brookville, Montgomery County, Ohio
Approximate Construction Estimate: $980,000
Projected Bidding Timeframe: Quarter 4, 2026 by Choice One
Project Funding: OPWC
Jackson, Harmon, Moening and Grant Street Water and Lead Service Replacement
City of Delphos, Allen County, Ohio
Approximate Construction Estimate: $2,335,000
Projected Bidding Timeframe: Quarter 4, 2026 by Choice One
Project Funding: OEPA DEFA
Millcreek Road and Fair Road Reconstruction
City of Sidney, Shelby County, Ohio
Approximate Construction Estimate: $7,400,000
Projected Bidding Timeframe: Quarter 4, 2026 by City of Sidney
Project Funding: Local
Montgomery County Facilities Sidewalk and Curb Repairs
Montgomery County Facilities, Ohio
Approximate Construction Estimate: $150,000
Projected Bidding Timeframe: Quarter 4, 2026 by Choice One
Project Funding: Local
Montgomery Road Sidewalk Phase 1 Design
Symmes Township, Hamilton County, Ohio
Approximate Construction Estimate: $1,100,000
Projected Bidding Timeframe: Quarter 4, 2026 by Symmes Township
Project Funding: SORTA
Park Splash Pad
Village of Arcanum, Darke County, Ohio
Approximate Construction Estimate: $250,000
Projected Bidding Timeframe: Quarter 4, 2026 by Choice One
Project Funding: Local
Rosedale Drive and Lawndale Drive Sanitary Sewer Replacement
Northwestern Water and Sewer District (NWWSD)
Approximate Construction Estimate: $300,000
Projected Bidding Timeframe: Quarter 4, 2026 by Choice One
Project Funding: Local
SR 276 Water Main Replacement
Clermont County Water Resources Department, Ohio
Approximate Construction Estimate: $1,800,000
Projected Bidding Timeframe: Quarter 4, 2026 by Clermont County
Project Funding: Local
Taylorsville 24-Inch Water Transmission Main
City of Huber Heights, Montgomery County, Ohio
Approximate Construction Estimate: $,2500,000
Projected Bidding Timeframe: Quarter 4, 2026 by City of Huber Heights
Project Funding: OPWC
Taylorsville MetroPark Culverts Replacement
Five Rivers MetroParks, Ohio
Approximate Construction Estimate: $621,000
Projected Bidding Timeframe: Quarter 4, 2026 by Five Rivers MetroParks
Project Funding: Local
Upper Bellbrook Road Sidewalk
Sugarcreek Township, Greene County, Ohio
Approximate Construction Estimate: Unknown at this time
Projected Bidding Timeframe: Quarter 4, 2026 by Choice One
Project Funding: Local
Quarter 1, 2027
2024 Miami County Bridge Package (Swailes Road Bridge 01.94)
Miami County Engineer, Ohio
Approximate Construction Estimate: $1,118,000
Projected Bidding Timeframe: Quarter 1, 2027 by Miami County Engineers Office
Project Funding: Local
2025 Miami County Bridge Package (Bridges #3 & #4)
Miami County Engineer, Ohio
Approximate Construction Estimate: $530,000 for #3 and $675,000 for #4
Projected Bidding Timeframe: Quarter 1, 2027 by Miami County Engineer
Project Funding: Local
ALL-Cable Road Improvements, PID: 112573
City of Lima, Allen County, Ohio
Approximate Construction Estimate: $4,955,000
Projected Bidding Timeframe: Quarter 1, 2027 by ODOT
Project Funding: ODOT Safety
AUG Spring St. Reconstruction (PID: 120199)
City of St. Marys, Auglaize County, Ohio
Approximate Construction Estimate: $3,600,000
Projected Bidding Timeframe: Quarter 1, 2027 by ODOT
Project Funding: Safety & TAP
Aullwood Garden MetroPark Pedestrian Bridge Replacement
Five Rivers MetroParks
Approximate Construction Estimate: $350,000
Projected Bidding Timeframe: Quarter 1, 2027 by Five Rivers MetroParks
Project Funding: Local
Britton Lane Sanitary Sewer Main Replacement and Rehabilitation
Butler County Water and Sewer, Ohio
Approximate Construction Estimate: $600,000
Projected Bidding Timeframe: Quarter 1, 2027 by Butler County
Project Funding: Local
CLA-CR333-11.35 Sidewalks (PID: 118643)
City of Springfield, Clark County, Ohio
Approximate Construction Estimate: $1,975,000
Projected Bidding Timeframe: Quarter 1, 2027 by City of Springfield
Project Funding: CMAQ
Carriage Hill MetroPark Historic Farm Bridge Replacement
Five Rivers MetroParks, Ohio
Approximate Construction Estimate: $461,000
Projected Bidding Timeframe: Quarter 1, 2027 by Five Rivers MetroParks
Project Funding: Local
Coltsbridge Trail Extension
Orange Township, Delaware County, Ohio
Approximate Construction Estimate: Unknown at this time
Projected Bidding Timeframe: Quarter 1, 2027 by Choice One
Project Funding: Local
Converse Park Improvements
Village of West Jefferson, Madison County
Approximate Construction Estimate: Unknown at this time
Projected Bidding Timeframe: Quarter 1, 2027 by Choice One
Project Funding: Local
E. Orange Road Path Improvements
Orange Township, Delaware County
Approximate Construction Estimate: Unknown at this time
Projected Bidding Timeframe: Quarter 1, 2027 by Choice One
Project Funding: Local
Echo Hills Golf Course Hole 16 Bridge Project
City of Piqua, Miami County, Ohio
Approximate Construction Estimate: Unknown at this time
Projected Bidding Timeframe: Quarter 1, 2027 by Choice One
Project Funding: Local
Foundry Avenue Sidewalk
Village of Batavia, Clermont County, Ohio
Approximate Construction Estimate: $100,000
Projected Bidding Timeframe: Quarter 1, 2027 by Choice One
Project Funding: CDBG
Glen Oak Trail Extension
Orange Township, Delaware County, Ohio
Approximate Construction Estimate: Unknown at this time
Projected Bidding Timeframe: Quarter 1, 2027 by Choice One
Project Funding: Local
Interstate 75 Waterline Crossing Project
Warren County Water and Sewer Department
Approximate Construction Estimate: $5,000,000
Projected Bidding Timeframe: Quarter 1, 2027 by Warren County
Project Funding: Local
Kiser and Miles Water Main Replacement
City of Tipp City, Miami County, Ohio
Approximate Construction Estimate: $745,000
Projected Bidding Timeframe: Quarter 1, 2027 by Choice One
Project Funding: CDBG
Leeson Avenue Phase 2 Reconstruction
City of Van Wert, Van Wert, Ohio
Approximate Construction Estimate: $4,403,617
Projected Bidding Timeframe: Quarter 1, 2027 by ODOT
Project Funding: Small Cities
N Main Street Reconstruction
Village of Bluffton, Allen County, Ohio
Approximate Construction Estimate: $1,740,000
Projected Bidding Timeframe: Quarter 1, 2027 by Choice One
Project Funding: Local/OPWC
Old Canal Rd. Bridge Guardrail Replacement
City of Vandalia, Montgomery County, Ohio
Approximate Construction Estimate: Unknown at this time
Projected Bidding Timeframe: Quarter 1, 2027 by City of Vandalia
Project Funding: Local
Pleasant Avenue Water Main Replacement
City of Fairfield, Butler County, Ohio
Approximate Construction Estimate: $1,000,000
Projected Bidding Timeframe: Quarter 1, 2027 by City of Fairfield
Project Funding: Local
Sixth and Jefferson Street Extension
Village of Minster, Auglaize County, Ohio
Approximate Construction Estimate: $2,100,000
Projected Bidding Timeframe: Quarter 1, 2027 by Choice One
Project Funding: Local
South Patterson Street Phase 2 Reconstruction
Village of Carey, Wyandot County, Ohio
Approximate Construction Estimate: $1,720,000
Projected Bidding Timeframe: Quarter 1, 2027 by Choice One
Project Funding: Local
Tall Timber and Laurelwood Water Main Replacement
Montgomery County Environmental Services
Approximate Construction Estimate: $600,000
Projected Bidding Timeframe: Quarter 1, 2027 by MCES
Project Funding: OPWC
VAN-CR124-00.14 Bridge Replacement (PID #115518)
Van Wert County Engineer, Ohio
Approximate Construction Estimate: $1,470,177
Projected Bidding Timeframe: Quarter 1, 2027 by ODOT
Project Funding: ODOT
W. Warren/Canal Street Reconstruction
City of Lebanon, Warren County, Ohio
Approximate Construction Estimate: $1,000,000
Projected Bidding Timeframe: Quarter 1, 2027 by City of Lebanon
Project Funding: Local
WTP Sanitary Sewer Improvements
City of Greenville, Darke County, Ohio
Approximate Construction Estimate: Unknown at this time
Projected Bidding Timeframe: Quarter 1, 2027 by Choice One
Project Funding: OPWC
Ward Street Reconstruction
City of Lebanon, Warren County, Ohio
Approximate Construction Estimate: $700,000
Projected Bidding Timeframe: Quarter 1, 2027 by City of Lebanon
Project Funding: Local
Water Meter Replacement
Village of Sabina, Clinton County, Ohio
Approximate Construction Estimate: $600,000
Projected Bidding Timeframe: Quarter 1, 2027 by Choice One
Project Funding: OPWC
Well Field Improvements
Village of Lewisburg, Preble County, Ohio
Approximate Construction Estimate: $607,000
Projected Bidding Timeframe: Quarter 1, 2027 by Choice One
Project Funding: WSRLA
Wilkinson Ave. and Casey St. Sanitary and Storm Sewer Replacement
City of Sidney, Shelby County, Ohio
Approximate Construction Estimate: $900,000
Projected Bidding Timeframe: Quarter 1, 2027 by City of Sidney
Project Funding: Local
Wilson Ave. Water Main Replacement
City of Sidney, Shelby County, Ohio
Approximate Construction Estimate: $900,000
Projected Bidding Timeframe: Quarter 1, 2027 by City of Sidney
Project Funding: Local
Yellow Springs-Fairfield Road Storm
Village of Yellow Springs, Greene County, Ohio
Approximate Construction Estimate: $525,000
Projected Bidding Timeframe: Quarter 1, 2027 by Choice One
Project Funding: OPWC
Quarter 2, 2027
2027 Morrow Hydrant Replacements
Village of Morrow, Warren County, Ohio
Approximate Construction Estimate: $280,000
Projected Bidding Timeframe: Quarter 2, 2027 by Choice One
Project Funding: OPWC
2027 Owensville Paving Program
Village of Owensville, Clermont County, Ohio
Approximate Construction Estimate: $300,000
Projected Bidding Timeframe: Quarter 2, 2027 by Choice One
Project Funding: OPWC
2027 Water Main Design Project
City of Springboro, Warren County, Ohio
Approximate Construction Estimate: $900,000
Projected Bidding Timeframe: Quarter 2, 2027 by City of Springboro
Project Funding: Local
Commanche Ditch Restoration Phase 1
City of Tipp City, Miami County, Ohio
Approximate Construction Estimate: $300,000
Projected Bidding Timeframe: Quarter 2, 2027 by Choice One
Project Funding: Local
Creekview Drive Storm Outlet Improvements
City of Sharonville, Hamilton, County, Ohio
Approximate Construction Estimate: $100,000
Projected Bidding Timeframe: Quarter 2, 2027 by Choice One
Project Funding: OPWC
East Broadway Street Reconstruction
City of South Lebanon, Warren County, Ohio
Approximate Construction Estimate: $800,000
Projected Bidding Timeframe: Quarter 2, 2027 by Choice One
Project Funding: OPWC
Fancy Street Water Tower Rehabilitation
Village of Blanchester, Clinton County, Ohio
Approximate Construction Estimate: $500,000
Projected Bidding Timeframe: Quarter 2, 2027 by Choice One
Project Funding: Local and OPWC
Garrett Dr. & Betty Ln. Area Water Main Replacement
Clermont County Water Resources Department
Approximate Construction Estimate: $5,000,000
Projected Bidding Timeframe: Quarter 2, 2027 by Clermont County
Project Funding: Local
High Street Culvert Replacement
Village of New Richmond, Clermont County, Ohio
Approximate Construction Estimate: $230,000
Projected Bidding Timeframe: Quarter 2, 2027 by Choice One
Project Funding: OPWC
Light Street Reconstruction
Village of Felicity, Clermont County, Ohio
Approximate Construction Estimate: $1,000,000
Projected Bidding Timeframe: Quarter 2, 2027 by Choice One
Project Funding: OPWC
MOT Kingsridge Drive Improvements (PID: 120184)
Miami Township, Montgomery County
Approximate Construction Estimate: $2,445,000
Projected Bidding Timeframe: Quarter 2, 2027 by ODOT
Project Funding: Safety
Pennyroyal Road Resurfacing (PID 121846)
City of Springboro, Warren County, Ohio
Approximate Construction Estimate: $850,000
Projected Bidding Timeframe: Quarter 2, 2027 by ODOT
Project Funding: MVRPC
Pierce Street Reconstruction
City of Delphos, Allen Couty, Ohio
Approximate Construction Estimate: $3,860,000
Projected Bidding Timeframe: Quarter 2, 2027 by Choice One
Project Funding: WPCLF and WSRLA Lead Service Line
Poplar Creek Sanitary Utility Protection
City of Vandalia, Montgomery County, Ohio
Approximate Construction Estimate: $434,000
Projected Bidding Timeframe: Quarter 2, 2027 by City of Vandalia
Project Funding: Local
Signal Improvements
City of Washington Court House, Ohio
Approximate Construction Estimate: $250,000
Projected Bidding Timeframe: Quarter 2, 2027 by Choice One
Project Funding: OPWC
South Sycamore Street Storm Improvements, Phase 1
Village of North Lewisburg, Champaign County, Ohio
Approximate Construction Estimate: $470,000
Projected Bidding Timeframe: Quarter 2, 2027 by Choice One
Project Funding: CDBG
Springdale Road Sidewalk Phase 2 (PID 120861)
Colerain Township, Hamilton County, Ohio
Approximate Construction Estimate: $669,000
Projected Bidding Timeframe: Quarter 2, 2027 by ODOT Let
Project Funding: Transportation Alternatives
Stonewall Subdivision Drainage Improvements Phase 1
Turtlecreek Township, Warren County, Ohio
Approximate Construction Estimate: $1,700,000
Projected Bidding Timeframe: Quarter 2, 2027 by Warren County
Project Funding: OPWC
Quarter 3, 2027
MOT Arlington Rd. RSF (PID: 121592)
City of Brookville, Montgomery County, Ohio
Approximate Construction Estimate: $605,000
Projected Bidding Timeframe: Quarter 3, 2027 by ODOT
Project Funding: STP
MOT Infirmary – Pinnacle RSF (PID: 121590)
Jefferson Township, Montgomery County, Ohio
Approximate Construction Estimate: $800,000
Projected Bidding Timeframe: Quarter 3, 2027 by ODOT
Project Funding: STP
Valley Bell Connector-Phase 1
Beavercreek Township, Greene County, Ohio
Approximate Construction Estimate: $1,736,000
Projected Bidding Timeframe: Quarter 3, 2027 by Choice One
Project Funding: Federal PDAC and OPWC
Quarter 4, 2027
CLE SR 48-6.65 State Route 48 & Butterworth Sidewalk, PID 121899
City of Loveland, Warren County, Ohio
Approximate Construction Estimate: $2,700,000
Projected Bidding Timeframe: Quarter 4, 2027 by ODOT
Project Funding: Systemic Safety & OKI Transportation-Alternatives
N. Maple St. Reconstruction, Phase 3 (PID 123075)
City of Eaton, Preble County, Ohio
Approximate Construction Estimate: $3,000,000
Projected Bidding Timeframe: Quarter 4, 2027 by ODOT
Project Funding: ODOT Small Cities
Sweitzer Street Improvements
City of Greenville, Darke County, Ohio
Approximate Construction Estimate: $5,137,100
Projected Bidding Timeframe: Quarter 4, 2027 by ODOT
Project Funding: Small City, Local, Safety, Urban Paving
WOO-VAR Fostoria SRTS FY27 (PID 122204)
City of Fostoria, Wood County, Ohio
Approximate Construction Estimate: $770,000
Projected Bidding Timeframe: Quarter 4, 2027 by Choice One
Project Funding: Safe Routes to School
Quarter 1, 2028
Detroit Street Reconstruction Phase 2
City of Kenton, Hardin County, Ohio
Approximate Construction Estimate: Unknown at this time
Projected Bidding Timeframe: Quarter 1, 2028 by ODOT
Project Funding: Small Cities/Local
LOG-Simon Kenton Trail (PID 124338)
Logan County Engineer's Office
Approximate Construction Estimate: $2,300,000
Projected Bidding Timeframe: Quarter 1, 2028 by Logan County Engineer
Project Funding: ODOT Special Bike/Ped Solicitation
Quarter 2, 2028
HAN McComb Sidewalks (PID: 124323)
Village of McComb, Hancock County, Ohio
Approximate Construction Estimate: $1,600,000
Projected Bidding Timeframe: Quarter 2, 2028 by ODOT
Project Funding: ODOT TAP
MOT-SR 741 2.03 Pedestrian Improvements, PID 122021
Miami Township, Clermont County
Approximate Construction Estimate: $950,000
Projected Bidding Timeframe: Quarter 2, 2028 by ODOT
Project Funding: ODOT Systemic Safety
Quarter 3, 2028
GRE-Xenia FY 28 Sidewalk TAP (PID 124967)
City of Xenia, Greene County, Ohio
Approximate Construction Estimate: $760,000
Projected Bidding Timeframe: Quarter 3, 2028 by City of Xenia
Project Funding: ODOT
MOT-CR24-8.17 Intersection (PID: 122785)
City of Clayton, Montgomery County, Ohio
Approximate Construction Estimate: $3,000,000
Projected Bidding Timeframe: Quarter 3, 2028 by City of Clayton
Project Funding: ODOT Systemic Safety
Quarter 4, 2028
4th Street Reconstruction
City of London, Madison County, Ohio
Approximate Construction Estimate: $750,000
Projected Bidding Timeframe: Quarter 4, 2028 by ODOT
Project Funding: ODOT Small Cities
HAM Compton Road Sidewalk (PID 122989)
Colerain Township, Hamilton County, Ohio
Approximate Construction Estimate: $1,579,000
Projected Bidding Timeframe: Quarter 4, 2028 by ODOT Let
Project Funding: OKI Transportation Alternatives
MOT – SR 48 – 20.28 Ped. Imp (PID: 124483)
City of Clayton, Montgomery County, Ohio
Approximate Construction Estimate: $3,410,800
Projected Bidding Timeframe: Quarter 4, 2028 by City of Clayton
Project Funding: ODOT Systemic Safety
Quarter 1, 2029
MOT-Old N. Dayton Trail Segment 3 (PID 119556)
Miami Conservancy District
Approximate Construction Estimate: $900,000
Projected Bidding Timeframe: Quarter 1, 2029 by ODOT
Project Funding: ODOT - TA
South Walnut Street Reconstruction
City of Van Wert, Van Wert, Ohio
Approximate Construction Estimate: $7,571,031
Projected Bidding Timeframe: Quarter 1, 2029 by ODOT
Project Funding: ODOT Small Cities
Quarter 2, 2029
HAM-CR299 6.54 Loveland Madeira Phase 2, PID 125546
City of Loveland, Hamilton County, Ohio
Approximate Construction Estimate: $4,000,000
Projected Bidding Timeframe: Quarter 2, 2029 by ODOT
Project Funding: OKI STBG
Quarter 3, 2029
CR 25A Resurfacing (MIA CR 25A RSF 02.74)
City of Tipp City, Miami County, Ohio
Approximate Construction Estimate: $1,738,728
Projected Bidding Timeframe: Quarter 3, 2029 by ODOT
Project Funding: Surface Transportation Program (STP)
North Main Street Shared Use Path – Poe Rd. to Nims Rd.
City of Bowling Green, Wood County, Ohio
Approximate Construction Estimate: Unknown at this time
Projected Bidding Timeframe: Quarter 3, 2029 by City of Bowling Green
Project Funding: SS4A
Quarter 1, 2030
MOT-Chambersburg/Fishburg-PED (PID: 126229)
City of Huber Heights, Montgomery County, Ohio
Approximate Construction Estimate: $1,200,000
Projected Bidding Timeframe: Quarter 1, 2030 by City of Huber Heights
Project Funding: CR/TA
Quarter 4, 2030
MOT-Mad River Trail Improvements (PID 123892)
Five Rivers MetroParks, Montgomery County, Ohio
Approximate Construction Estimate: $617,000
Projected Bidding Timeframe: Quarter 4, 2030 by Five Rivers MetroParks
Project Funding: ODOT