US 127 & SR 725 Intersection Improvements

Camden, Ohio
Fast Facts
ScopeSafety study, recommendations, and intersection improvements at US 127 and SR 725
ServicesSafety study, improvement recommendations, topographic survey, construction plans, ODOT right-of-way plans
Construction Cost$1,780,027
ClientVillage of Camden

The Project:

The Village of Camden identified a signalized intersection at US 127 and SR 725 as one of its most pressing safety concerns. With a well-documented history of serious crashes, they knew the intersection demanded more than routine maintenance. The Village joined forces with Choice One Engineering to evaluate conditions and help chart a path forward.

The Challenge:

The numbers told a troubling story. Over a five-year period, 25 crashes occurred that resulted in an injury. Limited signal visibility, higher approach speeds, and nearby driveways all contributed to safety concerns.

How We Helped:

Choice One Engineering conducted a safety study to identify the factors contributing to crashes and developed targeted recommendations. Improvements included new left-turn lanes on US 127, mast-arm traffic signals, and access-management improvements. Choice One also helped the Village secure more than $1.6 million in HSIP funding to bring the project to construction.

The Result:

Camden now has an intersection designed with safety in mind. The improvements addressed the root causes of past crashes and enhanced conditions for everyone passing through.

Share the Post:

Related Projects

Rubik’s Rivalry

[vc_row css_animation=”” row_type=”row” use_row_as_full_screen_section=”no” type=”full_width” angled_section=”no” text_align=”left” background_image_as_pattern=”without_pattern”][vc_column][vc_column_text] Troy Niese: “For the record, I had the slow, rusty cube.” When

Read More