Interested in future projects?

Future Bidding Possibilities

Quarter 2, 2019

Brooks Avenue Water Tower Exterior Painting

Brooks Avenue Water Tower Exterior Painting

City of Van Wert, Van Wert, Ohio

Approximate Construction Estimate:
$330,000

Projected Bidding Timeframe:
Quarter 2, 2019 by Choice One

Project Funding:
OPWC/Local

Category:
Description

Brooks Avenue Water Tower Exterior Painting

City of Van Wert, Van Wert, Ohio

Approximate Construction Estimate:
$330,000

Projected Bidding Timeframe:
Quarter 2, 2019 by Choice One

Project Funding:
OPWC/Local

Quarter 3, 2019

Main Street Traffic Signal Upgrades

Main Street Traffic Signal Upgrades

City of New Carlisle, Clark County, Ohio

Approximate Construction Estimate:
$515,000

Projected Bidding Timeframe:
Quarter 3, 2019 by ODOT

Project Funding:
ODOT, CMAQ

Category:
Description

Main Street Traffic Signal Upgrades

City of New Carlisle, Clark County, Ohio

Approximate Construction Estimate:
$515,000

Projected Bidding Timeframe:
Quarter 3, 2019 by ODOT

Project Funding:
ODOT, CMAQ

Village of Ludlow Falls Sanitary Sewer System

Village of Ludlow Falls Sanitary Sewer System

Village of Ludlow Falls, Miami County, Ohio

Approximate Construction Estimate:
$3,096.157

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
USACE, CDBG, OWDA

Category:
Description

Village of Ludlow Falls Sanitary Sewer System

Village of Ludlow Falls, Miami County, Ohio

Approximate Construction Estimate:
$3,096.157

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
USACE, CDBG, OWDA

Lift Station Replacement

Lift Station Replacement

Village of Pandora, Putnam County, Ohio

Approximate Construction Estimate:
$200,000

Projected Bidding Timeframe:
Quarter 2, 2019 by Choice One

Project Funding:
Local

Category:
Description

Lift Station Replacement

Village of Pandora, Putnam County, Ohio

Approximate Construction Estimate:
$200,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
Local

Industrial Park Sanitary Sewer Extension

Industrial Park Sanitary Sewer Extension

Village of Hicksville, Defiance County, Ohio

Approximate Construction Estimate:
$750,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
Local

Category:
Description

Industrial Park Sanitary Sewer Extension

Village of Hicksville, Defiance County, Ohio

Approximate Construction Estimate:
$750,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
Local

State Route 49 Water Main Extension

State Route 49 Water Main Extension

Village of Hicksville, Defiance County, Ohio

Approximate Construction Estimate:
$450,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
Local

Category:
Description

State Route 49 Water Main Extension

Village of Hicksville, Defiance County, Ohio

Approximate Construction Estimate:
$450,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
Local

North End Sewer Separation

North End Sewer Separation

Village of Middleport, Meigs County, Ohio

Approximate Construction Estimate:
$2,100,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
OEPA Principal Forgiveness

Category:
Description

North End Sewer Separation

Village of Middleport, Meigs County, Ohio

Approximate Construction Estimate:
$2,100,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
OEPA Principal Forgiveness

Bethel-Tate Fire Department Parking Lot Improvements

Bethel-Tate Fire Department Parking Lot Improvements

Tate Township, Clermont County, Ohio

Approximate Construction Estimate:
$100,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Clermont County

Project Funding:
CDBG

Category:
Description

Bethel-Tate Fire Department Parking Lot Improvements

Tate Township, Clermont County, Ohio

Approximate Construction Estimate:
$100,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Clermont County

Project Funding:
CDBG

Downtown Sidewalk Replacement

Downtown Sidewalk Replacement

City of Greenville, Darke County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 3, 2019 by City

Project Funding:
Local and CDBG

Category:
Description

Downtown Sidewalk Replacement

City of Greenville, Darke County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 3, 2019 by City

Project Funding:
Local and CDBG

Cooper Farms Utility Extension

Cooper Farms Utility Extension

Village of Fort Recovery, Mercer County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
Local

Category:
Description

Cooper Farms Utility Extension

Village of Fort Recovery, Mercer County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
Local

S. Broadway Greenville Creek Water Main Crossing

S. Broadway Greenville Creek Water Main Crossing

City of Greenville, Darke County, Ohio

Approximate Construction Estimate:
$500,000

Projected Bidding Timeframe:
Quarter 3, 2019 by City of Greenville

Project Funding:
Local

Category:
Description

S. Broadway Greenville Creek Water Main Crossing

City of Greenville, Darke County, Ohio

Approximate Construction Estimate:
$500,000

Projected Bidding Timeframe:
Quarter 3, 2019 by City of Greenville

Project Funding:
Local

Manhole Chimney Reconstruction

Manhole Chimney Reconstruction

Village of Ada, Hardin County, Ohio

Approximate Construction Estimate:
$75,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
Local

Category:
Description

Manhole Chimney Reconstruction

Village of Ada, Hardin County, Ohio

Approximate Construction Estimate:
$75,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
Local

Chapel Road Sidewalk

Chapel Road Sidewalk

Village of Amelia, Clermont County, Ohio

Approximate Construction Estimate:
$90,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Clermont County

Project Funding:
CDBG

Category:
Description

Chapel Road Sidewalk

Village of Amelia, Clermont County, Ohio

Approximate Construction Estimate:
$90,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Clermont County

Project Funding:
CDBG

Beach Drive Storm Sewer

Beach Drive Storm Sewer

Village of Donnelsville, Clark County, Ohio

Approximate Construction Estimate:
$65,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Clark County

Project Funding:
CDBG

Category:
Description

Beach Drive Storm Sewer

Village of Donnelsville, Clark County, Ohio

Approximate Construction Estimate:
$65,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Clark County

Project Funding:
CDBG

Seward Road Water Main Replacement

Seward Road Water Main Replacement

City of Fairfield, Butler County, Ohio

Approximate Construction Estimate:
$750,000

Projected Bidding Timeframe:
Quarter 3, 2019 by City of Fairfield

Project Funding:
Local

Category:
Description

Seward Road Water Main Replacement

City of Fairfield, Butler County, Ohio

Approximate Construction Estimate:
$750,000

Projected Bidding Timeframe:
Quarter 3, 2019 by City of Fairfield

Project Funding:
Local

South Street Reconstruction – Phase 1

South Street Reconstruction – Phase 1

Village of Anna, Shelby County, Ohio

Approximate Construction Estimate:
$520,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
OPWC

Category:
Description

South Street Reconstruction – Phase 1

Village of Anna, Shelby County, Ohio

Approximate Construction Estimate:
$520,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
OPWC

Sanitary Sewer Extension

Sanitary Sewer Extension

City of Delphos, Allen County, Ohio

Approximate Construction Estimate:
$100,000

Projected Bidding Timeframe:
Quarter 2, 2019 by Choice One

Project Funding:
Local

Category:
Description

Sanitary Sewer Extension

City of Delphos, Allen County, Ohio

Approximate Construction Estimate:
$100,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
Local

Hoffman Road Widening

Hoffman Road Widening

Miami Township, Clermont County

Approximate Construction Estimate:
$120,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Miami Township

Project Funding:
Local

Category:
Description

Hoffman Road Widening

Miami Township, Clermont County

Approximate Construction Estimate:
$120,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Miami Township

Project Funding:
Local

N. East Street Storm Sewer Improvements

N. East Street Storm Sewer Improvements

Village of Bethel, Clermont County, Ohio

Approximate Construction Estimate:
$100,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
Local

Category:
Description

N. East Street Storm Sewer Improvements

Village of Bethel, Clermont County, Ohio

Approximate Construction Estimate:
$100,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
Local

AUG-Wapak Riverscape (PID 102167)

AUG-Wapak Riverscape (PID 102167)

City of Wapakoneta, Auglaize County, Ohio

Approximate Construction Estimate:
$2,200,000

Projected Bidding Timeframe:
Quarter 3, 2019 by ODOT

Project Funding:
ODOT

Category:
Description

AUG-Wapak Riverscape (PID 102167)

City of Wapakoneta, Auglaize County, Ohio

Approximate Construction Estimate:
$2,200,000

Projected Bidding Timeframe:
Quarter 3, 2019 by ODOT

Project Funding:
ODOT

WWTP Blower Replacement

WWTP Blower Replacement

City of Van Wert, Van Wert, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
OPWC/Local

Category:
Description

WWTP Blower Replacement

City of Van Wert, Van Wert, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
OPWC/Local

Quarter 4, 2019

Traffic Signal Improvements

Traffic Signal Improvements

Village of New Bremen, Auglaize County, Ohio

Approximate Construction Estimate:
$1,000,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
Local

Category:
Description

Traffic Signal Improvements

Village of New Bremen, Auglaize County, Ohio

Approximate Construction Estimate:
$1,000,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
Local

Gay Street Reconstruction Phase 2 – 4th to Railroad

Gay Street Reconstruction Phase 2 – 4th to Railroad

Village of Williamsburg, Clermont County, Ohio

Approximate Construction Estimate:
$700,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
OPWC

Category:
Description

Gay Street Reconstruction Phase 2 – 4th to Railroad

Village of Williamsburg, Clermont County, Ohio

Approximate Construction Estimate:
$700,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
OPWC

MOT Five Rivers Metro Parks (PID 101476)

MOT Five Rivers Metro Parks (PID 101476)

Five Rivers MetroParks

Approximate Construction Estimate:
$900,000

Projected Bidding Timeframe:
Quarter 4, 2019 by ODOT

Project Funding:
ODOT

Category:
Description

MOT Five Rivers Metro Parks (PID 101476)

Five Rivers MetroParks

Approximate Construction Estimate:
$900,000

Projected Bidding Timeframe:
Quarter 4, 2019 by ODOT

Project Funding:
ODOT

Basketball and Pickle Ball Courts

Basketball and Pickle Ball Courts

Village of Minster, Auglaize County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
Local

Category:
Description

Basketball and Pickle Ball Courts

Village of Minster, Auglaize County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
Local

Kelley Nature Preserve Boat Ramp

Kelley Nature Preserve Boat Ramp

Miami Township, Clermont County, Ohio

Approximate Construction Estimate:
$80,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Miami Township

Project Funding:
Local

Category:
Description

Kelley Nature Preserve Boat Ramp

Miami Township, Clermont County, Ohio

Approximate Construction Estimate:
$80,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Miami Township

Project Funding:
Local

Murray Avenue Bike Trail (Settle to Plainville)

Murray Avenue Bike Trail (Settle to Plainville)

Village of Mariemont, Hamilton County, Ohio

Approximate Construction Estimate:
$350,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
ODNR-Clean Ohio Trails

Category:
Description

Murray Avenue Bike Trail (Settle to Plainville)

Village of Mariemont, Hamilton County, Ohio

Approximate Construction Estimate:
$350,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
ODNR-Clean Ohio Trails

Middleport Well Vaults

Middleport Well Vaults

Village of Middleport, Meigs County, Ohio

Approximate Construction Estimate:
$75,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
Local

Category:
Description

Middleport Well Vaults

Village of Middleport, Meigs County, Ohio

Approximate Construction Estimate:
$75,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
Local

Bridle Road Sidewalk

Bridle Road Sidewalk

Anderson Township, Hamilton County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 2, 2019 by Hamilton County

Project Funding:
Local

Category:
Description

Bridle Road Sidewalk

Anderson Township, Hamilton County, Ohio

Approximate Construction Estimate:
$200,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Hamilton County

Project Funding:
Local

Water Booster Pump

Water Booster Pump

Municipality of West Milton, Miami County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
OPWC

Category:
Description

Water Booster Pump

Municipality of West Milton, Miami County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
OPWC

Airstream Traffic Signal

Airstream Traffic Signal

Village of Jackson Center, Shelby County, Ohio

Approximate Construction Estimate:
$200,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
Local, Jobs and Commerce

Category:
Description

Airstream Traffic Signal

Village of Jackson Center, Shelby County, Ohio

Approximate Construction Estimate:
$200,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
Local, Jobs and Commerce

Haynes Park and Middle Street Storm Sewer Improvements

Haynes Park and Middle Street Storm Sewer Improvements

City of Portland, Jay County, Indiana

Approximate Construction Estimate:
$700,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
Local, CCMG

Category:
Description

Haynes Park and Middle Street Storm Sewer Improvements

City of Portland, Jay County, Indiana

Approximate Construction Estimate:
$700,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
Local, CCMG

SR 274 Turn Lane Improvements

SR 274 Turn Lane Improvements

Village of New Bremen, Auglaize County, Ohio

Approximate Construction Estimate:
$650,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
Jobs Ohio & 629

Category:
Description

SR 274 Turn Lane Improvements

Village of New Bremen, Auglaize County, Ohio

Approximate Construction Estimate:
$650,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
Jobs Ohio & 629

Alley Storm Sewer Project

Alley Storm Sewer Project

Village of Ottoville, Putnam County, Ohio

Approximate Construction Estimate:
$544,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
OPWC

Category:
Description

Alley Storm Sewer Project

Village of Ottoville, Putnam County, Ohio

Approximate Construction Estimate:
$544,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
OPWC

West Benton St. Reconstruction, Ph. 1

West Benton St. Reconstruction, Ph. 1

City of Wapakoneta, Auglaize County, Ohio

Approximate Construction Estimate:
$2,250,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
CDBG

Category:
Description

West Benton St. Reconstruction, Ph. 1

City of Wapakoneta, Auglaize County, Ohio

Approximate Construction Estimate:
$2,250,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
CDBG

Pool Renovation Bidding

Pool Renovation Bidding

Village of Jackson Center, Shelby County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
Local

Category:
Description

Pool Renovation Bidding

Village of Jackson Center, Shelby County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
Local

Parkdale Drive Sanitary Sewer Replacement

Parkdale Drive Sanitary Sewer Replacement

Village of West Jefferson, Madison County, Ohio

Approximate Construction Estimate:
$292,450

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
Local

Category:
Description

Parkdale Drive Sanitary Sewer Replacement

Village of West Jefferson, Madison County, Ohio

Approximate Construction Estimate:
$292,450

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
Local

Quarter 1, 2020

Wagner Avenue Widening

Wagner Avenue Widening

City of Greenville, Darke County, Ohio

Approximate Construction Estimate:
$1,591,600

Projected Bidding Timeframe:
Quarter 1, 2020 by City of Greenville

Project Funding:
OPWC

Category:
Description

Wagner Avenue Widening

City of Greenville, Darke County, Ohio

Approximate Construction Estimate:
$1,591,600

Projected Bidding Timeframe:
Quarter 1, 2020 by City of Greenville

Project Funding:
OPWC

Broadway Street Improvements

Broadway Street Improvements

Village of Fort Recovery, Mercer County, Ohio

Approximate Construction Estimate:
$1,500,000

Projected Bidding Timeframe:
Quarter 1, 2020 by Choice One

Project Funding:
OPWC, CDBG, LOCAL

Category:
Description

Broadway Street Improvements

Village of Fort Recovery, Mercer County, Ohio

Approximate Construction Estimate:
$1,500,000

Projected Bidding Timeframe:
Quarter 1, 2020 by Choice One

Project Funding:
OPWC, CDBG, LOCAL

Green Street Bridge 523 Replacement

Green Street Bridge 523 Replacement

Wayne County Engineer, Indiana

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 1, 2020 by Wayne County

Project Funding:
Local/CCMG

Category:
Description

Green Street Bridge 523 Replacement

Wayne County Engineer, Indiana

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 1, 2020 by Wayne County

Project Funding:
Local/CCMG

Spring Hill Road Reconstruction

Spring Hill Road Reconstruction

Village of Clarksville, Clinton County, Ohio

Approximate Construction Estimate:
$400,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
OPWC

Category:
Description

Spring Hill Road Reconstruction

Village of Clarksville, Clinton County, Ohio

Approximate Construction Estimate:
$400,000

Projected Bidding Timeframe:
Quarter 1, 2020 by Choice One

Project Funding:
OPWC

Jefferson Street Reconstruction – Phase 2

Jefferson Street Reconstruction – Phase 2

Village of Bluffton, Allen County, Ohio

Approximate Construction Estimate:
$845,000

Projected Bidding Timeframe:
Quarter 1, 2020 by Choice One

Project Funding:
OPWC

Category:
Description

Jefferson Street Reconstruction – Phase 2

Village of Bluffton, Allen County, Ohio

Approximate Construction Estimate:
$845,000

Projected Bidding Timeframe:
Quarter 1, 2020 by Choice One

Project Funding:
OPWC

Lewistown Sanitary Sewer

Lewistown Sanitary Sewer

Logan County Water Pollution Control District

Approximate Construction Estimate:
$3,000,000

Projected Bidding Timeframe:
Quarter 1, 2020 by Choice One

Project Funding:
USACE, OWDA, local

Category:
Description

Lewistown Sanitary Sewer

Logan County Water Pollution Control District

Approximate Construction Estimate:
$3,000,000

Projected Bidding Timeframe:
Quarter 1, 2020 by Choice One

Project Funding:
USACE, OWDA, local

Western Row Road Improvements

Western Row Road Improvements

Warren County Transporation Improvement District, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 1, 2020 by Warren County Transporation Improvement District

Project Funding:
Local

Category:
Description

Western Row Road Improvements

Warren County Transporation Improvement District, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 1, 2020 by Warren County Transporation Improvement District

Project Funding:
Local

Crown and Victory Water Main Replacement

Crown and Victory Water Main Replacement

Montgomery County Environmental Services, Ohio

Approximate Construction Estimate:
$600,000

Projected Bidding Timeframe:
Quarter 1, 2020 by Montgomery County

Project Funding:
Local and OPWC

Category:
Description

Crown and Victory Water Main Replacement

Montgomery County Environmental Services, Ohio

Approximate Construction Estimate:
$600,000

Projected Bidding Timeframe:
Quarter 1, 2020 by Montgomery County

Project Funding:
Local and OPWC

Quarter 2, 2020

John Gray Road Sidewalk Improvements

John Gray Road Sidewalk Improvements

City of Fairfield, Butler County, Ohio

Approximate Construction Estimate:
$290,000

Projected Bidding Timeframe:
Quarter 2, 2020 by the City of Fairfield

Project Funding:
Local

Category:
Description

John Gray Road Sidewalk Improvements

City of Fairfield, Butler County, Ohio

Approximate Construction Estimate:
$290,000

Projected Bidding Timeframe:
Quarter 2, 2020 by the City of Fairfield

Project Funding:
Local

AUG-SRTS Wapak Infrastructure (PID 106131)

AUG-SRTS Wapak Infrastructure (PID 106131)

City of Wapakoneta, Auglaize County, Ohio

Approximate Construction Estimate:
$360,000

Projected Bidding Timeframe:
Quarter 2, 2020 by ODOT

Project Funding:
ODOT

Category:
Description

AUG-SRTS Wapak Infrastructure (PID 106131)

City of Wapakoneta, Auglaize County, Ohio

Approximate Construction Estimate:
$360,000

Projected Bidding Timeframe:
Quarter 2, 2020 by ODOT

Project Funding:
ODOT

Mason-Lebanon Bike Path Connector (PID 105175)

Mason-Lebanon Bike Path Connector (PID 105175)

City of Mason, Warren County, Ohio

Approximate Construction Estimate:
$625,000

Projected Bidding Timeframe:
Quarter 2, 2020 by City of Mason

Project Funding:
ODOT

Category:
Description

Mason-Lebanon Bike Path Connector (PID 105175)

City of Mason, Warren County, Ohio

Approximate Construction Estimate:
$625,000

Projected Bidding Timeframe:
Quarter 2, 2020 by City of Mason

Project Funding:
ODOT

Summit Street and Highland Avenue Reconstruction

Summit Street and Highland Avenue Reconstruction

City of Lebanon, Warren County, Ohio

Approximate Construction Estimate:
$2,000,000

Projected Bidding Timeframe:
Quarter 2, 2020 by City of Lebanon

Project Funding:
OPWC

Category:
Description

Summit Street and Highland Avenue Reconstruction

City of Lebanon, Warren County, Ohio

Approximate Construction Estimate:
$2,000,000

Projected Bidding Timeframe:
Quarter 2, 2020 by City of Lebanon

Project Funding:
OPWC

Yellow Springs-Fairfield Rd. Improvements (PID 101498)

Yellow Springs-Fairfield Rd. Improvements (PID 101498)

City of Fairborn, Greene County

Approximate Construction Estimate:
$2,500,000

Projected Bidding Timeframe:
Quarter 2, 2020 by ODOT

Project Funding:
ODOT/MVRPC STP Funds

Category:
Description

Yellow Springs-Fairfield Rd. Improvements (PID 101498)

City of Fairborn, Greene County

Approximate Construction Estimate:
$2,500,000

Projected Bidding Timeframe:
Quarter 2, 2020 by ODOT

Project Funding:
ODOT/MVRPC STP Funds

Greenback Rd. Reconstruction, Phase 1

Greenback Rd. Reconstruction, Phase 1

Village of Fort Loramie, Shelby County, Ohio

Approximate Construction Estimate:
$1,680,000

Projected Bidding Timeframe:
Quarter 2, 2020 by Choice One

Project Funding:
TBD

Category:
Description

Greenback Rd. Reconstruction, Phase 1

Village of Fort Loramie, Shelby County, Ohio

Approximate Construction Estimate:
$1,680,000

Projected Bidding Timeframe:
Quarter 2, 2020 by Choice One

Project Funding:
TBD

Quarter 4, 2020

Lincoln Avenue Phase 3, PID 106438

Lincoln Avenue Phase 3, (PID 106438)

Village of Ada, Hardin County, Ohio

Approximate Construction Estimate:
$2,678,000

Projected Bidding Timeframe:
Quarter 4, 2020 by ODOT

Project Funding:
ODOT

Category:
Description

Lincoln Avenue Phase 3, (PID 106438)

Village of Ada, Hardin County, Ohio

Approximate Construction Estimate:
$2,678,000

Projected Bidding Timeframe:
Quarter 4, 2020 by ODOT

Project Funding:
ODOT

Quarter 1, 2021

MOT-E. Springfield Street Improvements

MOT-E. Springfield Street Improvements

City of Riverside, Montgomery County, Ohio

Approximate Construction Estimate:
$2,600,000

Projected Bidding Timeframe:
Quarter 1, 2021 by ODOT

Project Funding:
ODOT, MVRPC

Category:
Description

MOT-E. Springfield Street Improvements

City of Riverside, Montgomery County, Ohio

Approximate Construction Estimate:
$2,600,000

Projected Bidding Timeframe:
Quarter 1, 2021 by ODOT

Project Funding:
ODOT, MVRPC

SR4 and Micheal/Camelot Realignment

SR4 and Micheal/Camelot Realignment

City of Fairfield, Butler County, Ohio

Approximate Construction Estimate:
$1,500,000

Projected Bidding Timeframe:
Quarter 1, 2021 by City of Fairfield

Project Funding:
Safety – ODOT

Category:
Description

SR4 and Micheal/Camelot Realignment

City of Fairfield, Butler County, Ohio

Approximate Construction Estimate:
$1,500,000

Projected Bidding Timeframe:
Quarter 1, 2021 by City of Fairfield

Project Funding:
Safety – ODOT

New Street Reconstruction

New Street Reconstruction

City of Lebanon, Warren County, Ohio

Approximate Construction Estimate:
$1,300,000

Projected Bidding Timeframe:
Quarter 1, 2021 by City of Lebanon

Project Funding:
OPWC

Category:
Description