Interested in future projects?

Future Bidding Possibilities

Quarter 2, 2024

2024 Water Main Design Project

 

City of Springboro, Warren County, Ohio

 
 

Approximate Construction Estimate:
$1,100,000

 

Projected Bidding Timeframe:
Quarter 2, 2024 by City of Springboro

 

Project Funding:
Local

 

Branch Hill Miamiville Road Water Main Replacement

 

Clermont County Water Resources Department

 
 

Approximate Construction Estimate:
$2,700,000

 

Projected Bidding Timeframe:
Quarter 2, 2024 by Clermont County

 

Project Funding:
Local

 

Camargo Road Culvert Replacement

 

Village of Indian Hill, Hamilton County, Ohio

 
 

Approximate Construction Estimate:
$110,000

 

Projected Bidding Timeframe:
Quarter 2, 2024 by Village of Indian Hill

 

Project Funding:
Local

 

Clay Street Waterline

 

City of Delphos, Allen County, Ohio

 
 

Approximate Construction Estimate:
$500,000

 

Projected Bidding Timeframe:
Quarter 2, 2024 by Choice One

 

Project Funding:
OWDA

 

Cross Street Drainage Project

 

Union County Board of County Commissioners

 
 

Approximate Construction Estimate:
$99,975

 

Projected Bidding Timeframe:
Quarter 2, 2024 by Choice One

 

Project Funding:
Local

 

E. 4th Street Sanitary Extension

 

Village of Spencerville, Allen County, Ohio

 
 

Approximate Construction Estimate:
$150,000

 

Projected Bidding Timeframe:
Quarter 2, 2024 by Choice One

 

Project Funding:
Local

 

Elm Street Culvert

 

Village of Spencerville, Allen County, Ohio

 
 

Approximate Construction Estimate:
$295,000

 

Projected Bidding Timeframe:
Quarter 2, 2024 by Choice One

 

Project Funding:
Local

 

Elm Street Pedestrian Improvements

 

Village of Farmersville, Montgomery County, Ohio

 
 

Approximate Construction Estimate:
$100,000

 

Projected Bidding Timeframe:
Quarter 2, 2024 by Choice One

 

Project Funding:
Local

 

Fields Ertel Sidewalk

 

Symmes Township, Hamilton County, Ohio

 
 

Approximate Construction Estimate:
$890,000

 

Projected Bidding Timeframe:
Quarter 2, 2024 by Choice One

 

Project Funding:
SORTA

 

Forest Avenue Reconstruction – Phase 1

 

City of South Lebanon, Warren County, Ohio

 
 

Approximate Construction Estimate:
$770,000

 

Projected Bidding Timeframe:
Quarter 2, 2024 by Choice One

 

Project Funding:
OPWC

 

France Lake Campground Water Extension

 

City of Kenton, Hardin County, Ohio

 
 

Approximate Construction Estimate:
$400,000

 

Projected Bidding Timeframe:
Quarter 2, 2024 by Choice One

 

Project Funding:
WSLRA, Principle Forgiveness

 

Franklin Road Water Main and Street Improvements, Phase 2

 

Village of Waynesville, Warren County, Ohio

 
 

Approximate Construction Estimate:
$1,250,000

 

Projected Bidding Timeframe:
Quarter 2, 2024 by Choice One

 

Project Funding:
OPWC

 

Industrial Park Water System Improvements – Contract A (Water Main Extension)

 

City of Wapakoneta, Auglaize County, Ohio

 
 

Approximate Construction Estimate:
$3,000,000

 

Projected Bidding Timeframe:
Quarter 2, 2024 by Choice One

 

Project Funding:
WRSLA

 

Lane and High Street Improvements

 

Village of Port Jefferson, Shelby County, Ohio

 
 

Approximate Construction Estimate:
$208,600

 

Projected Bidding Timeframe:
Quarter 2, 2024 by Choice One

 

Project Funding:
OPWC

 

Linden Avenue Water Main Replacement

 

City of Sidney, Shelby County, Ohio

 
 

Approximate Construction Estimate:
$520,000

 

Projected Bidding Timeframe:
Quarter 2, 2024 by City of Sidney

 

Project Funding:
Local

 

Main Street Water Main Replacement

 

City of Van Wert, Van Wert, Ohio

 
 

Approximate Construction Estimate:
$700,000

 

Projected Bidding Timeframe:
Quarter 2, 2024 by Choice One

 

Project Funding:
OPWC

 

Mariemont Connector

 

Village of Mariemont, Hamilton County, Ohio

 
 

Approximate Construction Estimate:
$280,000

 

Projected Bidding Timeframe:
Quarter 2, 2024 by Choice One

 

Project Funding:
Local and ODNR

 

Morrow Road Reconstruction

 

City of South Lebanon, Warren County, Ohio

 
 

Approximate Construction Estimate:
$960,000

 

Projected Bidding Timeframe:
Quarter 2, 2024 by Choice One

 

Project Funding:
OPWC

 

Mulberry Place Water, Sanitary Sewer and Storm Sewer Improvements

 

City of Sidney, Shelby County, Ohio

 
 

Approximate Construction Estimate:
$700,000

 

Projected Bidding Timeframe:
Quarter 2, 2024 by City of Sidney

 

Project Funding:
Local

 

Ninth Street Sanitary Rehabilitation

 

City of Delphos, Allen County, Ohio

 
 

Approximate Construction Estimate:
$827,000

 

Projected Bidding Timeframe:
Quarter 2, 2024 by Choice One

 

Project Funding:
WSRLA

 

Park Lift Station Replacement

 

Village of Wayne, Wood County, Ohio

 
 

Approximate Construction Estimate:
$640,000

 

Projected Bidding Timeframe:
Quarter 2, 2024 by Choice One

 

Project Funding:
Local

 

Parkridge, Roundtree, Twincreek, and Creekview Water Main Replacement

 

City of Springboro, Warren County, Ohio

 
 

Approximate Construction Estimate:
$600,000

 

Projected Bidding Timeframe:
Quarter 2, 2024 by City of Springboro

 

Project Funding:
Local

 

Parkview Curb Ramp Replacement Project

 

Village of Minster, Auglaize County, Ohio

 
 

Approximate Construction Estimate:
$340,000

 

Projected Bidding Timeframe:
Quarter 2, 2024 by Choice One

 

Project Funding:
CDBG

 

Perry and Taft Short-Term Traffic Signal Improvements

 

Village of Ottawa, Putnam County, Ohio

 
 

Approximate Construction Estimate:
$180,000

 

Projected Bidding Timeframe:
Quarter 2, 2024 by Choice One

 

Project Funding:
Local

 

Pocono Drive Utility Improvement

 

Village of Bluffton, Hancock County, Ohio

 
 

Approximate Construction Estimate:
$350,000

 

Projected Bidding Timeframe:
Quarter 2, 2024 by Choice One

 

Project Funding:
OPWC

 

S. Howard Street Water Main Replacement, Phase 2

 

Village of Sabina, Clinton County, Ohio

 
 

Approximate Construction Estimate:
$300,000

 

Projected Bidding Timeframe:
Quarter 2, 2024 by Choice One

 

Project Funding:
OPWC

 

SR 126 and Loveland-Miamiville Road Sidewalk

 

Miami Township, Clermont County, Ohio

 
 

Approximate Construction Estimate:
$150,000

 

Projected Bidding Timeframe:
Quarter 2, 2024 by Miami Township

 

Project Funding:
CDBG

 

Seward Road Interconnection and PRV

 

City of Fairfield, Butler County, Ohio

 
 

Approximate Construction Estimate:
$150,000

 

Projected Bidding Timeframe:
Quarter 2, 2024 by City of Fairfield

 

Project Funding:
Local

 

Snider Road Sidewalk

 

Symmes Township, Hamilton County, Ohio

 
 

Approximate Construction Estimate:
$270,000

 

Projected Bidding Timeframe:
Quarter 2, 2024 by Choice One

 

Project Funding:
Local

 

South East Street Bridge Replacement

 

Village of Bethel, Clermont County, Ohio

 
 

Approximate Construction Estimate:
$350,000

 

Projected Bidding Timeframe:
Quarter 2, 2024 by Choice One

 

Project Funding:
OPWC

 

South Main Street Storm Sewer Replacement

 

City of Delphos, Allen County, Ohio

 
 

Approximate Construction Estimate:
$620,000

 

Projected Bidding Timeframe:
Quarter 2, 2024 by Choice One

 

Project Funding:
WPCLF

 

Spinning Road Phase 2 (PID 116871)

 

City of Riverside, Montgomery County, Ohio

 
 

Approximate Construction Estimate:
$830,000

 

Projected Bidding Timeframe:
Quarter 2, 2024 by ODOT

 

Project Funding:
MVRPC/ODOT & OPWC

 

Stillwater River Water Main Crossing

 

Village of West Milton, Miami County, Ohio

 
 

Approximate Construction Estimate:
$900,000

 

Projected Bidding Timeframe:
Quarter 2, 2024 by Choice One

 

Project Funding:
Local

 

Taylor Blair Forcemain Bridge Crossing

 

Village of West Jefferson, Madison County, Ohio

 
 

Approximate Construction Estimate:
$200,000

 

Projected Bidding Timeframe:
Quarter 2, 2024 by Choice One

 

Project Funding:
Local

 

Third Ward Storm Sewer Improvements, Phase 1

 

City of London, Madison County, Ohio

 
 

Approximate Construction Estimate:
$2,500,000

 

Projected Bidding Timeframe:
Quarter 2, 2024 by Choice One

 

Project Funding:
OPWC and Local

 

US Route 40 Water Main Replacement

 

Village of West Jefferson, Madison County, Ohio

 
 

Approximate Construction Estimate:
$1,200,000

 

Projected Bidding Timeframe:
Quarter 2, 2024 by Choice One

 

Project Funding:
OPWC

 

Village of Middleport Water System Improvements – Phase 2

 

Village of Middleport, Meigs County, Ohio

 
 

Approximate Construction Estimate:
$3,960,000

 

Projected Bidding Timeframe:
Quarter 2, 2024 by Choice One

 

Project Funding:
HB 168

 

West Fancy Street Water Main Replacement and Resurfacing, Phase 2

 

Village of Blanchester, Clinton County, Ohio

 
 

Approximate Construction Estimate:
$500,000

 

Projected Bidding Timeframe:
Quarter 2, 2024 by CDC of Ohio

 

Project Funding:
CDBG

 

Wolfangel and Clough Sidewalks

 

Anderson Township, Hamilton County, Ohio

 
 

Approximate Construction Estimate:
$385,000

 

Projected Bidding Timeframe:
Quarter 2, 2024 by Anderson Township

 

Project Funding:
Local

 

Quarter 3, 2024

2024 Resurfacing

 

City of Delphos, Allen County, Ohio

 
 

Approximate Construction Estimate:
$192,400

 

Projected Bidding Timeframe:
Quarter 3, 2024 by Choice One

 

Project Funding:
OPWC

 

2024 Sidewalk Replacement Program

 

City of Troy, Miami County, Ohio

 
 

Approximate Construction Estimate:
Unknown at this time

 

Projected Bidding Timeframe:
Quarter 3, 2024 by City of Troy

 

Project Funding:
Local

 

Cherokee and Main Water Main

 

City of Loveland, Hamilton County, Ohio

 
 

Approximate Construction Estimate:
$2,700,000

 

Projected Bidding Timeframe:
Quarter 3, 2024 by Choice One

 

Project Funding:
OPWC

 

Clearcreek Park Multi-Use Trail

 

City of Springboro, Warren County, Ohio

 
 

Approximate Construction Estimate:
$350,000

 

Projected Bidding Timeframe:
Quarter 3, 2024 by City of Springboro

 

Project Funding:
ODNR

 

Cricket Woods Lift Station and Force Main Replacement

 

Montgomery County Environmental Services, Ohio

 
 

Approximate Construction Estimate:
$600,000

 

Projected Bidding Timeframe:
Quarter 3, 2024 by Montgomery County

 

Project Funding:
Local

 

East Elm Street CDBG Improvements

 

Village of Sabina, Clinton County, Ohio

 
 

Approximate Construction Estimate:
$500,000

 

Projected Bidding Timeframe:
Quarter 3, 2024 by CDC of Ohio

 

Project Funding:
CDBG Critical Infrastructure

 

Kugler Mill Road Culvert and Headwall Repair/Replacement Project

 

Village of Indian Hill, Hamilton County, Ohio

 
 

Approximate Construction Estimate:
$250,000

 

Projected Bidding Timeframe:
Quarter 3, 2024 by Village of Indian Hill

 

Project Funding:
Local

 

Market Street Sanitary Sewer Extension

 

City of Brookville, Montgomery County, Ohio

 
 

Approximate Construction Estimate:
$1,100,000

 

Projected Bidding Timeframe:
Quarter 3, 2024 by Choice One

 

Project Funding:
WPCLF

 

Osage Sidewalk Construction Plans

 

City of Loveland, Hamilton County, Ohio

 
 

Approximate Construction Estimate:
$75,000

 

Projected Bidding Timeframe:
Quarter 3, 2024 by County

 

Project Funding:
CDBG

 

Pike Street Sanitary Sewer Replacement

 

City of Sidney, Shelby County, Ohio

 
 

Approximate Construction Estimate:
$400,000

 

Projected Bidding Timeframe:
Quarter 3, 2024 by City of Sidney

 

Project Funding:
Local

 

SR 66 Pedestrian Crossing (PID: 120486)

 

Village of Minster, Auglaize County, Ohio

 
 

Approximate Construction Estimate:
$100,000

 

Projected Bidding Timeframe:
Quarter 3, 2024 by ODOT

 

Project Funding:
ODOT Safety

 

Tocsin Sanitary Sewer Improvements

 

Wells County, Indiana

 
 

Approximate Construction Estimate:
$4,200,000

 

Projected Bidding Timeframe:
Quarter 3, 2024 by Choice One

 

Project Funding:
SRF - WWSRF

 

Vine Street Water Tower Rehabilitation

 

Village of Blanchester, Clinton County, Ohio

 
 

Approximate Construction Estimate:
$500,000

 

Projected Bidding Timeframe:
Quarter 3, 2024 by Choice One

 

Project Funding:
OPWC

 

Water Tower Replacement

 

Village of Ansonia, Darke County, Ohio

 
 

Approximate Construction Estimate:
$1,500,000

 

Projected Bidding Timeframe:
Quarter 3, 2024 by Choice One

 

Project Funding:
Ohio DOD WWIG, OPWC

 

Quarter 4, 2024

2024 Miami County Bridge Package

 

Miami County Engineer, Ohio

 
 

Approximate Construction Estimate:
$1,700,000

 

Projected Bidding Timeframe:
Quarter 4, 2024 by Miami County Engineers Office

 

Project Funding:
Local

 

Arrowhead Drive Water Main Replacement

 

City of Sidney, Shelby County, Ohio

 
 

Approximate Construction Estimate:
$575,000

 

Projected Bidding Timeframe:
Quarter 4, 2024 by City of Sidney

 

Project Funding:
Local

 

Bowman Trail (PID 117000)

 

City of Lebanon, Warren County, Ohio

 
 

Approximate Construction Estimate:
$1,800,000

 

Projected Bidding Timeframe:
Quarter 4, 2024 by City of Lebanon

 

Project Funding:
ODOT - TA

 

Buckeye Avenue Sanitary Sewer Improvements

 

City of Sidney, Shelby County, Ohio

 
 

Approximate Construction Estimate:
$650,000

 

Projected Bidding Timeframe:
Quarter 4, 2024 by City of Sidney

 

Project Funding:
Local

 

Eastern Regional Sanitary Sewer

 

Logan County Sewer District, Ohio

 
 

Approximate Construction Estimate:
$18,000,000

 

Projected Bidding Timeframe:
Quarter 4, 2024 by Choice One

 

Project Funding:
OEPA

 

Foraker Avenue Water and Sewer Replacement

 

City of Sidney, Shelby County, Ohio

 
 

Approximate Construction Estimate:
Unknown at this time

 

Projected Bidding Timeframe:
Quarter 4, 2024 by City of Sidney

 

Project Funding:
Local

 

Herold Road Water Main Extension

 

Clermont County Water Resources Department

 
 

Approximate Construction Estimate:
$1,800,000

 

Projected Bidding Timeframe:
Quarter 4, 2024 by Clermont County

 

Project Funding:
Local

 

Industrial Park Water System Improvements – Contract B (New Water Tower)

 

City of Wapakoneta, Auglaize County, Ohio

 
 

Approximate Construction Estimate:
$12,000,000

 

Projected Bidding Timeframe:
Quarter 4, 2024 by Choice One

 

Project Funding:
WRSLA

 

Park Residential Subdivision

 

Village of Columbus Grove, Putnam County, Ohio

 
 

Approximate Construction Estimate:
Unknown at this time

 

Projected Bidding Timeframe:
Quarter 4, 2024 by Choice One

 

Project Funding:
Local

 

Powell Road Realignment

 

City of Huber Heights, Montgomery County, Ohio

 
 

Approximate Construction Estimate:
$600,000

 

Projected Bidding Timeframe:
Quarter 4, 2024 by City of Huber Heights

 

Project Funding:
Local & OPWC

 

Rio and Karen Water Main Replacement

 

Montgomery County Environmental Services, Ohio

 
 

Approximate Construction Estimate:
$450,000

 

Projected Bidding Timeframe:
Quarter 4, 2024 by Montgomery County

 

Project Funding:
OPWC and Local

 

Robb Street Reconstruction

 

Village of Jackson Center, Shelby County, Ohio

 
 

Approximate Construction Estimate:
$1,000,000

 

Projected Bidding Timeframe:
Quarter 4, 2024 by Choice One

 

Project Funding:
Local

 

Rumpke Road Area Water Main Replacement

 

Clermont County Water Resources Department, Ohio

 
 

Approximate Construction Estimate:
$2,400,000

 

Projected Bidding Timeframe:
Quarter 4, 2024 by Clermont County

 

Project Funding:
Local

 

Stewart Subdivision Water and Sewer Replacement

 

City of Sidney, Shelby County, Ohio

 
 

Approximate Construction Estimate:
Unknown at this time

 

Projected Bidding Timeframe:
Quarter 4, 2024 by City of Sidney

 

Project Funding:
Local

 

Studebaker Road Waterline Extension Phase 1

 

Miami County Commissioners, Ohio

 
 

Approximate Construction Estimate:
$3,000,000

 

Projected Bidding Timeframe:
Quarter 4, 2024 by Miami County

 

Project Funding:
Local

 

Sunray, Frieda, and Ives Water Main Replacement

 

Montgomery County Environmental Services

 
 

Approximate Construction Estimate:
$1,300,000

 

Projected Bidding Timeframe:
Quarter 4, 2024 by Montgomery County

 

Project Funding:
OPWC

 

Water Main and Lead Service Replacement

 

City of New Carlisle, Clark County, Ohio

 
 

Approximate Construction Estimate:
$2,300,000

 

Projected Bidding Timeframe:
Quarter 4, 2024 by Choice One

 

Project Funding:
ODOD, WSLRA Lead Line

 

Quarter 1, 2025

Detroit Street Reconstruction Phase 1

 

City of Kenton, Hardin County, Ohio

 
 

Approximate Construction Estimate:
$3,996,400

 

Projected Bidding Timeframe:
Quarter 1, 2025 by ODOT

 

Project Funding:
Small Cities

 

HAM-CR-266-14.97 Sidewalk (PID 117220)

 

Sycamore Township, Hamilton County, Ohio

 
 

Approximate Construction Estimate:
$900,000

 

Projected Bidding Timeframe:
Quarter 1, 2025 by Choice One

 

Project Funding:
ODOT Systemic Safety

 

Industrial Park Water Tower and North Water Tower Improvements

 

City of Greenville, Darke County, Ohio

 
 

Approximate Construction Estimate:
$10,000,000

 

Projected Bidding Timeframe:
Quarter 1, 2025 by Choice One

 

Project Funding:
WRSLA

 

MOT-Woodman Dr. Reconstruction (PID 115003)

 

City of Riverside, Montgomery County, Ohio

 
 

Approximate Construction Estimate:
$6,381,000

 

Projected Bidding Timeframe:
Quarter 1, 2025 by ODOT

 

Project Funding:
ODOT STP

 

Mason Morrow Road Pressure Reducing Valve Pit

 

City of South Lebanon, Warren County, Ohio

 
 

Approximate Construction Estimate:
$200,000

 

Projected Bidding Timeframe:
Quarter 1, 2025 by Choice One

 

Project Funding:
Local

 

Pleasant Avenue Water Main Replacement

 

City of Fairfield, Butler County, Ohio

 
 

Approximate Construction Estimate:
$1,750,000

 

Projected Bidding Timeframe:
Quarter 1, 2025 by City of Fairfield

 

Project Funding:
Local

 

S.R. 103 at Navajo Intersection Improvement

 

Village of Bluffton, Hancock County, Ohio

 
 

Approximate Construction Estimate:
$2,200,000

 

Projected Bidding Timeframe:
Quarter 1, 2025 by Choice One

 

Project Funding:
OPWC & Jobs Ohio

 

Springdale Road Sidewalk (PID 117209)

 

Colerain Township, Hamilton County, Ohio

 
 

Approximate Construction Estimate:
$900,000

 

Projected Bidding Timeframe:
Quarter 1, 2025 by ODOT

 

Project Funding:
Transportation Alternatives

 

Quarter 2, 2025

CLA-Little Miami Scenic Trail (PID116105)

 

Clark County Park District, Ohio

 
 

Approximate Construction Estimate:
$150,000

 

Projected Bidding Timeframe:
Quarter 2, 2025 by ODOT

 

Project Funding:
ODOT

 

Indiana Avenue Improvements

 

City of St. Marys, Auglaize County, Ohio

 
 

Approximate Construction Estimate:
$1,677,500

 

Projected Bidding Timeframe:
Quarter 2, 2025 by ODOT

 

Project Funding:
ODOT Safety

 

N. Pearl Street and E. 3rd Street Culvert Replacements

 

Village of Spencerville, Allen County, Ohio

 
 

Approximate Construction Estimate:
$500,000

 

Projected Bidding Timeframe:
Quarter 2, 2025 by Choice One

 

Project Funding:
Local

 

Old North Dayton Trail Segment 2

 

Miami Conservancy District

 
 

Approximate Construction Estimate:
$1,000,000

 

Projected Bidding Timeframe:
Quarter 2, 2025 by ODOT

 

Project Funding:
ODOT

 

Poole Road Sidewalk (PID 119068)

 

Colerain Township, Hamilton County, Ohio

 
 

Approximate Construction Estimate:
$400,000

 

Projected Bidding Timeframe:
Quarter 2, 2025 by ODOT

 

Project Funding:
Local

 

Quarter 3, 2025

PUT Ottawa Pedestrian Improvements (PID: 119793)

 

Village of Ottawa, Putnam County, Ohio

 
 

Approximate Construction Estimate:
$290,000

 

Projected Bidding Timeframe:
Quarter 3, 2025 by ODOT

 

Project Funding:
Systemic Safety Funding

 

Quarter 4, 2025

School & Solzman Sidewalk (PID 119074)

 

Sycamore Township, Hamilton County, Ohio

 
 

Approximate Construction Estimate:
$1,250,000

 

Projected Bidding Timeframe:
Quarter 4, 2025 by Choice One

 

Project Funding:
ODOT Transportation Alternatives

 

Quarter 1, 2026

ALL-Cable Road Improvements, PID: 112573

 

City of Lima, Allen County, Ohio

 
 

Approximate Construction Estimate:
$4,955,000

 

Projected Bidding Timeframe:
Quarter 1, 2026 by ODOT

 

Project Funding:
ODOT Safety

 

MER-Ft. Recovery Sidewalks, PID 117201

 

Village of Fort Recovery, Mercer County, Ohio

 
 

Approximate Construction Estimate:
$1,082,500

 

Projected Bidding Timeframe:
Quarter 1, 2026 by ODOT

 

Project Funding:
ODOT Safety Funding

 

MOT-GMR Trail Renovations PID 115197

 

Five Rivers MetroParks, Montgomery County, Ohio

 
 

Approximate Construction Estimate:
$415,000

 

Projected Bidding Timeframe:
Quarter 1, 2026 by ODOT

 

Project Funding:
ODOT

 

N. Maple St. Reconstruction, Phase 2 (PID 118523)

 

City of Eaton, Preble County, Ohio

 
 

Approximate Construction Estimate:
$2,500,000

 

Projected Bidding Timeframe:
Quarter 1, 2026 by ODOT

 

Project Funding:
ODOT Small Cities

 

SHE-Great Miami Riverway Trail (PID: 119711)

 

Shelby County Commissioners, Ohio

 
 

Approximate Construction Estimate:
$4,200,000

 

Projected Bidding Timeframe:
Quarter 1, 2026 by Shelby County Commissioners

 

Project Funding:
ODOT TAP

 

Westbrook Road Resurfacing (MOT Westbrook RSF 03.11, PID: 119353)

 

City of Brookville, Montgomery County, Ohio

 
 

Approximate Construction Estimate:
$595,000

 

Projected Bidding Timeframe:
Quarter 1, 2026 by ODOT

 

Project Funding:
MVRPC STP

 

Quarter 2, 2026

HAR-US 68/SR 31 Roundabout (PID: 121008)

 

City of Kenton, Hardin County, Ohio

 
 

Approximate Construction Estimate:
$5,500,000

 

Projected Bidding Timeframe:
Quarter 2, 2026 by ODOT

 

Project Funding:
Small Cities Congestion Mitigation

 

MCD ADA Trail Improvement Project (PID 119384)

 

Miami Conservancy District, Ohio

 
 

Approximate Construction Estimate:
$300,000

 

Projected Bidding Timeframe:
Quarter 2, 2026 by ODOT

 

Project Funding:
ODOT

 

MOT SR 48 20.61 Sidewalk (PID: 119822)

 

City of Clayton, Montgomery County, Ohio

 
 

Approximate Construction Estimate:
$2,656,000

 

Projected Bidding Timeframe:
Quarter 2, 2026 by ODOT

 

Project Funding:
Safety

 

SR 501/198 Intersection Improvements (PID 120037)

 

City of Wapakoneta, Auglaize County, Ohio

 
 

Approximate Construction Estimate:
$1,826,000

 

Projected Bidding Timeframe:
Quarter 2, 2026 by ODOT

 

Project Funding:
ODOT Small City Congestion Mitigation

 

SR 571 Pedestrian Improvements (PID: 119378)

 

Village of West Milton, Miami County, Ohio

 
 

Approximate Construction Estimate:
$1,700,000

 

Projected Bidding Timeframe:
Quarter 2, 2026 by ODOT

 

Project Funding:
MVRPC

 

SR125, Plane Street Sidewalk

 

Village of Bethel, Clermont County, Ohio

 
 

Approximate Construction Estimate:
$850,000

 

Projected Bidding Timeframe:
Quarter 2, 2026 by ODOT

 

Project Funding:
ODOT Systemic

 

Quarter 3, 2026

Chambersburg Road West Improvements (PID: 116942)

 

City of Huber Heights, Montgomery County, Ohio

 
 

Approximate Construction Estimate:
$3,350,000

 

Projected Bidding Timeframe:
Quarter 3, 2026 by City of Huber Heights

 

Project Funding:
MVRPC

 

Experiment Farm Road Resurfacing (PID: 119357)

 

City of Troy, Miami County, Ohio

 
 

Approximate Construction Estimate:
$997,000

 

Projected Bidding Timeframe:
Quarter 3, 2026 by ODOT

 

Project Funding:
STP

 

Quarter 1, 2027

Leeson Avenue Phase 2 Reconstruction

 

City of Van Wert, Van Wert, Ohio

 
 

Approximate Construction Estimate:
$4,403,617

 

Projected Bidding Timeframe:
Quarter 1, 2027 by ODOT

 

Project Funding:
Small Cities

 

Quarter 4, 2027

Sweitzer Street Improvements

 

City of Greenville, Darke County, Ohio

 
 

Approximate Construction Estimate:
$5,137,100

 

Projected Bidding Timeframe:
Quarter 4, 2027 by ODOT

 

Project Funding:
Small City, Local, Safety, Urban Paving

 

Quarter 2, 2028

Keever Street Reconstruction

 

City of Lebanon, Warren County, Ohio

 
 

Approximate Construction Estimate:
Unknown at this time

 

Projected Bidding Timeframe:
Quarter 2, 2028 by City of Lebanon

 

Project Funding:
Local

 

Let’s Talk Bidding

Abbey Swick

Megan Bornhost

Megan Bornhorst

We’re Hiring!

If you want to enjoy your career, build lifelong relationships, and be part of a growing civil engineering firm that values its culture, you’ve come to the right place! At Choice One Engineering, our purpose statement is “to provide fulfilling lives for a lifetime.”