2024 Miami County Bridge Package

 

Miami County Engineer, Ohio

 
 

Approximate Construction Estimate:
$1,700,000

 

Projected Bidding Timeframe:
Quarter 1, 2025 by Miami County Engineers Office

 

Project Funding:
Local

 

504 W. Euclid Avenue Demolition Specifications

 

Clark County Land Reutilization Corporation, Ohio

 
 

Approximate Construction Estimate:
Unknown at this time

 

Projected Bidding Timeframe:
Quarter 1, 2025 by Clark County Land Reutilization Corporation

 

Project Funding:
Local

 

Barricade System Bidding

 

Village of Yellow Springs, Greene County, Ohio

 
 

Approximate Construction Estimate:
$95,000

 

Projected Bidding Timeframe:
Quarter 1, 2025 by Choice One

 

Project Funding:
EMA

 

Belle Center Pump Station Reconstruction

 

Logan County Sewer District, Ohio

 
 

Approximate Construction Estimate:
$700,000

 

Projected Bidding Timeframe:
Quarter 1, 2025 by Choice One

 

Project Funding:
OEPA

 

Blosser Street Reconstruction Phase 4

 

Village of New Lebanon, Montgomery County, Ohio

 
 

Approximate Construction Estimate:
$499,900

 

Projected Bidding Timeframe:
Quarter 1, 2025 by Choice One

 

Project Funding:
OPWC

 

Clepper Park Water Main Extension

 

Union Township, Clermont County, Ohio

 
 

Approximate Construction Estimate:
$550,000

 

Projected Bidding Timeframe:
Quarter 1, 2025 by Choice One

 

Project Funding:
Local

 

Depot Street Storm Improvements

 

Village of West Jefferson, Madison County, Ohio

 
 

Approximate Construction Estimate:
Unknown at this time

 

Projected Bidding Timeframe:
Quarter 1, 2025 by Choice One

 

Project Funding:
Local

 

Detroit Street Reconstruction Phase 1

 

City of Kenton, Hardin County, Ohio

 
 

Approximate Construction Estimate:
$3,996,400

 

Projected Bidding Timeframe:
Quarter 1, 2025 by ODOT

 

Project Funding:
Small Cities

 

East Elm Street CDBG Improvements

 

Village of Sabina, Clinton County, Ohio

 
 

Approximate Construction Estimate:
$500,000

 

Projected Bidding Timeframe:
Quarter 1, 2025 by CDC of Ohio

 

Project Funding:
CDBG Critical Infrastructure

 

Exporting Street Improvements

 

City of Aurora, Dearborn County, Indiana

 
 

Approximate Construction Estimate:
$527,000

 

Projected Bidding Timeframe:
Quarter 1, 2025 by Choice One

 

Project Funding:
CCMG

 

Foraker Avenue Water and Sewer Replacement

 

City of Sidney, Shelby County, Ohio

 
 

Approximate Construction Estimate:
Unknown at this time

 

Projected Bidding Timeframe:
Quarter 1, 2025 by City of Sidney

 

Project Funding:
Local

 

HAM-CR-266-14.97 Sidewalk (PID 117220)

 

Sycamore Township, Hamilton County, Ohio

 
 

Approximate Construction Estimate:
$1,200,000

 

Projected Bidding Timeframe:
Quarter 1, 2025 by Choice One

 

Project Funding:
ODOT Systemic Safety

 

Industrial Park Expansion

 

Village of Fort Loramie, Shelby County, Ohio

 
 

Approximate Construction Estimate:
$803,000

 

Projected Bidding Timeframe:
Quarter 1, 2025 by Choice One

 

Project Funding:
Ohio Capital Budget

 

Industrial Park Water System Improvements – Contract A (Water Main Extension)

 

City of Wapakoneta, Auglaize County, Ohio

 
 

Approximate Construction Estimate:
$3,000,000

 

Projected Bidding Timeframe:
Quarter 1, 2025 by Choice One

 

Project Funding:
WRSLA

 

Industrial Park Water System Improvements – Contract B (New Water Tower)

 

City of Wapakoneta, Auglaize County, Ohio

 
 

Approximate Construction Estimate:
$12,000,000

 

Projected Bidding Timeframe:
Quarter 1, 2025 by Choice One

 

Project Funding:
WRSLA

 

Industrial Park Water Tower and North Water Tower Improvements

 

City of Greenville, Darke County, Ohio

 
 

Approximate Construction Estimate:
$10,000,000

 

Projected Bidding Timeframe:
Quarter 1, 2025 by Choice One

 

Project Funding:
WRSLA

 

Interstate 75 Waterline Crossing Project

 

Warren County Water and Sewer Department

 
 

Approximate Construction Estimate:
$5,000,000

 

Projected Bidding Timeframe:
Quarter 1, 2025 by Warren County

 

Project Funding:
Local

 

King Ave Repaving

 

City of South Lebanon, Warren County, Ohio

 
 

Approximate Construction Estimate:
$150,000

 

Projected Bidding Timeframe:
Quarter 1, 2025 by City

 

Project Funding:
CDBG

 

Lazenby Street Water Main Replacement

 

Village of Blanchester, Clinton County, Ohio

 
 

Approximate Construction Estimate:
$450,000

 

Projected Bidding Timeframe:
Quarter 1, 2025 by Choice One

 

Project Funding:
OPWC and WWIG

 

MOT-Woodman Dr. Reconstruction (PID 115003)

 

City of Riverside, Montgomery County, Ohio

 
 

Approximate Construction Estimate:
$6,381,000

 

Projected Bidding Timeframe:
Quarter 1, 2025 by ODOT

 

Project Funding:
ODOT STP

 

Main Street Pump Station Rehabilitation

 

Village of Russia, Shelby County, Ohio

 
 

Approximate Construction Estimate:
$450,000

 

Projected Bidding Timeframe:
Quarter 1, 2025 by Choice One

 

Project Funding:
WIGG / HB 33

 

Market Street Sanitary Sewer Extension

 

City of Brookville, Montgomery County, Ohio

 
 

Approximate Construction Estimate:
$1,100,000

 

Projected Bidding Timeframe:
Quarter 1, 2025 by Choice One

 

Project Funding:
WPCLF

 

Mason Morrow Road Pressure Reducing Valve Pit

 

City of South Lebanon, Warren County, Ohio

 
 

Approximate Construction Estimate:
$200,000

 

Projected Bidding Timeframe:
Quarter 1, 2025 by Choice One

 

Project Funding:
Local

 

Morrow Road Reconstruction

 

City of South Lebanon, Warren County, Ohio

 
 

Approximate Construction Estimate:
$960,000

 

Projected Bidding Timeframe:
Quarter 1, 2025 by Choice One

 

Project Funding:
OPWC

 

Mt. Orab Sewer Study and Lift Station #2 Improvements

 

Village of Mount Orab, Brown County, Ohio

 
 

Approximate Construction Estimate:
$1,000,000

 

Projected Bidding Timeframe:
Quarter 1, 2025 by Choice One

 

Project Funding:
EPA WPCLF

 

Neighborhood Revitalization CDBG

 

City of Wilmington, Clinton County, Ohio

 
 

Approximate Construction Estimate:
$500,000

 

Projected Bidding Timeframe:
Quarter 1, 2025 by City

 

Project Funding:
CDBG

 

Orchard View and Orchard Circle Water, Storm, Sanitary, and Street Improvements, Phase 2

 

Village of Blanchester, Clinton County, Ohio

 
 

Approximate Construction Estimate:
$750,000

 

Projected Bidding Timeframe:
Quarter 1, 2025 by Choice One

 

Project Funding:
OPWC and WWIG

 

Park Residential Subdivision

 

Village of Columbus Grove, Putnam County, Ohio

 
 

Approximate Construction Estimate:
Unknown at this time

 

Projected Bidding Timeframe:
Quarter 1, 2025 by Choice One

 

Project Funding:
Local

 

Pleasant Avenue Water Main Replacement

 

City of Fairfield, Butler County, Ohio

 
 

Approximate Construction Estimate:
$1,500,000

 

Projected Bidding Timeframe:
Quarter 1, 2025 by City of Fairfield

 

Project Funding:
Local

 

Rio and Karen Water Main Replacement

 

Montgomery County Environmental Services, Ohio

 
 

Approximate Construction Estimate:
$450,000

 

Projected Bidding Timeframe:
Quarter 1, 2025 by Montgomery County

 

Project Funding:
OPWC and Local

 

S. Main St. Water Extension to Shafer Oil

 

Village of Ft. Loramie, Shelby County, Ohio

 
 

Approximate Construction Estimate:
$300,000

 

Projected Bidding Timeframe:
Quarter 1, 2025 by Choice One

 

Project Funding:
Local

 

S.R. 103 at Navajo Intersection Improvement

 

Village of Bluffton, Hancock County, Ohio

 
 

Approximate Construction Estimate:
$2,200,000

 

Projected Bidding Timeframe:
Quarter 1, 2025 by Choice One

 

Project Funding:
OPWC & Jobs Ohio

 

Sidewalk Replacement Program

 

Village of Ada, Hardin County, Ohio

 
 

Approximate Construction Estimate:
Unknown at this time

 

Projected Bidding Timeframe:
Quarter 1, 2025 by Choice One

 

Project Funding:
CDBG

 

Springdale Road Sidewalk (PID 117209)

 

Colerain Township, Hamilton County, Ohio

 
 

Approximate Construction Estimate:
$1,100,000

 

Projected Bidding Timeframe:
Quarter 1, 2025 by ODOT

 

Project Funding:
Transportation Alternatives

 

Stewart Subdivision Water and Sewer Replacement, Phase 1

 

City of Sidney, Shelby County, Ohio

 
 

Approximate Construction Estimate:
$1,800,000

 

Projected Bidding Timeframe:
Quarter 1, 2025 by City of Sidney

 

Project Funding:
Local

 

Sunray, Frieda, and Ives Water Main Replacement

 

Montgomery County Environmental Services

 
 

Approximate Construction Estimate:
$1,300,000

 

Projected Bidding Timeframe:
Quarter 1, 2025 by Montgomery County

 

Project Funding:
OPWC

 

Water Pump House Improvements Bidding

 

City of New Carlisle, Clark County, Ohio

 
 

Approximate Construction Estimate:
Unknown at this time

 

Projected Bidding Timeframe:
Quarter 1, 2025 by Choice One

 

Project Funding:
Local

 

Water Tower Replacement

 

Village of Ansonia, Darke County, Ohio

 
 

Approximate Construction Estimate:
$1,500,000

 

Projected Bidding Timeframe:
Quarter 1, 2025 by Choice One

 

Project Funding:
Ohio DOD WWIG, OPWC

 

Wolfangel and Clough Sidewalks

 

Anderson Township, Hamilton County, Ohio

 
 

Approximate Construction Estimate:
$480,000

 

Projected Bidding Timeframe:
Quarter 1, 2025 by Anderson Township

 

Project Funding:
Local

 

Quarter 2, 2025

Arrowhead Drive Water Main Replacement

 

City of Sidney, Shelby County, Ohio

 
 

Approximate Construction Estimate:
$575,000

 

Projected Bidding Timeframe:
Quarter 2, 2025 by City of Sidney

 

Project Funding:
Local

 

Buckeye Avenue Sanitary Sewer Improvements

 

City of Sidney, Shelby County, Ohio

 
 

Approximate Construction Estimate:
$650,000

 

Projected Bidding Timeframe:
Quarter 2, 2025 by City of Sidney

 

Project Funding:
Local

 

CLA-Little Miami Scenic Trail (PID116105)

 

Clark County Park District, Ohio

 
 

Approximate Construction Estimate:
$150,000

 

Projected Bidding Timeframe:
Quarter 2, 2025 by ODOT

 

Project Funding:
ODOT

 

Community Center Parking Lot Upgrades

 

Colerain Township, Hamilton County, Ohio

 
 

Approximate Construction Estimate:
$200,000

 

Projected Bidding Timeframe:
Quarter 2, 2025 by Choice One

 

Project Funding:
Local

 

Elm Street Improvements

 

Village of Ft. Loramie, Shelby County, Ohio

 
 

Approximate Construction Estimate:
$2,470,000

 

Projected Bidding Timeframe:
Quarter 2, 2025 by Choice One

 

Project Funding:
OPWC

 

Fields Ertel Sidewalk

 

Symmes Township, Hamilton County, Ohio

 
 

Approximate Construction Estimate:
$1,015,000

 

Projected Bidding Timeframe:
Quarter 2, 2025 by Choice One

 

Project Funding:
SORTA

 

Gibson & Belfast Repaving

 

Goshen Township, Clermont County, Ohio

 
 

Approximate Construction Estimate:
$1,100,000

 

Projected Bidding Timeframe:
Quarter 2, 2025 by Choice One

 

Project Funding:
OPWC

 

Green Vista Drive Storm Sewer Extension

 

Village of Enon, Clark County, Ohio

 
 

Approximate Construction Estimate:
$400,000

 

Projected Bidding Timeframe:
Quarter 2, 2025 by Choice One

 

Project Funding:
Local

 

Herold Road Water Main Extension

 

Clermont County Water Resources Department

 
 

Approximate Construction Estimate:
$1,800,000

 

Projected Bidding Timeframe:
Quarter 2, 2025 by Clermont County

 

Project Funding:
Local

 

Indiana Avenue Improvements

 

City of St. Marys, Auglaize County, Ohio

 
 

Approximate Construction Estimate:
$1,677,500

 

Projected Bidding Timeframe:
Quarter 2, 2025 by ODOT

 

Project Funding:
ODOT Safety

 

Loveland-Miamiville Road Phase 3 Construction Plans

 

City of Loveland, Clermont County, Ohio

 
 

Approximate Construction Estimate:
$725,000

 

Projected Bidding Timeframe:
Quarter 2, 2025 by Choice One

 

Project Funding:
Local

 

Maple Street Improvements

 

Village of Harveysburg, Warren County, Ohio

 
 

Approximate Construction Estimate:
Unknown at this time

 

Projected Bidding Timeframe:
Quarter 2, 2025 by Choice One

 

Project Funding:
OPWC

 

Mifflin Sanitary Sewer

 

Village of Mifflin, Ashland County, Ohio

 
 

Approximate Construction Estimate:
$500,000

 

Projected Bidding Timeframe:
Quarter 2, 2025 by Choice One

 

Project Funding:
ARPA

 

Ninth Street Sanitary Rehabilitation

 

City of Delphos, Allen County, Ohio

 
 

Approximate Construction Estimate:
$827,000

 

Projected Bidding Timeframe:
Quarter 2, 2025 by Choice One

 

Project Funding:
WSRLA

 

North Main and Bennington Sewer and Water Relocation

 

Montgomery County Environmental Services, Ohio

 
 

Approximate Construction Estimate:
$650,000

 

Projected Bidding Timeframe:
Quarter 2, 2025 by Montgomery County

 

Project Funding:
Local

 

Old North Dayton Trail Segment 2

 

Miami Conservancy District

 
 

Approximate Construction Estimate:
$1,000,000

 

Projected Bidding Timeframe:
Quarter 2, 2025 by ODOT

 

Project Funding:
ODOT

 

Poole Road Sidewalk (PID 119068)

 

Colerain Township, Hamilton County, Ohio

 
 

Approximate Construction Estimate:
$400,000

 

Projected Bidding Timeframe:
Quarter 2, 2025 by ODOT

 

Project Funding:
Local

 

Powell Road Realignment

 

City of Huber Heights, Montgomery County, Ohio

 
 

Approximate Construction Estimate:
$600,000

 

Projected Bidding Timeframe:
Quarter 2, 2025 by City of Huber Heights

 

Project Funding:
Local & OPWC

 

Robb Street Reconstruction

 

Village of Jackson Center, Shelby County, Ohio

 
 

Approximate Construction Estimate:
$1,000,000

 

Projected Bidding Timeframe:
Quarter 2, 2025 by Choice One

 

Project Funding:
Local

 

SR 276 Water Main Replacement

 

Clermont County Water Resources Department, Ohio

 
 

Approximate Construction Estimate:
$1,800,000

 

Projected Bidding Timeframe:
Quarter 2, 2025 by Clermont

 

Project Funding:
Local

 

Sanitary Sewer Trunk Line Replacement Phase 1

 

City of Kenton, Hardin County, Ohio

 
 

Approximate Construction Estimate:
$732,000

 

Projected Bidding Timeframe:
Quarter 2, 2025 by Choice One

 

Project Funding:
OEPA & OPWC

 

Tocsin Sanitary Sewer Improvements

 

Wells County, Indiana

 
 

Approximate Construction Estimate:
$4,200,000

 

Projected Bidding Timeframe:
Quarter 2, 2025 by Choice One

 

Project Funding:
SRF - WWSRF

 

Quarter 3, 2025

Cornell Road Improvements

 

City of Sharonville, Hamilton County, Ohio

 
 

Approximate Construction Estimate:
$1,300,000

 

Projected Bidding Timeframe:
Quarter 3, 2025 by Choice One

 

Project Funding:
SORTA

 

Hamilton Street Resurfacing and Post Office Improvements

 

Village of Chilo, Clermont County, Ohio

 
 

Approximate Construction Estimate:
$127,500

 

Projected Bidding Timeframe:
Quarter 3, 2025 by Choice One

 

Project Funding:
CDBG

 

Hoge Street Reconstruction

 

Village of New Knoxville, Auglaize County, Ohio

 
 

Approximate Construction Estimate:
Unknown at this time

 

Projected Bidding Timeframe:
Quarter 3, 2025 by Choice One

 

Project Funding:
OPWC

 

Leesburg Park Improvements

 

Board of Commissioners of Ross County, Ohio

 
 

Approximate Construction Estimate:
Unknown at this time

 

Projected Bidding Timeframe:
Quarter 3, 2025 by Choice One

 

Project Funding:
ACGP through ARPA

 

PUT Ottawa Pedestrian Improvements (PID: 119793)

 

Village of Ottawa, Putnam County, Ohio

 
 

Approximate Construction Estimate:
$290,000

 

Projected Bidding Timeframe:
Quarter 3, 2025 by ODOT

 

Project Funding:
Systemic Safety Funding

 

Ruth Cramton Park Improvements (Lynchburg)

 

Board of Commissioners of Ross County, Ohio

 
 

Approximate Construction Estimate:
Unknown at this time

 

Projected Bidding Timeframe:
Quarter 3, 2025 by Choice One

 

Project Funding:
ACGP through ARPA

 

Second Street Storm Sewer Improvements

 

Village of Ottoville, Putnam County, Ohio

 
 

Approximate Construction Estimate:
$645,000

 

Projected Bidding Timeframe:
Quarter 3, 2025 by Choice One

 

Project Funding:
OPWC

 

Quarter 4, 2025

2025-2030 Water Main Replacement Program

 

City of Huber Heights, Montgomery County, Ohio

 
 

Approximate Construction Estimate:
$3,500,000

 

Projected Bidding Timeframe:
Quarter 4, 2025 by City of Huber Heights

 

Project Funding:
Local

 

Cedar Lane and Crescent Court Reconstruction

 

City of Lebanon, Warren County, Ohio

 
 

Approximate Construction Estimate:
Unknown at this time

 

Projected Bidding Timeframe:
Quarter 4, 2025 by City of Lebanon

 

Project Funding:
Local

 

School & Solzman Sidewalk (PID 119074)

 

Sycamore Township, Hamilton County, Ohio

 
 

Approximate Construction Estimate:
$1,250,000

 

Projected Bidding Timeframe:
Quarter 4, 2025 by Choice One

 

Project Funding:
ODOT Transportation Alternatives

 

Quarter 1, 2026

ALL-Cable Road Improvements, PID: 112573

 

City of Lima, Allen County, Ohio

 
 

Approximate Construction Estimate:
$4,955,000

 

Projected Bidding Timeframe:
Quarter 1, 2026 by ODOT

 

Project Funding:
ODOT Safety

 

Keller Street Improvements

 

Town of Monroe, Adams County, Indiana

 
 

Approximate Construction Estimate:
Unknown at this time

 

Projected Bidding Timeframe:
Quarter 1, 2026 by Choice One

 

Project Funding:
CCMG

 

MER-Ft. Recovery Sidewalks, PID 117201

 

Village of Fort Recovery, Mercer County, Ohio

 
 

Approximate Construction Estimate:
$1,082,500

 

Projected Bidding Timeframe:
Quarter 1, 2026 by ODOT

 

Project Funding:
ODOT Safety Funding

 

MOT-GMR Trail Renovations PID 115197

 

Five Rivers MetroParks, Montgomery County, Ohio

 
 

Approximate Construction Estimate:
$415,000

 

Projected Bidding Timeframe:
Quarter 1, 2026 by ODOT

 

Project Funding:
ODOT

 

N. Maple St. Reconstruction, Phase 2 (PID 118523)

 

City of Eaton, Preble County, Ohio

 
 

Approximate Construction Estimate:
$2,500,000

 

Projected Bidding Timeframe:
Quarter 1, 2026 by ODOT

 

Project Funding:
ODOT Small Cities

 

VAN Bonnewitz Avenue Signal (PID: 120039)

 

City of Van Wert, Ohio

 
 

Approximate Construction Estimate:
$735,000

 

Projected Bidding Timeframe:
Quarter 1, 2026 by Choice One

 

Project Funding:
Small Cities Congestion Mitigation

 

WYA-Carey Safe Routes To School Phase 2, PID 119988

 

Village of Carey, Wyandot County, Ohio

 
 

Approximate Construction Estimate:
$320,000

 

Projected Bidding Timeframe:
Quarter 1, 2026 by ODOT

 

Project Funding:
ODOT Safe Routes To School

 

Westbrook Road Resurfacing (MOT Westbrook RSF 03.11, PID: 119353)

 

City of Brookville, Montgomery County, Ohio

 
 

Approximate Construction Estimate:
$595,000

 

Projected Bidding Timeframe:
Quarter 1, 2026 by ODOT

 

Project Funding:
MVRPC STP

 

Quarter 2, 2026

HAR-US 68/SR 31 Roundabout (PID: 121008)

 

City of Kenton, Hardin County, Ohio

 
 

Approximate Construction Estimate:
$5,500,000

 

Projected Bidding Timeframe:
Quarter 2, 2026 by ODOT

 

Project Funding:
Small Cities Congestion Mitigation

 

MCD ADA Trail Improvement Project (PID 119384)

 

Miami Conservancy District, Ohio

 
 

Approximate Construction Estimate:
$300,000

 

Projected Bidding Timeframe:
Quarter 2, 2026 by ODOT

 

Project Funding:
ODOT