Site Development

From purchase to punchlist, we can help you develop the next branch of your business or the addition to your plant. We understand the ins and outs of site development that sometimes hang up the process—permitting, zoning, storm water, municipal review etc.—and help to mitigate roadblocks before they happen.

Contact Us

LandDev_StormPollutionPrev

Storm Water Pollution Prevention Plan (SWPPP):

  • A plan prepared for the management of storm water runoff on a site during construction, and the prevention of the movement of sediment off the construction site.
Grants_OhioPublicWorks

Water and Sanitary Service Layout:

  • Analyzation of existing conditions and design of new facilities for water distribution and sanitary sewer collection to and on a site, including general layout, pipe sizing, and cost estimates.
SiteDev_GradingPlan-01

Grading Plan:

  • Design developed to address slopes and elevations of a site for efficient drainage and grade site for development.
LandDev_UtilityDesign

Utility Layout:

  • Analyzation of existing utilities and design of new facilities for utilities to and on a site, including general layout.
SiteDev_Parking-01

Parking Layout:

  • Determination of number of parking spaces needed and most efficient configuration of spaces for traffic flow and maximum space utilization.
SiteDev_FireLine-01

Fire Line and Hydrant Layout:

  • Design of new water distribution facilities sized for fire protection, including calculations concerning pipe sizing, valve placement, fire hydrant locations, etc., for utility extensions.
SiteDev_Traffic Circulation-01

Traffic Circulation:

  • Analyzation of most efficient, safe circulation on a site based on the site’s use, configuration, and traffic conditions.
LandDev_ZoningAssist

Zoning Assistance:

  • Navigation of a jurisdiction’s zoning code and assistance applying for permits should zoning need adjusted.
LandDev_StormWater

Storm Water Management:

LandDev_Annexation

Boundary and Topographic Survey:

  • Collection of data to identify elevations, physical features, and existing facilities within project limits.
Paths_Evaluation

Traffic Impact Studies:

LandDev_Annexation

Pre- and Post- Construction ALTA Survey:

  • Collection of field survey information and development of documentation to be used by a title insuring agency for purposes of insuring a title to the real property; typically required for commercial real estate transactions.

“I appreciate all of Choice One’s survey and design work, as well as their positive attitudes. They have the exceptional ability to make things happen quickly. In the development business, at times things can move fast. Choice One is on the spot and able to provide a survey, easement, or whatever else we might need both efficiently and accurately.”

Keith Carter, Reese Real Estate Development

C1_2whitelogo-(1)

Loveland Station Site Development

Loveland, Ohio

This project included the development of a mixed-use site consisting of retail space below rental units. The downtown Loveland site was approximately 3.6 acres with 235 parking spaces. Underground detention was utilized to handle storm water runoff. Choice One Engineering provided a topographic survey, concept plan, final concept plan, construction plans, site lighting plan, landscape plan, floodplain submittals, and construction administration.

More Site Development Projects

Provision Living Site Development

 

Union Township, Ohio

 

St. Mary’s Shoppes

 

St. Marys, Ohio

 

New Bremen Crown Opera House

 

Crown Equipment
New Bremen, Ohio

 

Let’s Talk Site Development

jeff puthoff

Jeff Puthoff, P.E.

michael seeger

Michael Seeger, P.E.

We’re Hiring!

If you want to enjoy your career, build lifelong relationships, and be part of a growing civil engineering firm that values its culture, you’ve come to the right place! At Choice One Engineering, our purpose statement is “to provide fulfilling lives for a lifetime.”