La Luz Storm Improvements – Phase 2

La Luz Storm Improvements – Phase 2

City of Lebanon, Warren County, Ohio

Approximate Construction Estimate:
$125,000

Projected Bidding Timeframe:
Quarter 2, 2019 by City of Lebanon

Project Funding:
Local

Category:
Description

La Luz Storm Improvements – Phase 2

City of Lebanon, Warren County, Ohio

Approximate Construction Estimate:
$125,000

Projected Bidding Timeframe:
Quarter 2, 2019 by City of Lebanon

Project Funding:
Local

Traffic Signal Improvements

Traffic Signal Improvements

Village of New Bremen, Auglaize County, Ohio

Approximate Construction Estimate:
$1,000,000

Projected Bidding Timeframe:
Quarter 2, 2019 by Choice One

Project Funding:
Local

Category:
Description

Traffic Signal Improvements

Village of New Bremen, Auglaize County, Ohio

Approximate Construction Estimate:
$1,000,000

Projected Bidding Timeframe:
Quarter 2, 2019 by Choice One

Project Funding:
Local

Dave Avenue Reconstruction

Dave Avenue Reconstruction

City of Lebanon, Warren County, Ohio

Approximate Construction Estimate:
$500,000

Projected Bidding Timeframe:
Quarter 2, 2019 by the City of Lebanon

Project Funding:
OPWC

Category:
Description

Dave Avenue Reconstruction

City of Lebanon, Warren County, Ohio

Approximate Construction Estimate:
$500,000

Projected Bidding Timeframe:
Quarter 2, 2019 by the City of Lebanon

Project Funding:
OPWC

Lost Creek Restroom Site Plan

Lost Creek Restroom Site Plan

Miami County Park District, Ohio

Approximate Construction Estimate:
Unknown at this time.

Projected Bidding Timeframe:
Quarter 2, 2019 by Choice One

Project Funding:
Local

Category:
Description

Lost Creek Restroom Site Plan

Miami County Park District, Ohio

Approximate Construction Estimate:
Unknown at this time.

Projected Bidding Timeframe:
Quarter 2, 2019 by Choice One

Project Funding:
Local

MMM Road Reconstruction – Phase 1

MMM Road Reconstruction – Phase 1

Village of South Lebanon, Warren County, Ohio

Approximate Construction Estimate:
$800,000

Projected Bidding Timeframe:
Quarter 2, 2019 by Village of South Lebanon

Project Funding:
OPWC

Category:
Description

MMM Road Reconstruction – Phase 1

Village of South Lebanon, Warren County, Ohio

Approximate Construction Estimate:
$800,000

Projected Bidding Timeframe:
Quarter 2, 2019 by Village of South Lebanon

Project Funding:
OPWC

Remington Road (SR 126) Culvert Replacement

Remington Road (SR 126) Culvert Replacement

The City of the Village of Indian Hill, Hamilton County, Ohio

Approximate Construction Estimate:
$250,000

Projected Bidding Timeframe:
Quarter 2, 2019 by The City of the Village of Indian Hill

Project Funding:
OPWC

Category:
Description

Remington Road (SR 126) Culvert Replacement

The City of the Village of Indian Hill, Hamilton County, Ohio

Approximate Construction Estimate:
$250,000

Projected Bidding Timeframe:
Quarter 2, 2019 by The City of the Village of Indian Hill

Project Funding:
OPWC

Gay Street Reconstruction – Front to 4th

Gay Street Reconstruction – Front to 4th

Village of Williamsburg, Clermont County, Ohio

Approximate Construction Estimate:
$900,000

Projected Bidding Timeframe:
Quarter 2, 2019 by Choice One

Project Funding:
OPWC

Category:
Description

Gay Street Reconstruction – Front to 4th

Village of Williamsburg, Clermont County, Ohio

Approximate Construction Estimate:
$900,000

Projected Bidding Timeframe:
Quarter 2, 2019 by Choice One

Project Funding:
OPWC

Wagner Avenue Widening

Wagner Avenue Widening

City of Greenville, Darke County, Ohio

Approximate Construction Estimate:
$1,591,600

Projected Bidding Timeframe:
Quarter 2, 2019 by City of Greenville

Project Funding:
OPWC

Category:
Description

Wagner Avenue Widening

City of Greenville, Darke County, Ohio

Approximate Construction Estimate:
$1,591,600

Projected Bidding Timeframe:
Quarter 2, 2019 by City of Greenville

Project Funding:
OPWC

Ferncliff Cemetery Expansion

Ferncliff Cemetery Expansion

City of Springfield, Clark County, Ohio

Approximate Construction Estimate:
$400,000

Projected Bidding Timeframe:
Quarter 2, 2019 by Choice One

Project Funding:
Private

Category:
Description

Ferncliff Cemetery Expansion

City of Springfield, Clark County, Ohio

Approximate Construction Estimate:
$400,000

Projected Bidding Timeframe:
Quarter 2, 2019 by Choice One

Project Funding:
Private

Lift Station Replacement

Lift Station Replacement

Village of Pandora, Putnam County, Ohio

Approximate Construction Estimate:
$200,000

Projected Bidding Timeframe:
Quarter 2, 2019 by Choice One

Project Funding:
Local

Category:
Description

Lift Station Replacement

Village of Pandora, Putnam County, Ohio

Approximate Construction Estimate:
$200,000

Projected Bidding Timeframe:
Quarter 2, 2019 by Choice One

Project Funding:
Local

Basketball and Pickle Ball Courts

Basketball and Pickle Ball Courts

Village of Minster, Auglaize County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 4, 2018 by Choice One

Project Funding:
Local

Category:
Description

Basketball and Pickle Ball Courts

Village of Minster, Auglaize County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 2, 2019 by Choice One

Project Funding:
Local

Perry Street Reconstruction

Perry Street Reconstruction

City of Wapakoneta, Auglaize County, Ohio

Approximate Construction Estimate:
$1,900,000

Projected Bidding Timeframe:
Quarter 2, 2019 by Choice One

Project Funding:
OPWC

Category:
Description

Perry Street Reconstruction

City of Wapakoneta, Auglaize County, Ohio

Approximate Construction Estimate:
$1,900,000

Projected Bidding Timeframe:
Quarter 2, 2019 by Choice One

Project Funding:
OPWC

Salem Avenue (SR 49) & Hoke Road Intersection Improvements (MOT SR 49 8.47 – PID: 109114

Salem Avenue (SR 49) & Hoke Road Intersection Improvements (MOT SR 49 8.47 – PID: 109114)

City of Clayton, Montgomery County, Ohio

Approximate Construction Estimate:
$290,000

Projected Bidding Timeframe:
Quarter 2, 2019 by City – Local LET

Project Funding:
Safety – ODOT

Category:
Description

Salem Avenue (SR 49) & Hoke Road Intersection Improvements (MOT SR 49 8.47 – PID: 109114)

City of Clayton, Montgomery County, Ohio

Approximate Construction Estimate:
$290,000

Projected Bidding Timeframe:
Quarter 2, 2019 by City – Local LET

Project Funding:
Safety – ODOT

CDBG Critical Infrastructure, CDBG Neighborhood Revitalization

CDBG Critical Infrastructure, CDBG Neighborhood Revitalization

Logan County Commissioners, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 2, 2019 by CDC of Ohio

Project Funding:
CDBG

Category:
Description

CDBG Critical Infrastructure, CDBG Neighborhood Revitalization

Logan County Commissioners, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 2, 2019 by CDC of Ohio

Project Funding:
CDBG

Galewood Drive Reconstruction

Galewood Drive Reconstruction

City of New Carlisle, Clark County, Ohio

Approximate Construction Estimate:
$410,000

Projected Bidding Timeframe:
Quarter 2, 2019 by County

Project Funding:
CDBG

Category:
Description

Galewood Drive Reconstruction

City of New Carlisle, Clark County, Ohio

Approximate Construction Estimate:
$410,000

Projected Bidding Timeframe:
Quarter 2, 2019 by County

Project Funding:
CDBG

Downtown Sidewalk Replacement

Downtown Sidewalk Replacement

City of Greenville, Darke County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 2, 2019 by City

Project Funding:
Local and CDBG

Category:
Description

Downtown Sidewalk Replacement

City of Greenville, Darke County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 2, 2019 by City

Project Funding:
Local and CDBG

Bridle Road Sidewalk

Bridle Road Sidewalk

Anderson Township, Hamilton County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 2, 2019 by Hamilton County

Project Funding:
Local

Category:
Description

Bridle Road Sidewalk

Anderson Township, Hamilton County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 2, 2019 by Hamilton County

Project Funding:
Local

Jenny Lind Improvements

Jenny Lind Improvements

Village of Amelia, Clermont County, Ohio

Approximate Construction Estimate:
$270,000

Projected Bidding Timeframe:
Quarter 2, 2019 by Choice One

Project Funding:
OPWC

Category:
Description

Jenny Lind Improvements

Village of Amelia, Clermont County, Ohio

Approximate Construction Estimate:
$270,000

Projected Bidding Timeframe:
Quarter 2, 2019 by Choice One

Project Funding:
OPWC

Northwoods Blvd. Reconstruction Ph. I

Northwoods Blvd. Reconstruction Ph. I

City of Vandalia, Montgomery County, Ohio

Approximate Construction Estimate:
$1,080,000

Projected Bidding Timeframe:
Quarter 2, 2019 by City of Vandalia

Project Funding:
OPWC

Category:
Description

Northwoods Blvd. Reconstruction Ph. I

City of Vandalia, Montgomery County, Ohio

Approximate Construction Estimate:
$1,080,000

Projected Bidding Timeframe:
Quarter 2, 2019 by City of Vandalia

Project Funding:
OPWC

S. Broadway Greenville Creek Water Main Crossing

S. Broadway Greenville Creek Water Main Crossing

City of Greenville, Darke County, Ohio

Approximate Construction Estimate:
$202,450

Projected Bidding Timeframe:
Quarter 2, 2019 by City of Greenville

Project Funding:
Local

Category:
Description

Northwoods Blvd. Reconstruction Ph. I

City of Vandalia, Montgomery County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 2, 2019 by City of Vandalia

Project Funding:
OPWC

Fancy Street Water Main and Repaving

Fancy Street Water Main and Repaving

Village of Blanchester, Clinton County, Ohio

Approximate Construction Estimate:
$400,000

Projected Bidding Timeframe:
Quarter 2, 2019 by Clinton County

Project Funding:
CDBG

Category:
Description

Fancy Street Water Main and Repaving

Village of Blanchester, Clinton County, Ohio

Approximate Construction Estimate:
$400,000

Projected Bidding Timeframe:
Quarter 2, 2019 by Clinton County

Project Funding:
CDBG

Loveland-Miamiville Water Main

Loveland-Miamiville Water Main

City of Loveland, Clermont County, Ohio

Approximate Construction Estimate:
$600,000

Projected Bidding Timeframe:
Quarter 2, 2019 by Choice One

Project Funding:
OPWC

Category:
Description

Loveland-Miamiville Water Main

City of Loveland, Clermont County, Ohio

Approximate Construction Estimate:
$600,000

Projected Bidding Timeframe:
Quarter 2, 2019 by Choice One

Project Funding:
OPWC

Blong Road Bridge Replacement

Blong Road Bridge Replacement

Symmes Township, Hamilton County, Ohio

Approximate Construction Estimate:
$340,000

Projected Bidding Timeframe:
Quarter 2, 2019 by Choice One

Project Funding:
OPWC

Category:
Description

Blong Road Bridge Replacement

Symmes Township, Hamilton County, Ohio

Approximate Construction Estimate:
$340,000

Projected Bidding Timeframe:
Quarter 2, 2019 by Choice One

Project Funding:
OPWC

Seward Road Water Main Replacement

Seward Road Water Main Replacement

City of Fairfield, Butler County, Ohio

Approximate Construction Estimate:
$1,000,000

Projected Bidding Timeframe:
Quarter 2, 2019 by City of Fairfield

Project Funding:
Local

Category:
Description

Seward Road Water Main Replacement

City of Fairfield, Butler County, Ohio

Approximate Construction Estimate:
$1,000,000

Projected Bidding Timeframe:
Quarter 2, 2019 by City of Fairfield

Project Funding:
Local

Sanitary Sewer Extension

Sanitary Sewer Extension

City of Delphos, Allen County, Ohio

Approximate Construction Estimate:
$100,000

Projected Bidding Timeframe:
Quarter 2, 2019 by Choice One

Project Funding:
Local

Category:
Description

Sanitary Sewer Extension

City of Delphos, Allen County, Ohio

Approximate Construction Estimate:
$100,000

Projected Bidding Timeframe:
Quarter 2, 2019 by Choice One

Project Funding:
Local

2019 Concrete Street Repair

2019 Concrete Street Repair

City of Delphos, Allen County, Ohio

Approximate Construction Estimate:
$150,000

Projected Bidding Timeframe:
Quarter 2, 2019 by Choice One

Project Funding:
Local

Category:
Description

2019 Concrete Street Repair

City of Delphos, Allen County, Ohio

Approximate Construction Estimate:
$150,000

Projected Bidding Timeframe:
Quarter 2, 2019 by Choice One

Project Funding:
Local

Quarter 3, 2019

Main Street Traffic Signal Upgrades

Main Street Traffic Signal Upgrades

City of New Carlisle, Clark County, Ohio

Approximate Construction Estimate:
$515,000

Projected Bidding Timeframe:
Quarter 3, 2019 by ODOT

Project Funding:
ODOT, CMAQ

Category:
Description

Main Street Traffic Signal Upgrades

City of New Carlisle, Clark County, Ohio

Approximate Construction Estimate:
$515,000

Projected Bidding Timeframe:
Quarter 3, 2019 by ODOT

Project Funding:
ODOT, CMAQ

Village of Ludlow Falls Sanitary Sewer System

Village of Ludlow Falls Sanitary Sewer System

Village of Ludlow Falls, Miami County, Ohio

Approximate Construction Estimate:
$3,096.157

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
USACE, CDBG, OWDA

Category:
Description

Village of Ludlow Falls Sanitary Sewer System

Village of Ludlow Falls, Miami County, Ohio

Approximate Construction Estimate:
$3,096.157

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
USACE, CDBG, OWDA

Industrial Park Sanitary Sewer Extension

Industrial Park Sanitary Sewer Extension

Village of Hicksville, Defiance County, Ohio

Approximate Construction Estimate:
$750,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
Local

Category:
Description

Industrial Park Sanitary Sewer Extension

Village of Hicksville, Defiance County, Ohio

Approximate Construction Estimate:
$750,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
Local

State Route 49 Water Main Extension

State Route 49 Water Main Extension

Village of Hicksville, Defiance County, Ohio

Approximate Construction Estimate:
$450,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
Local

Category:
Description

State Route 49 Water Main Extension

Village of Hicksville, Defiance County, Ohio

Approximate Construction Estimate:
$450,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
Local

Middleport Well Vaults

Middleport Well Vaults

Village of Middleport, Meigs County, Ohio

Approximate Construction Estimate:
$75,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
Local

Category:
Description

Middleport Well Vaults

Village of Middleport, Meigs County, Ohio

Approximate Construction Estimate:
$75,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
Local

North End Sewer Separation

North End Sewer Separation

Village of Middleport, Meigs County, Ohio

Approximate Construction Estimate:
$2,100,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
OEPA Principal Forgiveness

Category:
Description

North End Sewer Separation

Village of Middleport, Meigs County, Ohio

Approximate Construction Estimate:
$2,100,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
OEPA Principal Forgiveness

Bethel-Tate Fire Department Parking Lot Improvements

Bethel-Tate Fire Department Parking Lot Improvements

Tate Township, Clermont County, Ohio

Approximate Construction Estimate:
$100,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Clermont County

Project Funding:
CDBG

Category:
Description

Bethel-Tate Fire Department Parking Lot Improvements

Tate Township, Clermont County, Ohio

Approximate Construction Estimate:
$100,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Clermont County

Project Funding:
CDBG

Spring Hill Road Reconstruction

Spring Hill Road Reconstruction

Village of Clarksville, Clinton County, Ohio

Approximate Construction Estimate:
$400,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
OPWC

Category:
Description

Spring Hill Road Reconstruction

Village of Clarksville, Clinton County, Ohio

Approximate Construction Estimate:
$400,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
OPWC

Cooper Farms Utility Extension

Cooper Farms Utility Extension

Village of Fort Recovery, Mercer County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
Local

Category:
Description

Cooper Farms Utility Extension

Village of Fort Recovery, Mercer County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
Local

Water Booster Pump

Water Booster Pump

Municipality of West Milton, Miami County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
OPWC

Category:
Description

Water Booster Pump

Municipality of West Milton, Miami County, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
OPWC

Manhole Chimney Reconstruction

Manhole Chimney Reconstruction

Village of Ada, Hardin County, Ohio

Approximate Construction Estimate:
$75,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
Local

Category:
Description

Manhole Chimney Reconstruction

Village of Ada, Hardin County, Ohio

Approximate Construction Estimate:
$75,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
Local

Beach Drive Storm Sewer

Beach Drive Storm Sewer

Village of Donnelsville, Clark County, Ohio

Approximate Construction Estimate:
$65,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Clark County

Project Funding:
CDBG

Category:
Description

Beach Drive Storm Sewer

Village of Donnelsville, Clark County, Ohio

Approximate Construction Estimate:
$65,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Clark County

Project Funding:
CDBG

Grant Park Bank Restoration

Grant Park Bank Restoration

Centerville Washington Park District, Montgomery County, Ohio

Approximate Construction Estimate:
$250,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
Local

Category:
Description

Grant Park Bank Restoration

Centerville Washington Park District, Montgomery County, Ohio

Approximate Construction Estimate:
$250,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Choice One

Project Funding:
Local

Hoffman Road Widening

Hoffman Road Widening

Miami Township, Clermont County

Approximate Construction Estimate:
$120,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Miami Township

Project Funding:
Local

Category:
Description

Hoffman Road Widening

Miami Township, Clermont County

Approximate Construction Estimate:
$120,000

Projected Bidding Timeframe:
Quarter 3, 2019 by Miami Township

Project Funding:
Local

Quarter 4, 2019

Gay Street Reconstruction Phase 2 – 4th to Railroad

Gay Street Reconstruction Phase 2 – 4th to Railroad

Village of Williamsburg, Clermont County, Ohio

Approximate Construction Estimate:
$700,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
OPWC

Category:
Description

Gay Street Reconstruction Phase 2 – 4th to Railroad

Village of Williamsburg, Clermont County, Ohio

Approximate Construction Estimate:
$700,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
OPWC

MOT Five Rivers Metro Parks (PID 101476)

MOT Five Rivers Metro Parks (PID 101476)

Five Rivers MetroParks

Approximate Construction Estimate:
$900,000

Projected Bidding Timeframe:
Quarter 4, 2019 by ODOT

Project Funding:
ODOT

Category:
Description

MOT Five Rivers Metro Parks (PID 101476)

Five Rivers MetroParks

Approximate Construction Estimate:
$900,000

Projected Bidding Timeframe:
Quarter 4, 2019 by ODOT

Project Funding:
ODOT

Kelley Nature Preserve Boat Ramp

Kelley Nature Preserve Boat Ramp

Miami Township, Clermont County, Ohio

Approximate Construction Estimate:
$80,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Miami Township

Project Funding:
Local

Category:
Description

Kelley Nature Preserve Boat Ramp

Miami Township, Clermont County, Ohio

Approximate Construction Estimate:
$80,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Miami Township

Project Funding:
Local

Murray Avenue Bike Trail (Settle to Plainville)

Murray Avenue Bike Trail (Settle to Plainville)

Village of Mariemont, Hamilton County, Ohio

Approximate Construction Estimate:
$350,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
ODNR-Clean Ohio Trails

Category:
Description

Murray Avenue Bike Trail (Settle to Plainville)

Village of Mariemont, Hamilton County, Ohio

Approximate Construction Estimate:
$350,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
ODNR-Clean Ohio Trails

Chapel Road Sidewalk

Chapel Road Sidewalk

Village of Amelia, Clermont County, Ohio

Approximate Construction Estimate:
$90,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Clermont County

Project Funding:
CDBG

Category:
Description

Chapel Road Sidewalk

Village of Amelia, Clermont County, Ohio

Approximate Construction Estimate:
$90,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Clermont County

Project Funding:
CDBG

Airstream Traffic Signal

Airstream Traffic Signal

Village of Jackson Center, Shelby County, Ohio

Approximate Construction Estimate:
$200,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
Local, Jobs and Commerce

Category:
Description

Airstream Traffic Signal

Village of Jackson Center, Shelby County, Ohio

Approximate Construction Estimate:
$200,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
Local, Jobs and Commerce

South Street Reconstruction – Phase 1

South Street Reconstruction – Phase 1

Village of Anna, Shelby County, Ohio

Approximate Construction Estimate:
$520,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
OPWC

Category:
Description

South Street Reconstruction – Phase 1

Village of Anna, Shelby County, Ohio

Approximate Construction Estimate:
$520,000

Projected Bidding Timeframe:
Quarter 4, 2019 by Choice One

Project Funding:
OPWC

Quarter 1, 2020

Broadway Street Improvements

Broadway Street Improvements

Village of Fort Recovery, Mercer County, Ohio

Approximate Construction Estimate:
$1,500,000

Projected Bidding Timeframe:
Quarter 1, 2020 by Choice One

Project Funding:
OPWC, CDBG, LOCAL

Category:
Description

Broadway Street Improvements

Village of Fort Recovery, Mercer County, Ohio

Approximate Construction Estimate:
$1,500,000

Projected Bidding Timeframe:
Quarter 1, 2020 by Choice One

Project Funding:
OPWC, CDBG, LOCAL

Green Street Bridge 523 Replacement

Green Street Bridge 523 Replacement

Wayne County Engineer, Indiana

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 1, 2020 by Wayne County

Project Funding:
Local/CCMG

Category:
Description

Green Street Bridge 523 Replacement

Wayne County Engineer, Indiana

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 1, 2020 by Wayne County

Project Funding:
Local/CCMG

Jefferson Street Reconstruction – Phase 2

Jefferson Street Reconstruction – Phase 2

Village of Bluffton, Allen County, Ohio

Approximate Construction Estimate:
$845,000

Projected Bidding Timeframe:
Quarter 1, 2020 by Choice One

Project Funding:
OPWC

Category:
Description

Jefferson Street Reconstruction – Phase 2

Village of Bluffton, Allen County, Ohio

Approximate Construction Estimate:
$845,000

Projected Bidding Timeframe:
Quarter 1, 2020 by Choice One

Project Funding:
OPWC

Lewistown Sanitary Sewer

Lewistown Sanitary Sewer

Logan County Water Pollution Control District

Approximate Construction Estimate:
$3,000,000

Projected Bidding Timeframe:
Quarter 1, 2020 by Choice One

Project Funding:
USACE, OWDA, local

Category:
Description

Lewistown Sanitary Sewer

Logan County Water Pollution Control District

Approximate Construction Estimate:
$3,000,000

Projected Bidding Timeframe:
Quarter 1, 2020 by Choice One

Project Funding:
USACE, OWDA, local

Quarter 2, 2020

John Gray Road Sidewalk Improvements

John Gray Road Sidewalk Improvements

City of Fairfield, Butler County, Ohio

Approximate Construction Estimate:
$290,000

Projected Bidding Timeframe:
Quarter 2, 2020 by the City of Fairfield

Project Funding:
Local

Category:
Description

John Gray Road Sidewalk Improvements

City of Fairfield, Butler County, Ohio

Approximate Construction Estimate:
$290,000

Projected Bidding Timeframe:
Quarter 2, 2020 by the City of Fairfield

Project Funding:
Local

AUG-SRTS Wapak Infrastructure (PID 106131)

AUG-SRTS Wapak Infrastructure (PID 106131)

City of Wapakoneta, Auglaize County, Ohio

Approximate Construction Estimate:
$360,000

Projected Bidding Timeframe:
Quarter 2, 2020 by ODOT

Project Funding:
ODOT

Category:
Description

AUG-SRTS Wapak Infrastructure (PID 106131)

City of Wapakoneta, Auglaize County, Ohio

Approximate Construction Estimate:
$360,000

Projected Bidding Timeframe:
Quarter 2, 2020 by ODOT

Project Funding:
ODOT

Mason-Lebanon Bike Path Connector (PID 105175)

Mason-Lebanon Bike Path Connector (PID 105175)

City of Mason, Warren County, Ohio

Approximate Construction Estimate:
$625,000

Projected Bidding Timeframe:
Quarter 2, 2020 by City of Mason

Project Funding:
ODOT

Category:
Description

Mason-Lebanon Bike Path Connector (PID 105175)

City of Mason, Warren County, Ohio

Approximate Construction Estimate:
$625,000

Projected Bidding Timeframe:
Quarter 2, 2020 by City of Mason

Project Funding:
ODOT

Summit Street and Highland Avenue Reconstruction

Summit Street and Highland Avenue Reconstruction

City of Lebanon, Warren County, Ohio

Approximate Construction Estimate:
$2,000,000

Projected Bidding Timeframe:
Quarter 2, 2020 by City of Lebanon

Project Funding:
OPWC

Category:
Description

Summit Street and Highland Avenue Reconstruction

City of Lebanon, Warren County, Ohio

Approximate Construction Estimate:
$2,000,000

Projected Bidding Timeframe:
Quarter 2, 2020 by City of Lebanon

Project Funding:
OPWC

Yellow Springs-Fairfield Rd. Improvements (PID 101498)

Yellow Springs-Fairfield Rd. Improvements (PID 101498)

City of Fairborn, Greene County

Approximate Construction Estimate:
$2,500,000

Projected Bidding Timeframe:
Quarter 2, 2020 by ODOT

Project Funding:
ODOT/MVRPC STP Funds

Category:
Description

Yellow Springs-Fairfield Rd. Improvements (PID 101498)

City of Fairborn, Greene County

Approximate Construction Estimate:
$2,500,000

Projected Bidding Timeframe:
Quarter 2, 2020 by ODOT

Project Funding:
ODOT/MVRPC STP Funds

Greenback Rd. Reconstruction, Phase 1

Greenback Rd. Reconstruction, Phase 1

Village of Fort Loramie, Shelby County, Ohio

Approximate Construction Estimate:
$1,680,000

Projected Bidding Timeframe:
Quarter 2, 2020 by Choice One

Project Funding:
TBD

Category:
Description

Greenback Rd. Reconstruction, Phase 1

Village of Fort Loramie, Shelby County, Ohio

Approximate Construction Estimate:
$1,680,000

Projected Bidding Timeframe:
Quarter 2, 2020 by Choice One

Project Funding:
TBD

Quarter 4, 2020

Lincoln Avenue Phase 3, PID 106438

Lincoln Avenue Phase 3, (PID 106438)

Village of Ada, Hardin County, Ohio

Approximate Construction Estimate:
$2,678,000

Projected Bidding Timeframe:
Quarter 4, 2020 by ODOT

Project Funding:
ODOT

Category:
Description

Lincoln Avenue Phase 3, (PID 106438)

Village of Ada, Hardin County, Ohio

Approximate Construction Estimate:
$2,678,000

Projected Bidding Timeframe:
Quarter 4, 2020 by ODOT

Project Funding:
ODOT

Quarter 1, 2021

MOT-E. Springfield Street Improvements

MOT-E. Springfield Street Improvements

City of Riverside, Montgomery County, Ohio

Approximate Construction Estimate:
$2,600,000

Projected Bidding Timeframe:
Quarter 1, 2021 by ODOT

Project Funding:
ODOT, MVRPC

Category:
Description

MOT-E. Springfield Street Improvements

City of Riverside, Montgomery County, Ohio

Approximate Construction Estimate:
$2,600,000

Projected Bidding Timeframe:
Quarter 1, 2021 by ODOT

Project Funding:
ODOT, MVRPC

SR4 and Micheal/Camelot Realignment

SR4 and Micheal/Camelot Realignment

City of Fairfield, Butler County, Ohio

Approximate Construction Estimate:
$1,500,000

Projected Bidding Timeframe:
Quarter 1, 2021 by City of Fairfield

Project Funding:
Safety – ODOT

Category:
Description

SR4 and Micheal/Camelot Realignment

City of Fairfield, Butler County, Ohio

Approximate Construction Estimate:
$1,500,000

Projected Bidding Timeframe:
Quarter 1, 2021 by City of Fairfield

Project Funding:
Safety – ODOT