Curtis Drive Reconstruction

City of Wilmington, Clinton County, Ohio

Approximate Construction Estimate: $1,300,000

Projected Bidding Timeframe: Quarter 3, 2026 by City of Wilmington

Project Funding: OPWC

MIA-571 Crosswalks X 2, PID 124454

Village of West Milton, Miami County, Ohio

Approximate Construction Estimate: $538,000

Projected Bidding Timeframe: Quarter 3, 2026 by ODOT

Project Funding: ODOT Let

Quarter 4, 2026

BUT-US 127-0.61 Pleasant Avenue Shared-Used Path (120879)

City of Fairfield, Butler County, Ohio

Approximate Construction Estimate: $5,400,000

Projected Bidding Timeframe: Quarter 4, 2026 by City of Fairfield

Project Funding: OKI - ODOT

Brookside Park Drive Culvert

City of Sidney, Shelby County, Ohio

Approximate Construction Estimate: $240,000

Projected Bidding Timeframe: Quarter 4, 2026 by City of Sidney

Project Funding: Local

CCMG Project Aurora FY2027 (Main Street & Judiciary Street)

City of Aurora, Dearborn County, Indiana

Approximate Construction Estimate: $1,145,000

Projected Bidding Timeframe: Quarter 4, 2026 by Choice One

Project Funding: CCMG

CDBG Water System and Road Improvement Project

Village of New Miami, Butler County, Ohio

Approximate Construction Estimate: $220,000

Projected Bidding Timeframe: Quarter 4, 2026 by Butler County

Project Funding: CDBG

Cable Road Forcemain Replacement Project

City of Lima, Allen County, Ohio

Approximate Construction Estimate: Unknown at this time

Projected Bidding Timeframe: Quarter 4, 2026 by Choice One

Project Funding: Local

Caton and Far Hills Water Main Replacement

City of Oakwood, Montgomery County, Ohio

Approximate Construction Estimate: $350,000

Projected Bidding Timeframe: Quarter 4, 2026 by City of Oakwood

Project Funding: Local

Crystal Drive Lift Station Abandonment

City of Fairfield, Butler County, Ohio

Approximate Construction Estimate: $100,000

Projected Bidding Timeframe: Quarter 4, 2026 by City of Fairfield

Project Funding: Local

Gleason to Kuther Sanitary Sewer Evaluation and Replacement

City of Sidney, Shelby County, Ohio

Approximate Construction Estimate: $1,400,000

Projected Bidding Timeframe: Quarter 4, 2026 by City of Sidney

Project Funding: Local

HAM-CR299-6.81 (Loveland Madeira Road) PID 120732

City of Loveland, Hamilton County, Ohio

Approximate Construction Estimate: $5,000,000

Projected Bidding Timeframe: Quarter 4, 2026 by ODOT Let

Project Funding: ODOT STBG/CMAQ

Hay Avenue Reconstruction – Phase 3

City of Brookville, Montgomery County, Ohio

Approximate Construction Estimate: $980,000

Projected Bidding Timeframe: Quarter 4, 2026 by Choice One

Project Funding: OPWC

Jackson, Harmon, Moening and Grant Street Water and Lead Service Replacement

City of Delphos, Allen County, Ohio

Approximate Construction Estimate: $2,335,000

Projected Bidding Timeframe: Quarter 4, 2026 by Choice One

Project Funding: OEPA DEFA

Millcreek Road and Fair Road Reconstruction

City of Sidney, Shelby County, Ohio

Approximate Construction Estimate: $7,400,000

Projected Bidding Timeframe: Quarter 4, 2026 by City of Sidney

Project Funding: Local

Montgomery County Facilities Sidewalk and Curb Repairs

Montgomery County Facilities, Ohio

Approximate Construction Estimate: $150,000

Projected Bidding Timeframe: Quarter 4, 2026 by Choice One

Project Funding: Local

Montgomery Road Sidewalk Phase 1 Design

Symmes Township, Hamilton County, Ohio

Approximate Construction Estimate: $1,100,000

Projected Bidding Timeframe: Quarter 4, 2026 by Symmes Township

Project Funding: SORTA

Park Splash Pad

Village of Arcanum, Darke County, Ohio

Approximate Construction Estimate: $250,000

Projected Bidding Timeframe: Quarter 4, 2026 by Choice One

Project Funding: Local

Rosedale Drive and Lawndale Drive Sanitary Sewer Replacement

Northwestern Water and Sewer District (NWWSD)

Approximate Construction Estimate: $300,000

Projected Bidding Timeframe: Quarter 4, 2026 by Choice One

Project Funding: Local

SR 276 Water Main Replacement

Clermont County Water Resources Department, Ohio

Approximate Construction Estimate: $1,800,000

Projected Bidding Timeframe: Quarter 4, 2026 by Clermont County

Project Funding: Local

Taylorsville 24-Inch Water Transmission Main

City of Huber Heights, Montgomery County, Ohio

Approximate Construction Estimate: $,2500,000

Projected Bidding Timeframe: Quarter 4, 2026 by City of Huber Heights

Project Funding: OPWC

Taylorsville MetroPark Culverts Replacement

Five Rivers MetroParks, Ohio

Approximate Construction Estimate: $621,000

Projected Bidding Timeframe: Quarter 4, 2026 by Five Rivers MetroParks

Project Funding: Local

Upper Bellbrook Road Sidewalk

Sugarcreek Township, Greene County, Ohio

Approximate Construction Estimate: Unknown at this time

Projected Bidding Timeframe: Quarter 4, 2026 by Choice One

Project Funding: Local

Quarter 1, 2027

2024 Miami County Bridge Package (Swailes Road Bridge 01.94)

Miami County Engineer, Ohio

Approximate Construction Estimate: $1,118,000

Projected Bidding Timeframe: Quarter 1, 2027 by Miami County Engineers Office

Project Funding: Local

2025 Miami County Bridge Package (Bridges #3 & #4)

Miami County Engineer, Ohio

Approximate Construction Estimate: $530,000 for #3 and $675,000 for #4

Projected Bidding Timeframe: Quarter 1, 2027 by Miami County Engineer

Project Funding: Local

ALL-Cable Road Improvements, PID: 112573

City of Lima, Allen County, Ohio

Approximate Construction Estimate: $4,955,000

Projected Bidding Timeframe: Quarter 1, 2027 by ODOT

Project Funding: ODOT Safety

AUG Spring St. Reconstruction (PID: 120199)

City of St. Marys, Auglaize County, Ohio

Approximate Construction Estimate: $3,600,000

Projected Bidding Timeframe: Quarter 1, 2027 by ODOT

Project Funding: Safety & TAP

Aullwood Garden MetroPark Pedestrian Bridge Replacement

Five Rivers MetroParks

Approximate Construction Estimate: $350,000

Projected Bidding Timeframe: Quarter 1, 2027 by Five Rivers MetroParks

Project Funding: Local

Britton Lane Sanitary Sewer Main Replacement and Rehabilitation

Butler County Water and Sewer, Ohio

Approximate Construction Estimate: $600,000

Projected Bidding Timeframe: Quarter 1, 2027 by Butler County

Project Funding: Local

CLA-CR333-11.35 Sidewalks (PID: 118643)

City of Springfield, Clark County, Ohio

Approximate Construction Estimate: $1,975,000

Projected Bidding Timeframe: Quarter 1, 2027 by City of Springfield

Project Funding: CMAQ

Carriage Hill MetroPark Historic Farm Bridge Replacement

Five Rivers MetroParks, Ohio

Approximate Construction Estimate: $461,000

Projected Bidding Timeframe: Quarter 1, 2027 by Five Rivers MetroParks

Project Funding: Local

Coltsbridge Trail Extension

Orange Township, Delaware County, Ohio

Approximate Construction Estimate: Unknown at this time

Projected Bidding Timeframe: Quarter 1, 2027 by Choice One

Project Funding: Local

Converse Park Improvements

Village of West Jefferson, Madison County

Approximate Construction Estimate: Unknown at this time

Projected Bidding Timeframe: Quarter 1, 2027 by Choice One

Project Funding: Local

E. Orange Road Path Improvements

Orange Township, Delaware County

Approximate Construction Estimate: Unknown at this time

Projected Bidding Timeframe: Quarter 1, 2027 by Choice One

Project Funding: Local

Echo Hills Golf Course Hole 16 Bridge Project

City of Piqua, Miami County, Ohio

Approximate Construction Estimate: Unknown at this time

Projected Bidding Timeframe: Quarter 1, 2027 by Choice One

Project Funding: Local

Foundry Avenue Sidewalk

Village of Batavia, Clermont County, Ohio

Approximate Construction Estimate: $100,000

Projected Bidding Timeframe: Quarter 1, 2027 by Choice One

Project Funding: CDBG

Glen Oak Trail Extension

Orange Township, Delaware County, Ohio

Approximate Construction Estimate: Unknown at this time

Projected Bidding Timeframe: Quarter 1, 2027 by Choice One

Project Funding: Local

Interstate 75 Waterline Crossing Project

Warren County Water and Sewer Department

Approximate Construction Estimate: $5,000,000

Projected Bidding Timeframe: Quarter 1, 2027 by Warren County

Project Funding: Local

Kiser and Miles Water Main Replacement

City of Tipp City, Miami County, Ohio

Approximate Construction Estimate: $745,000

Projected Bidding Timeframe: Quarter 1, 2027 by Choice One

Project Funding: CDBG

Leeson Avenue Phase 2 Reconstruction

City of Van Wert, Van Wert, Ohio

Approximate Construction Estimate: $4,403,617

Projected Bidding Timeframe: Quarter 1, 2027 by ODOT

Project Funding: Small Cities

N Main Street Reconstruction

Village of Bluffton, Allen County, Ohio

Approximate Construction Estimate: $1,740,000

Projected Bidding Timeframe: Quarter 1, 2027 by Choice One

Project Funding: Local/OPWC

Old Canal Rd. Bridge Guardrail Replacement

City of Vandalia, Montgomery County, Ohio

Approximate Construction Estimate: Unknown at this time

Projected Bidding Timeframe: Quarter 1, 2027 by City of Vandalia

Project Funding: Local

Pleasant Avenue Water Main Replacement

City of Fairfield, Butler County, Ohio

Approximate Construction Estimate: $1,000,000

Projected Bidding Timeframe: Quarter 1, 2027 by City of Fairfield

Project Funding: Local

Sixth and Jefferson Street Extension

Village of Minster, Auglaize County, Ohio

Approximate Construction Estimate: $2,100,000

Projected Bidding Timeframe: Quarter 1, 2027 by Choice One

Project Funding: Local

South Patterson Street Phase 2 Reconstruction

Village of Carey, Wyandot County, Ohio

Approximate Construction Estimate: $1,720,000

Projected Bidding Timeframe: Quarter 1, 2027 by Choice One

Project Funding: Local

Tall Timber and Laurelwood Water Main Replacement

Montgomery County Environmental Services

Approximate Construction Estimate: $600,000

Projected Bidding Timeframe: Quarter 1, 2027 by MCES

Project Funding: OPWC

VAN-CR124-00.14 Bridge Replacement (PID #115518)

Van Wert County Engineer, Ohio

Approximate Construction Estimate: $1,470,177

Projected Bidding Timeframe: Quarter 1, 2027 by ODOT

Project Funding: ODOT

W. Warren/Canal Street Reconstruction

City of Lebanon, Warren County, Ohio

Approximate Construction Estimate: $1,000,000

Projected Bidding Timeframe: Quarter 1, 2027 by City of Lebanon

Project Funding: Local

WTP Sanitary Sewer Improvements

City of Greenville, Darke County, Ohio

Approximate Construction Estimate: Unknown at this time

Projected Bidding Timeframe: Quarter 1, 2027 by Choice One

Project Funding: OPWC

Ward Street Reconstruction

City of Lebanon, Warren County, Ohio

Approximate Construction Estimate: $700,000

Projected Bidding Timeframe: Quarter 1, 2027 by City of Lebanon

Project Funding: Local

Water Meter Replacement

Village of Sabina, Clinton County, Ohio

Approximate Construction Estimate: $600,000

Projected Bidding Timeframe: Quarter 1, 2027 by Choice One

Project Funding: OPWC

Well Field Improvements

Village of Lewisburg, Preble County, Ohio

Approximate Construction Estimate: $607,000

Projected Bidding Timeframe: Quarter 1, 2027 by Choice One

Project Funding: WSRLA

Wilkinson Ave. and Casey St. Sanitary and Storm Sewer Replacement

City of Sidney, Shelby County, Ohio

Approximate Construction Estimate: $900,000

Projected Bidding Timeframe: Quarter 1, 2027 by City of Sidney

Project Funding: Local

Wilson Ave. Water Main Replacement

City of Sidney, Shelby County, Ohio

Approximate Construction Estimate: $900,000

Projected Bidding Timeframe: Quarter 1, 2027 by City of Sidney

Project Funding: Local

Yellow Springs-Fairfield Road Storm

Village of Yellow Springs, Greene County, Ohio

Approximate Construction Estimate: $525,000

Projected Bidding Timeframe: Quarter 1, 2027 by Choice One

Project Funding: OPWC

Quarter 2, 2027

2027 Morrow Hydrant Replacements

Village of Morrow, Warren County, Ohio

Approximate Construction Estimate: $280,000

Projected Bidding Timeframe: Quarter 2, 2027 by Choice One

Project Funding: OPWC

2027 Owensville Paving Program

Village of Owensville, Clermont County, Ohio

Approximate Construction Estimate: $300,000

Projected Bidding Timeframe: Quarter 2, 2027 by Choice One

Project Funding: OPWC

2027 Water Main Design Project

City of Springboro, Warren County, Ohio

Approximate Construction Estimate: $900,000

Projected Bidding Timeframe: Quarter 2, 2027 by City of Springboro

Project Funding: Local

Commanche Ditch Restoration Phase 1

City of Tipp City, Miami County, Ohio

Approximate Construction Estimate: $300,000

Projected Bidding Timeframe: Quarter 2, 2027 by Choice One

Project Funding: Local

Creekview Drive Storm Outlet Improvements

City of Sharonville, Hamilton, County, Ohio

Approximate Construction Estimate: $100,000

Projected Bidding Timeframe: Quarter 2, 2027 by Choice One

Project Funding: OPWC

East Broadway Street Reconstruction

City of South Lebanon, Warren County, Ohio

Approximate Construction Estimate: $800,000

Projected Bidding Timeframe: Quarter 2, 2027 by Choice One

Project Funding: OPWC

Fancy Street Water Tower Rehabilitation

Village of Blanchester, Clinton County, Ohio

Approximate Construction Estimate: $500,000

Projected Bidding Timeframe: Quarter 2, 2027 by Choice One

Project Funding: Local and OPWC

Garrett Dr. & Betty Ln. Area Water Main Replacement

Clermont County Water Resources Department

Approximate Construction Estimate: $5,000,000

Projected Bidding Timeframe: Quarter 2, 2027 by Clermont County

Project Funding: Local

High Street Culvert Replacement

Village of New Richmond, Clermont County, Ohio

Approximate Construction Estimate: $230,000

Projected Bidding Timeframe: Quarter 2, 2027 by Choice One

Project Funding: OPWC

Light Street Reconstruction

Village of Felicity, Clermont County, Ohio

Approximate Construction Estimate: $1,000,000

Projected Bidding Timeframe: Quarter 2, 2027 by Choice One

Project Funding: OPWC

MOT Kingsridge Drive Improvements (PID: 120184)

Miami Township, Montgomery County

Approximate Construction Estimate: $2,445,000

Projected Bidding Timeframe: Quarter 2, 2027 by ODOT

Project Funding: Safety

Pennyroyal Road Resurfacing (PID 121846)

City of Springboro, Warren County, Ohio

Approximate Construction Estimate: $850,000

Projected Bidding Timeframe: Quarter 2, 2027 by ODOT

Project Funding: MVRPC

Pierce Street Reconstruction

City of Delphos, Allen Couty, Ohio

Approximate Construction Estimate: $3,860,000

Projected Bidding Timeframe: Quarter 2, 2027 by Choice One

Project Funding: WPCLF and WSRLA Lead Service Line

Poplar Creek Sanitary Utility Protection

City of Vandalia, Montgomery County, Ohio

Approximate Construction Estimate: $434,000

Projected Bidding Timeframe: Quarter 2, 2027 by City of Vandalia

Project Funding: Local

Signal Improvements

City of Washington Court House, Ohio

Approximate Construction Estimate: $250,000

Projected Bidding Timeframe: Quarter 2, 2027 by Choice One

Project Funding: OPWC

South Sycamore Street Storm Improvements, Phase 1

Village of North Lewisburg, Champaign County, Ohio

Approximate Construction Estimate: $470,000

Projected Bidding Timeframe: Quarter 2, 2027 by Choice One

Project Funding: CDBG

Springdale Road Sidewalk Phase 2 (PID 120861)

Colerain Township, Hamilton County, Ohio

Approximate Construction Estimate: $669,000

Projected Bidding Timeframe: Quarter 2, 2027 by ODOT Let

Project Funding: Transportation Alternatives

Stonewall Subdivision Drainage Improvements Phase 1

Turtlecreek Township, Warren County, Ohio

Approximate Construction Estimate: $1,700,000

Projected Bidding Timeframe: Quarter 2, 2027 by Warren County

Project Funding: OPWC

Quarter 3, 2027

MOT Arlington Rd. RSF (PID: 121592)

City of Brookville, Montgomery County, Ohio

Approximate Construction Estimate: $605,000

Projected Bidding Timeframe: Quarter 3, 2027 by ODOT

Project Funding: STP

MOT Infirmary – Pinnacle RSF (PID: 121590)

Jefferson Township, Montgomery County, Ohio

Approximate Construction Estimate: $800,000

Projected Bidding Timeframe: Quarter 3, 2027 by ODOT

Project Funding: STP

Valley Bell Connector-Phase 1

Beavercreek Township, Greene County, Ohio

Approximate Construction Estimate: $1,736,000

Projected Bidding Timeframe: Quarter 3, 2027 by Choice One

Project Funding: Federal PDAC and OPWC

Quarter 4, 2027

CLE SR 48-6.65 State Route 48 & Butterworth Sidewalk, PID 121899

City of Loveland, Warren County, Ohio

Approximate Construction Estimate: $2,700,000

Projected Bidding Timeframe: Quarter 4, 2027 by ODOT

Project Funding: Systemic Safety & OKI Transportation-Alternatives

N. Maple St. Reconstruction, Phase 3 (PID 123075)

City of Eaton, Preble County, Ohio

Approximate Construction Estimate: $3,000,000

Projected Bidding Timeframe: Quarter 4, 2027 by ODOT

Project Funding: ODOT Small Cities

Sweitzer Street Improvements

City of Greenville, Darke County, Ohio

Approximate Construction Estimate: $5,137,100

Projected Bidding Timeframe: Quarter 4, 2027 by ODOT

Project Funding: Small City, Local, Safety, Urban Paving

WOO-VAR Fostoria SRTS FY27 (PID 122204)

City of Fostoria, Wood County, Ohio

Approximate Construction Estimate: $770,000

Projected Bidding Timeframe: Quarter 4, 2027 by Choice One

Project Funding: Safe Routes to School

Quarter 1, 2028

Detroit Street Reconstruction Phase 2

City of Kenton, Hardin County, Ohio

Approximate Construction Estimate: Unknown at this time

Projected Bidding Timeframe: Quarter 1, 2028 by ODOT

Project Funding: Small Cities/Local

LOG-Simon Kenton Trail (PID 124338)

Logan County Engineer's Office

Approximate Construction Estimate: $2,300,000

Projected Bidding Timeframe: Quarter 1, 2028 by Logan County Engineer

Project Funding: ODOT Special Bike/Ped Solicitation

Quarter 2, 2028

HAN McComb Sidewalks (PID: 124323)

Village of McComb, Hancock County, Ohio

Approximate Construction Estimate: $1,600,000

Projected Bidding Timeframe: Quarter 2, 2028 by ODOT

Project Funding: ODOT TAP

MOT-SR 741 2.03 Pedestrian Improvements, PID 122021

Miami Township, Clermont County

Approximate Construction Estimate: $950,000

Projected Bidding Timeframe: Quarter 2, 2028 by ODOT

Project Funding: ODOT Systemic Safety

Quarter 3, 2028

GRE-Xenia FY 28 Sidewalk TAP (PID 124967)

City of Xenia, Greene County, Ohio

Approximate Construction Estimate: $760,000

Projected Bidding Timeframe: Quarter 3, 2028 by City of Xenia

Project Funding: ODOT

MOT-CR24-8.17 Intersection (PID: 122785)

City of Clayton, Montgomery County, Ohio

Approximate Construction Estimate: $3,000,000

Projected Bidding Timeframe: Quarter 3, 2028 by City of Clayton

Project Funding: ODOT Systemic Safety

Quarter 4, 2028

4th Street Reconstruction

City of London, Madison County, Ohio

Approximate Construction Estimate: $750,000

Projected Bidding Timeframe: Quarter 4, 2028 by ODOT

Project Funding: ODOT Small Cities

HAM Compton Road Sidewalk (PID 122989)

Colerain Township, Hamilton County, Ohio

Approximate Construction Estimate: $1,579,000

Projected Bidding Timeframe: Quarter 4, 2028 by ODOT Let

Project Funding: OKI Transportation Alternatives

MOT – SR 48 – 20.28 Ped. Imp (PID: 124483)

City of Clayton, Montgomery County, Ohio

Approximate Construction Estimate: $3,410,800

Projected Bidding Timeframe: Quarter 4, 2028 by City of Clayton

Project Funding: ODOT Systemic Safety

Quarter 1, 2029

MOT-Old N. Dayton Trail Segment 3 (PID 119556)

Miami Conservancy District

Approximate Construction Estimate: $900,000

Projected Bidding Timeframe: Quarter 1, 2029 by ODOT

Project Funding: ODOT - TA

South Walnut Street Reconstruction

City of Van Wert, Van Wert, Ohio

Approximate Construction Estimate: $7,571,031

Projected Bidding Timeframe: Quarter 1, 2029 by ODOT

Project Funding: ODOT Small Cities

Quarter 2, 2029

HAM-CR299 6.54 Loveland Madeira Phase 2, PID 125546

City of Loveland, Hamilton County, Ohio

Approximate Construction Estimate: $4,000,000

Projected Bidding Timeframe: Quarter 2, 2029 by ODOT

Project Funding: OKI STBG

Quarter 3, 2029

CR 25A Resurfacing (MIA CR 25A RSF 02.74)

City of Tipp City, Miami County, Ohio

Approximate Construction Estimate: $1,738,728

Projected Bidding Timeframe: Quarter 3, 2029 by ODOT

Project Funding: Surface Transportation Program (STP)

North Main Street Shared Use Path – Poe Rd. to Nims Rd.

City of Bowling Green, Wood County, Ohio

Approximate Construction Estimate: Unknown at this time

Projected Bidding Timeframe: Quarter 3, 2029 by City of Bowling Green

Project Funding: SS4A

Quarter 1, 2030

MOT-Chambersburg/Fishburg-PED (PID: 126229)

City of Huber Heights, Montgomery County, Ohio

Approximate Construction Estimate: $1,200,000

Projected Bidding Timeframe: Quarter 1, 2030 by City of Huber Heights

Project Funding: CR/TA

Quarter 4, 2030

MOT-Mad River Trail Improvements (PID 123892)

Five Rivers MetroParks, Montgomery County, Ohio

Approximate Construction Estimate: $617,000

Projected Bidding Timeframe: Quarter 4, 2030 by Five Rivers MetroParks

Project Funding: ODOT

Let's Get Started!

Give us a call or send us a message, and we will connect you with the right person from our team.

Contact Information
How Can We Help?