Interested in future projects?

Future Bidding Possibilities

Quarter 3, 2019

Bethel-Tate Fire Department Parking Lot Improvements

Bethel-Tate Fire Department Parking Lot Improvements

Tate Township, Clermont County, Ohio

Approximate Construction Estimate:
$100,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Clermont County

Project Funding:
CDBG

Category:
Description

Bethel-Tate Fire Department Parking Lot Improvements

Tate Township, Clermont County, Ohio

Approximate Construction Estimate:
$100,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Clermont County

Project Funding:
CDBG

Downtown Sidewalk Replacement

Downtown Sidewalk Replacement

City of Greenville, Darke County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 3, 2019 by City

Project Funding:
Local and CDBG

Category:
Description

Downtown Sidewalk Replacement

City of Greenville, Darke County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 3, 2019 by City

Project Funding:
Local and CDBG

Cooper Farms Utility Extension

Cooper Farms Utility Extension

Village of Fort Recovery, Mercer County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
Local

Category:
Description

Cooper Farms Utility Extension

Village of Fort Recovery, Mercer County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
Local

S. Broadway Greenville Creek Water Main Crossing

S. Broadway Greenville Creek Water Main Crossing

City of Greenville, Darke County, Ohio

Approximate Construction Estimate:
$500,000

Projected Bidding Timeframe:
Quarter 3, 2019 by City of Greenville

Project Funding:
Local

Category:
Description

S. Broadway Greenville Creek Water Main Crossing

City of Greenville, Darke County, Ohio

Approximate Construction Estimate:
$500,000

Projected Bidding Timeframe:
Quarter 3, 2019 by City of Greenville

Project Funding:
Local

Manhole Chimney Reconstruction

Manhole Chimney Reconstruction

Village of Ada, Hardin County, Ohio

Approximate Construction Estimate:
$75,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
Local

Category:
Description

Manhole Chimney Reconstruction

Village of Ada, Hardin County, Ohio

Approximate Construction Estimate:
$75,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
Local

Seward Road Water Main Replacement

Seward Road Water Main Replacement

City of Fairfield, Butler County, Ohio

Approximate Construction Estimate:
$750,000

Projected Bidding Timeframe:
Quarter 3, 2019 by City of Fairfield

Project Funding:
Local

Category:
Description

Seward Road Water Main Replacement

City of Fairfield, Butler County, Ohio

Approximate Construction Estimate:
$750,000

Projected Bidding Timeframe:
Quarter 3, 2019 by City of Fairfield

Project Funding:
Local

Quarter 4, 2019

Village of Ludlow Falls Sanitary Sewer System

Village of Ludlow Falls Sanitary Sewer System

Village of Ludlow Falls, Miami County, Ohio

Approximate Construction Estimate:
$3,096.157

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
USACE, CDBG, OWDA

Category:
Description

Village of Ludlow Falls Sanitary Sewer System

Village of Ludlow Falls, Miami County, Ohio

Approximate Construction Estimate:
$3,096.157

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
USACE, CDBG, OWDA

Gay Street Reconstruction Phase 2 – 4th to Railroad

Gay Street Reconstruction Phase 2 – 4th to Railroad

Village of Williamsburg, Clermont County, Ohio

Approximate Construction Estimate:
$700,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
OPWC

Category:
Description

Gay Street Reconstruction Phase 2 – 4th to Railroad

Village of Williamsburg, Clermont County, Ohio

Approximate Construction Estimate:
$700,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
OPWC

MOT Five Rivers Metro Parks (PID 101476)

MOT Five Rivers Metro Parks (PID 101476)

Five Rivers MetroParks

Approximate Construction Estimate:
$900,000

Projected Bidding Timeframe:
Quarter 4, 2019 by ODOT

Project Funding:
ODOT

Category:
Description

MOT Five Rivers Metro Parks (PID 101476)

Five Rivers MetroParks

Approximate Construction Estimate:
$900,000

Projected Bidding Timeframe:
Quarter 4, 2019 by ODOT

Project Funding:
ODOT

Broadway Street Improvements

Broadway Street Improvements

Village of Fort Recovery, Mercer County, Ohio

Approximate Construction Estimate:
$1,500,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
OPWC, CDBG, LOCAL

Category:
Description

Broadway Street Improvements

Village of Fort Recovery, Mercer County, Ohio

Approximate Construction Estimate:
$1,500,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
OPWC, CDBG, LOCAL

Kelley Nature Preserve Boat Ramp

Kelley Nature Preserve Boat Ramp

Miami Township, Clermont County, Ohio

Approximate Construction Estimate:
$80,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Miami Township

Project Funding:
Local

Category:
Description

Kelley Nature Preserve Boat Ramp

Miami Township, Clermont County, Ohio

Approximate Construction Estimate:
$80,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Miami Township

Project Funding:
Local

Murray Avenue Bike Trail (Settle to Plainville)

Murray Avenue Bike Trail (Settle to Plainville)

Village of Mariemont, Hamilton County, Ohio

Approximate Construction Estimate:
$350,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
ODNR-Clean Ohio Trails

Category:
Description

Murray Avenue Bike Trail (Settle to Plainville)

Village of Mariemont, Hamilton County, Ohio

Approximate Construction Estimate:
$350,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
ODNR-Clean Ohio Trails

Bridle Road Sidewalk

Bridle Road Sidewalk

Anderson Township, Hamilton County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 2, 2019 by Hamilton County

Project Funding:
Local

Category:
Description

Bridle Road Sidewalk

Anderson Township, Hamilton County, Ohio

Approximate Construction Estimate:
$200,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Hamilton County

Project Funding:
Local

Chapel Road Sidewalk

Chapel Road Sidewalk

Village of Amelia, Clermont County, Ohio

Approximate Construction Estimate:
$90,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Clermont County

Project Funding:
CDBG

Category:
Description

Chapel Road Sidewalk

Village of Amelia, Clermont County, Ohio

Approximate Construction Estimate:
$90,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Clermont County

Project Funding:
CDBG

Airstream Traffic Signal

Airstream Traffic Signal

Village of Jackson Center, Shelby County, Ohio

Approximate Construction Estimate:
$200,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
Local, Jobs and Commerce

Category:
Description

Airstream Traffic Signal

Village of Jackson Center, Shelby County, Ohio

Approximate Construction Estimate:
$200,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
Local, Jobs and Commerce

Haynes Park and Middle Street Storm Sewer Improvements

Haynes Park and Middle Street Storm Sewer Improvements

City of Portland, Jay County, Indiana

Approximate Construction Estimate:
$700,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
Local, CCMG

Category:
Description

Haynes Park and Middle Street Storm Sewer Improvements

City of Portland, Jay County, Indiana

Approximate Construction Estimate:
$700,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
Local, CCMG

SR 274 Turn Lane Improvements

SR 274 Turn Lane Improvements

Village of New Bremen, Auglaize County, Ohio

Approximate Construction Estimate:
$650,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
Jobs Ohio & 629

Category:
Description

SR 274 Turn Lane Improvements

Village of New Bremen, Auglaize County, Ohio

Approximate Construction Estimate:
$650,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
Jobs Ohio & 629

Alley Storm Sewer Project

Alley Storm Sewer Project

Village of Ottoville, Putnam County, Ohio

Approximate Construction Estimate:
$544,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
OPWC

Category:
Description

Alley Storm Sewer Project

Village of Ottoville, Putnam County, Ohio

Approximate Construction Estimate:
$544,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
OPWC

West Benton St. Reconstruction, Ph. 1

West Benton St. Reconstruction, Ph. 1

City of Wapakoneta, Auglaize County, Ohio

Approximate Construction Estimate:
$2,250,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
CDBG

Category:
Description

West Benton St. Reconstruction, Ph. 1

City of Wapakoneta, Auglaize County, Ohio

Approximate Construction Estimate:
$2,250,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
CDBG

Pool Renovation Bidding

Pool Renovation Bidding

Village of Jackson Center, Shelby County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
Local

Category:
Description

Pool Renovation Bidding

Village of Jackson Center, Shelby County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
Local

Parkdale Drive Sanitary Sewer Replacement

Parkdale Drive Sanitary Sewer Replacement

Village of West Jefferson, Madison County, Ohio

Approximate Construction Estimate:
$292,450

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
Local

Category:
Description

Parkdale Drive Sanitary Sewer Replacement

Village of West Jefferson, Madison County, Ohio

Approximate Construction Estimate:
$292,450

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
Local

Hialeah Court Drainage Improvements

Hialeah Court Drainage Improvements

City of Vandalia, Montgomery County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 4, 2019 by City of Vandalia

Project Funding:
Local

Category:
Description

Hialeah Court Drainage Improvements

City of Vandalia, Montgomery County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 4, 2019 by City of Vandalia

Project Funding:
Local

2018 Community Center Improvements Bidding

2018 Community Center Improvements Bidding

Village of Port Jefferson, Shelby County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
Local

Category:
Description

2018 Community Center Improvements Bidding

Village of Port Jefferson, Shelby County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
Local

Quarter 1, 2020

Wagner Avenue Widening

Wagner Avenue Widening

City of Greenville, Darke County, Ohio

Approximate Construction Estimate:
$1,591,600

Projected Bidding Timeframe:
Quarter 1, 2020 by City of Greenville

Project Funding:
OPWC

Category:
Description

Wagner Avenue Widening

City of Greenville, Darke County, Ohio

Approximate Construction Estimate:
$1,591,600

Projected Bidding Timeframe:
Quarter 1, 2020 by City of Greenville

Project Funding:
OPWC

Industrial Park Sanitary Sewer Extension

Industrial Park Sanitary Sewer Extension

Village of Hicksville, Defiance County, Ohio

Approximate Construction Estimate:
$750,000

Projected Bidding Timeframe:
Quarter 1, 2020 by Choice One

Project Funding:
Local

Category:
Description

Industrial Park Sanitary Sewer Extension

Village of Hicksville, Defiance County, Ohio

Approximate Construction Estimate:
$750,000

Projected Bidding Timeframe:
Quarter 1, 2020 by Choice One

Project Funding:
Local

State Route 49 Water Main Extension

State Route 49 Water Main Extension

Village of Hicksville, Defiance County, Ohio

Approximate Construction Estimate:
$450,000

Projected Bidding Timeframe:
Quarter 1, 2020 by Choice One

Project Funding:
Local

Category:
Description

State Route 49 Water Main Extension

Village of Hicksville, Defiance County, Ohio

Approximate Construction Estimate:
$450,000

Projected Bidding Timeframe:
Quarter 1, 2020 by Choice One

Project Funding:
Local

Spring Hill Road Reconstruction

Spring Hill Road Reconstruction

Village of Clarksville, Clinton County, Ohio

Approximate Construction Estimate:
$400,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
OPWC

Category:
Description

Spring Hill Road Reconstruction

Village of Clarksville, Clinton County, Ohio

Approximate Construction Estimate:
$400,000

Projected Bidding Timeframe:
Quarter 1, 2020 by Choice One

Project Funding:
OPWC

Water Booster Pump

Water Booster Pump

Municipality of West Milton, Miami County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 1, 2020 by Choice One

Project Funding:
OPWC

Category:
Description

Water Booster Pump

Municipality of West Milton, Miami County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 1, 2020 by Choice One

Project Funding:
OPWC

Jefferson Street Reconstruction – Phase 2

Jefferson Street Reconstruction – Phase 2

Village of Bluffton, Allen County, Ohio

Approximate Construction Estimate:
$845,000

Projected Bidding Timeframe:
Quarter 1, 2020 by Choice One

Project Funding:
OPWC

Category:
Description

Jefferson Street Reconstruction – Phase 2

Village of Bluffton, Allen County, Ohio

Approximate Construction Estimate:
$845,000

Projected Bidding Timeframe:
Quarter 1, 2020 by Choice One

Project Funding:
OPWC

Beach Drive Storm Sewer

Beach Drive Storm Sewer

Village of Donnelsville, Clark County, Ohio

Approximate Construction Estimate:
$65,000

Projected Bidding Timeframe:
Quarter 1, 2020 by Clark County

Project Funding:
CDBG

Category:
Description

Beach Drive Storm Sewer

Village of Donnelsville, Clark County, Ohio

Approximate Construction Estimate:
$65,000

Projected Bidding Timeframe:
Quarter 1, 2020 by Clark County

Project Funding:
CDBG

Lewistown Sanitary Sewer

Lewistown Sanitary Sewer

Logan County Water Pollution Control District

Approximate Construction Estimate:
$3,000,000

Projected Bidding Timeframe:
Quarter 1, 2020 by Choice One

Project Funding:
USACE, OWDA, local

Category:
Description

Lewistown Sanitary Sewer

Logan County Water Pollution Control District

Approximate Construction Estimate:
$3,000,000

Projected Bidding Timeframe:
Quarter 1, 2020 by Choice One

Project Funding:
USACE, OWDA, local

N. East Street Storm Sewer Improvements

N. East Street Storm Sewer Improvements

Village of Bethel, Clermont County, Ohio

Approximate Construction Estimate:
$296,000

Projected Bidding Timeframe:
Quarter 1, 2020 by Choice One

Project Funding:
OPWC

Category:
Description

N. East Street Storm Sewer Improvements

Village of Bethel, Clermont County, Ohio

Approximate Construction Estimate:
$296,000

Projected Bidding Timeframe:
Quarter 1, 2020 by Choice One

Project Funding:
OPWC

Western Row Road Improvements

Western Row Road Improvements

Warren County Transporation Improvement District, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 1, 2020 by Warren County Transporation Improvement District

Project Funding:
Local

Category:
Description

Western Row Road Improvements

Warren County Transporation Improvement District, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 1, 2020 by Warren County Transporation Improvement District

Project Funding:
Local

Crown and Victory Water Main Replacement

Crown and Victory Water Main Replacement

Montgomery County Environmental Services, Ohio

Approximate Construction Estimate:
$600,000

Projected Bidding Timeframe:
Quarter 1, 2020 by Montgomery County

Project Funding:
Local and OPWC

Category:
Description

Crown and Victory Water Main Replacement

Montgomery County Environmental Services, Ohio

Approximate Construction Estimate:
$600,000

Projected Bidding Timeframe:
Quarter 1, 2020 by Montgomery County

Project Funding:
Local and OPWC

Park Drainage Improvements

Park Drainage Improvements

Village of Russells Point, Logan County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 1, 2020 by Choice One

Project Funding:
Local

Category:
Description

Park Drainage Improvements

Village of Russells Point, Logan County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 1, 2020 by Choice One

Project Funding:
Local

Eintracht Park Sewer Extension

Eintracht Park Sewer Extension

City of Riverside, Montgomery County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 1, 2020 by Choice One

Project Funding:
Local

Category:
Description

Eintracht Park Sewer Extension

City of Riverside, Montgomery County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 1, 2020 by Choice One

Project Funding:
Local

Union Cemetery Road Sidewalk

Union Cemetery Road Sidewalk

Symmes Township, Hamilton County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 1, 2020 by Choice One

Project Funding:
Local

Category:
Description

Union Cemetery Road Sidewalk

Symmes Township, Hamilton County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 1, 2020 by Choice One

Project Funding:
Local

South Park Splash Pad

South Park Splash Pad

City of Greenville, Darke County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 1, 2020 by Choice One

Project Funding:
ODNR

Category:
Description

South Park Splash Pad

City of Greenville, Darke County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 1, 2020 by Choice One

Project Funding:
ODNR

Commerce Drive Extension

Commerce Drive Extension

Village of Botkins, Shelby County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 1, 2020 by Choice One

Project Funding:
Local

Category:
Description

Commerce Drive Extension

Village of Botkins, Shelby County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 1, 2020 by Choice One

Project Funding:
Local

2020 Paving Program

2020 Paving Program

Village of West Jefferson, Madison County, Ohio

Approximate Construction Estimate:
$200,000

Projected Bidding Timeframe:
Quarter 1, 2020 by Choice One

Project Funding:
Local

Category:
Description

2020 Paving Program

Village of West Jefferson, Madison County, Ohio

Approximate Construction Estimate:
$200,000

Projected Bidding Timeframe:
Quarter 1, 2020 by Choice One

Project Funding:
Local

Church Street Drainage Improvements

Church Street Drainage Improvements

City of Mason, Warren County, Ohio

Approximate Construction Estimate:
$200,000

Projected Bidding Timeframe:
Quarter 1, 2020 by City of Mason

Project Funding:
Local

Category:
Description

Church Street Drainage Improvements

City of Mason, Warren County, Ohio

Approximate Construction Estimate:
$200,000

Projected Bidding Timeframe:
Quarter 1, 2020 by City of Mason

Project Funding:
Local

Quarter 2, 2020

John Gray Road Sidewalk Improvements

John Gray Road Sidewalk Improvements

City of Fairfield, Butler County, Ohio

Approximate Construction Estimate:
$290,000

Projected Bidding Timeframe:
Quarter 2, 2020 by the City of Fairfield

Project Funding:
Local

Category:
Description

John Gray Road Sidewalk Improvements

City of Fairfield, Butler County, Ohio

Approximate Construction Estimate:
$290,000

Projected Bidding Timeframe:
Quarter 2, 2020 by the City of Fairfield

Project Funding:
Local

AUG-SRTS Wapak Infrastructure (PID 106131)

AUG-SRTS Wapak Infrastructure (PID 106131)

City of Wapakoneta, Auglaize County, Ohio

Approximate Construction Estimate:
$360,000

Projected Bidding Timeframe:
Quarter 2, 2020 by ODOT

Project Funding:
ODOT

Category:
Description

AUG-SRTS Wapak Infrastructure (PID 106131)

City of Wapakoneta, Auglaize County, Ohio

Approximate Construction Estimate:
$360,000

Projected Bidding Timeframe:
Quarter 2, 2020 by ODOT

Project Funding:
ODOT

Mason-Lebanon Bike Path Connector (PID 105175)

Mason-Lebanon Bike Path Connector (PID 105175)

City of Mason, Warren County, Ohio

Approximate Construction Estimate:
$625,000

Projected Bidding Timeframe:
Quarter 2, 2020 by City of Mason

Project Funding:
ODOT

Category:
Description

Mason-Lebanon Bike Path Connector (PID 105175)

City of Mason, Warren County, Ohio

Approximate Construction Estimate:
$625,000

Projected Bidding Timeframe:
Quarter 2, 2020 by City of Mason

Project Funding:
ODOT

Summit Street and Highland Avenue Reconstruction

Summit Street and Highland Avenue Reconstruction

City of Lebanon, Warren County, Ohio

Approximate Construction Estimate:
$2,000,000

Projected Bidding Timeframe:
Quarter 2, 2020 by City of Lebanon

Project Funding:
OPWC

Category:
Description

Summit Street and Highland Avenue Reconstruction

City of Lebanon, Warren County, Ohio

Approximate Construction Estimate:
$2,000,000

Projected Bidding Timeframe:
Quarter 2, 2020 by City of Lebanon

Project Funding:
OPWC

Yellow Springs-Fairfield Rd. Improvements (PID 101498)

Yellow Springs-Fairfield Rd. Improvements (PID 101498)

City of Fairborn, Greene County

Approximate Construction Estimate:
$2,500,000

Projected Bidding Timeframe:
Quarter 2, 2020 by ODOT

Project Funding:
ODOT/MVRPC STP Funds

Category:
Description

Yellow Springs-Fairfield Rd. Improvements (PID 101498)

City of Fairborn, Greene County

Approximate Construction Estimate:
$2,500,000

Projected Bidding Timeframe:
Quarter 2, 2020 by ODOT

Project Funding:
ODOT/MVRPC STP Funds

Greenback Rd. Reconstruction, Phase 1

Greenback Rd. Reconstruction, Phase 1

Village of Fort Loramie, Shelby County, Ohio

Approximate Construction Estimate:
$1,680,000

Projected Bidding Timeframe:
Quarter 2, 2020 by Choice One

Project Funding:
TBD

Category:
Description

Greenback Rd. Reconstruction, Phase 1

Village of Fort Loramie, Shelby County, Ohio

Approximate Construction Estimate:
$1,680,000

Projected Bidding Timeframe:
Quarter 2, 2020 by Choice One

Project Funding:
TBD

Quarter 3, 2020

South Elm Street Reconstruction

South Elm Street Reconstruction

Village of Port Jefferson, Shelby County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 3, 2020 by Choice One

Project Funding:
OPWC

Category:
Description

South Elm Street Reconstruction

Village of Port Jefferson, Shelby County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 3, 2020 by Choice One

Project Funding:
OPWC

Quarter 4, 2020

Lincoln Avenue Phase 3, PID 106438

Lincoln Avenue Phase 3, (PID 106438)

Village of Ada, Hardin County, Ohio

Approximate Construction Estimate:
$2,678,000

Projected Bidding Timeframe:
Quarter 4, 2020 by ODOT

Project Funding:
ODOT

Category:
Description

Lincoln Avenue Phase 3, (PID 106438)

Village of Ada, Hardin County, Ohio

Approximate Construction Estimate:
$2,678,000

Projected Bidding Timeframe:
Quarter 4, 2020 by ODOT

Project Funding:
ODOT

Quarter 1, 2021

MOT-E. Springfield Street Improvements

MOT-E. Springfield Street Improvements

City of Riverside, Montgomery County, Ohio

Approximate Construction Estimate:
$2,600,000

Projected Bidding Timeframe:
Quarter 1, 2021 by ODOT

Project Funding:
ODOT, MVRPC

Category:
Description

MOT-E. Springfield Street Improvements

City of Riverside, Montgomery County, Ohio

Approximate Construction Estimate:
$2,600,000

Projected Bidding Timeframe:
Quarter 1, 2021 by ODOT

Project Funding:
ODOT, MVRPC

SR4 and Micheal/Camelot Realignment

SR4 and Micheal/Camelot Realignment

City of Fairfield, Butler County, Ohio

Approximate Construction Estimate:
$1,500,000

Projected Bidding Timeframe:
Quarter 1, 2021 by City of Fairfield

Project Funding:
Safety – ODOT

Category:
Description

SR4 and Micheal/Camelot Realignment

City of Fairfield, Butler County, Ohio

Approximate Construction Estimate:
$1,500,000

Projected Bidding Timeframe:
Quarter 1, 2021 by City of Fairfield

Project Funding:
Safety – ODOT

New Street Reconstruction

New Street Reconstruction

City of Lebanon, Warren County, Ohio

Approximate Construction Estimate:
$1,300,000

Projected Bidding Timeframe:
Quarter 1, 2021 by City of Lebanon

Project Funding:
OPWC

Category:
Description

New Street Reconstruction

City of Lebanon, Warren County, Ohio

Approximate Construction Estimate:
$1,300,000

Projected Bidding Timeframe:
Quarter 1, 2021 by City of Lebanon

Project Funding:
OPWC

Quarter 2, 2021

PID 108705 Grill/Kear/Bonnewitz Rehabilitation

PID 108705 Grill/Kear/Bonnewitz Rehabilitation

City of Van Wert, Van Wert, Ohio

Approximate Construction Estimate:
$864,000

Projected Bidding Timeframe:
Quarter 2, 2021 by ODOT

Project Funding:
ODOT Small Cities

Category:
Description

PID 108705 Grill/Kear/Bonnewitz Rehabilitation

City of Van Wert, Van Wert, Ohio

Approximate Construction Estimate:
$864,000

Projected Bidding Timeframe:
Quarter 2, 2021 by ODOT

Project Funding:
ODOT Small Cities

Quarter 3, 2021

CLI-Blanchester SRTS FY 22

CLI-Blanchester SRTS FY 22

Village of Blanchester, Clinton County, Ohio

Approximate Construction Estimate:
$200,000

Projected Bidding Timeframe:
Quarter 3, 2021 by ODOT

Project Funding:
ODOT Safe Routes to School

Category:
Description

CLI-Blanchester SRTS FY 22

Village of Blanchester, Clinton County, Ohio

Approximate Construction Estimate:
$200,000

Projected Bidding Timeframe:
Quarter 3, 2021 by ODOT

Project Funding:
ODOT Safe Routes to School

Quarter 1, 2022

MOT-W. Springfield St. Reconstruction

MOT-W. Springfield St. Reconstruction

City of Riverside, Montgomery County, Ohio

Approximate Construction Estimate:
$2,000,000

Projected Bidding Timeframe:
Quarter 1, 2022 by ODOT

Project Funding:
ODOT

Category:
Description