Interested in future projects?

Future Bidding Possibilities

Quarter 2, 2018

Spruceway, Paw Paw and Catalpa Water Main Replacement

Spruceway, Paw Paw and Catalpa Water Main Replacement

City of Springboro, Warren County, Ohio

Approximate Construction Estimate:
$720,000

Projected Bidding Timeframe:
Quarter 2, 2018 by City of Springboro

Project Funding:
Local

Category:
Description

Spruceway, Paw Paw and Catalpa Water Main Replacement

City of Springboro, Warren County, Ohio

Approximate Construction Estimate:
$720,000

Projected Bidding Timeframe:
Quarter 2, 2018 by City of Springboro

Project Funding:
Local

Gay Street and Maple Street Reconstruction

Gay Street and Maple Street Reconstruction

Village of Plain City, Madison County, Ohio

Approximate Construction Estimate:
$1,850,000

Projected Bidding Timeframe:
Quarter 2, 2018 by Village of Plain City

Project Funding:
OPWC & CDBG

Category:
Description

Gay Street and Maple Street Reconstruction

Village of Plain City, Madison County, Ohio

Approximate Construction Estimate:
$1,850,000

Projected Bidding Timeframe:
Quarter 2, 2018 by Village of Plain City

Project Funding:
OPWC & CDBG

John Gray Road Sidewalk Improvements

John Gray Road Sidewalk Improvements

City of Fairfield, Butler County, Ohio

Approximate Construction Estimate:
$290,000

Projected Bidding Timeframe:
Quarter 2, 2018 by the City of Fairfield

Project Funding:
Local

Category:
Description

John Gray Road Sidewalk Improvements

City of Fairfield, Butler County, Ohio

Approximate Construction Estimate:
$290,000

Projected Bidding Timeframe:
Quarter 2, 2018 by the City of Fairfield

Project Funding:
Local

Leon Pratt Drive & CR 25A Improvements

Leon Pratt Drive & CR 25A Improvements

City of Wapakoneta, Auglaize County, Ohio

Approximate Construction Estimate:
$3,250,000

Projected Bidding Timeframe:
Quarter 2, 2018 by Choice One

Project Funding:
ODOT, Local

Category:
Description

Leon Pratt Drive & CR 25A Improvements

City of Wapakoneta, Auglaize County, Ohio

Approximate Construction Estimate:
$3,250,000

Projected Bidding Timeframe:
Quarter 2, 2018 by Choice One

Project Funding:
ODOT, Local

Liberty Street Reconstruction

Liberty Street Reconstruction

Village of Russia, Shelby County, Ohio

Approximate Construction Estimate:
$563,000

Projected Bidding Timeframe:
Quarter 2, 2018 by Choice One

Project Funding:
OPWC

Category:
Description

Liberty Street Reconstruction

Village of Russia, Shelby County, Ohio

Approximate Construction Estimate:
$563,000

Projected Bidding Timeframe:
Quarter 2, 2018 by Choice One

Project Funding:
OPWC

Vision Park Roadway Profile Adjustment

Vision Park Roadway Profile Adjustment

City of Van Wert, Van Wert, Ohio

Approximate Construction Estimate:
$1,870,387.20

Projected Bidding Timeframe:
Quarter 2, 2018 by Choice One

Project Funding:
Local

Category:
Description

Vision Park Roadway Profile Adjustment

City of Van Wert, Van Wert, Ohio

Approximate Construction Estimate:
$1,870,387.20

Projected Bidding Timeframe:
Quarter 2, 2018 by Choice One

Project Funding:
Local

Quarter 3, 2018

Eagle View Drive Culvert Replacement

Eagle View Drive Culvert Replacement

City of Mason, Warren County, Ohio

Approximate Construction Estimate:
$300,000

Projected Bidding Timeframe:
Quarter 3, 2018 by City of Mason

Project Funding:
Local

Category:
Description

Eagle View Drive Culvert Replacement

City of Mason, Warren County, Ohio

Approximate Construction Estimate:
$300,000

Projected Bidding Timeframe:
Quarter 3, 2018 by City of Mason

Project Funding:
Local

West Elm Street Water Main Replacement

West Elm Street Water Main Replacement

Village of Bluffton, Allen County, Ohio

Approximate Construction Estimate:
$434,000

Projected Bidding Timeframe:
Quarter 3, 2018 by Choice One

Project Funding:
Local

Category:
Description

West Elm Street Water Main Replacement

Village of Bluffton, Allen County, Ohio

Approximate Construction Estimate:
$434,000

Projected Bidding Timeframe:
Quarter 3, 2018 by Choice One

Project Funding:
Local

Northeast Sanitary Sewer Improvements

Northeast Sanitary Sewer Improvements

Village of Minster, Auglaize County, Ohio

Approximate Construction Estimate:
$1,300,000

Projected Bidding Timeframe:
Quarter 3, 2018 by Choice One

Project Funding:
Local

Category:
Description

Northeast Sanitary Sewer Improvements

Village of Minster, Auglaize County, Ohio

Approximate Construction Estimate:
$1,300,000

Projected Bidding Timeframe:
Quarter 3, 2018 by Choice One

Project Funding:
Local

La Luz Storm Improvements – Phase 2

La Luz Storm Improvements – Phase 2

City of Lebanon, Warren County, Ohio

Approximate Construction Estimate:
$125,000

Projected Bidding Timeframe:
Quarter 3, 2018 by City of Lebanon

Project Funding:
Local

Category:
Description

La Luz Storm Improvements – Phase 2

City of Lebanon, Warren County, Ohio

Approximate Construction Estimate:
$125,000

Projected Bidding Timeframe:
Quarter 3, 2018 by City of Lebanon

Project Funding:
Local

Lost Creek Restroom Site Plan

Lost Creek Restroom Site Plan

Miami County Park District, Ohio

Approximate Construction Estimate:
Unknown at this time.

Projected Bidding Timeframe:
Quarter 3, 2018 by Choice One

Project Funding:
Local

Category:
Description

Lost Creek Restroom Site Plan

Miami County Park District, Ohio

Approximate Construction Estimate:
Unknown at this time.

Projected Bidding Timeframe:
Quarter 3, 2018 by Choice One

Project Funding:
Local

Rich/Davis/Primrose Road

Rich/Davis/Primrose Road Intersection Improvements

Deerfield Township, Warren County, Ohio

Approximate Construction Estimate:
$400,000

Projected Bidding Timeframe:
Quarter 3, 2018 by Warren County

Project Funding:
CDBG

Category:
Description

Rich/Davis/Primrose Road Intersection Improvements

Deerfield Township, Warren County, Ohio

Approximate Construction Estimate:
$400,000

Projected Bidding Timeframe:
Quarter 3, 2018 by Warren County

Project Funding:
CDBG

Donald Drive Water Main Replacement

Donald Drive Water Main Replacement

City of Fairfield, Butler County, Ohio

Approximate Construction Estimate:
$320,000

Projected Bidding Timeframe:
Quarter 3, 2018 by City of Fairfield

Project Funding:
Local

Category:
Description

Donald Drive Water Main Replacement

City of Fairfield, Butler County, Ohio

Approximate Construction Estimate:
$320,000

Projected Bidding Timeframe:
Quarter 3, 2018 by City of Fairfield

Project Funding:
Local

Turn Lane Improvements on SR 118 for Mercer Landmark

Turn Lane Improvements on SR 118 for Mercer Landmark

Mercer County Commissioners, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 3, 2018 by Choice One

Project Funding:
JobsOhio 629

Category:
Description

Turn Lane Improvements on SR 118 for Mercer Landmark

Mercer County Commissioners, Ohio

Approximate Construction Estimate:
Unknown at this time

Projected Bidding Timeframe:
Quarter 3, 2018 by Choice One

Project Funding:
JobsOhio 629

Water Street Reconstruction

Water Street Reconstruction

Village of Clarksville, Clinton County, Ohio

Approximate Construction Estimate:
$300,000

Projected Bidding Timeframe:
Quarter 3, 2018 by Choice One

Project Funding:
OPWC

[/vc_

Category:
Description

Water Street Reconstruction

Village of Clarksville, Clinton County, Ohio

Approximate Construction Estimate:
$300,000

Projected Bidding Timeframe:
Quarter 3, 2018 by Choice One

Project Funding:
OPWC

[/vc_

Water Meter Replacement and Water System Surge Suppression

Water Meter Replacement and Water System Surge Suppression

Village of Felicity, Clermont County, Ohio

Approximate Construction Estimate:
$200,000

Projected Bidding Timeframe:
Quarter 3, 2018 by Choice One

Project Funding:
OPWC

Category:
Description

Water Meter Replacement and Water System Surge Suppression

Village of Felicity, Clermont County, Ohio

Approximate Construction Estimate:
$200,000

Projected Bidding Timeframe:
Quarter 3, 2018 by Choice One

Project Funding:
OPWC

Trisler Road Improvements

Trisler Road Improvements

Franklin Township, Clermont County, Ohio

Approximate Construction Estimate:
$380,000

Projected Bidding Timeframe:
Quarter 3, 2018 by Choice One

Project Funding:
OPWC

Category:
Description

Trisler Road Improvements

Franklin Township, Clermont County, Ohio

Approximate Construction Estimate:
$380,000

Projected Bidding Timeframe:
Quarter 3, 2018 by Choice One

Project Funding:
OPWC

Oak Grove Park Onsite Sewgae Treatment System

Oak Grove Park Onsite Sewgae Treatment System

Centerville Washington Park District, Ohio

Approximate Construction Estimate:
$200,000

Projected Bidding Timeframe:
Quarter 3, 2018 by Choice One

Project Funding:
Local

Category:
Description

Oak Grove Park Onsite Sewgae Treatment System

Centerville Washington Park District, Ohio

Approximate Construction Estimate:
$200,000

Projected Bidding Timeframe:
Quarter 3, 2018 by Choice One

Project Funding:
Local

Quarter 4, 2018

Glynwood Road Waterline Replacement

Glynwood Road Waterline Replacement

City of Wapakoneta, Auglaize County, Ohio

Approximate Construction Estimate:
$984,000

Projected Bidding Timeframe:
Quarter 4, 2018 by Choice One

Project Funding:
Local

Category:
Description

Glynwood Road Waterline Replacement

City of Wapakoneta, Auglaize County, Ohio

Approximate Construction Estimate:
$984,000

Projected Bidding Timeframe:
Quarter 4, 2018 by Choice One

Project Funding:
Local

Butler-Warren Road Widening at The Trails

Butler-Warren Road Widening at The Trails

Liberty Township, Butler County, Ohio

Approximate Construction Estimate:
$400,000

Projected Bidding Timeframe:
Quarter 4, 2018 by Butler County

Project Funding:
Local

Category:
Description

Butler-Warren Road Widening at The Trails

Liberty Township, Butler County, Ohio

Approximate Construction Estimate:
$400,000

Projected Bidding Timeframe:
Quarter 4, 2018 by Butler County

Project Funding:
Local

Dave Avenue Reconstruction

Dave Avenue Reconstruction

City of Lebanon, Warren County, Ohio

Approximate Construction Estimate:
$500,000

Projected Bidding Timeframe:
Quarter 4, 2018 by the City of Lebanon

Project Funding:
OPWC

Category:
Description

Dave Avenue Reconstruction

City of Lebanon, Warren County, Ohio

Approximate Construction Estimate:
$500,000

Projected Bidding Timeframe:
Quarter 4, 2018 by the City of Lebanon

Project Funding:
OPWC

Quarter 1, 2019

Ream Street Storm Sewer Improvements – Phase 2

Ream Street Storm Sewer Improvements – Phase 2

Village of Ada, Hardin County, Ohio

Approximate Construction Estimate:
$440,000

Projected Bidding Timeframe:
Quarter 1, 2019 by Choice One

Project Funding:
CDBG

Category:
Description

Ream Street Storm Sewer Improvements – Phase 2

Village of Ada, Hardin County, Ohio

Approximate Construction Estimate:
$440,000

Projected Bidding Timeframe:
Quarter 1, 2019 by Choice One

Project Funding:
CDBG

Ream Street Water Main Replacement

Ream Street Water Main Replacement

Village of Ada, Hardin County, Ohio

Approximate Construction Estimate:
$104,000

Projected Bidding Timeframe:
Quarter 1, 2019 by Choice One

Project Funding:
CDBG

Category:
Description

Ream Street Water Main Replacement

Village of Ada, Hardin County, Ohio

Approximate Construction Estimate:
$104,000

Projected Bidding Timeframe:
Quarter 1, 2019 by Choice One

Project Funding:
CDBG

SR 126 25.41 Urban Paving (PID 101419)

SR 126 25.41 Urban Paving (PID 101419)

City of Milford, Hamilton County, Ohio

Approximate Construction Estimate:
$185,000

Projected Bidding Timeframe:
Quarter 1, 2019 by ODOT

Project Funding:
ODOT Urban Paving

Category:
Description

SR 126 25.41 Urban Paving (PID 101419)

City of Milford, Hamilton County, Ohio

Approximate Construction Estimate:
$185,000

Projected Bidding Timeframe:
Quarter 1, 2019 by ODOT

Project Funding:
ODOT Urban Paving

PRE US 35/SR 732 Paving (PID 101404)

PRE US 35/SR 732 Paving (PID 101404)

City of Eaton, Preble County, Ohio

Approximate Construction Estimate:
$1,300,000

Projected Bidding Timeframe:
Quarter 1, 2019 by ODOT

Project Funding:
ODOT, Urban Paving

Category:
Description

PRE US 35/SR 732 Paving (PID 101404)

City of Eaton, Preble County, Ohio

Approximate Construction Estimate:
$1,300,000

Projected Bidding Timeframe:
Quarter 1, 2019 by ODOT

Project Funding:
ODOT, Urban Paving

Hilton, Glenbeck, Gaylord and West Water Main Replacement

Hilton, Glenbeck, Gaylord and West Water Main Replacement

Montgomery County Environmental Services, Kettering, Ohio

Approximate Construction Estimate:
$975,000

Projected Bidding Timeframe:
Quarter 1, 2019 by Montgomery County

Project Funding:
OPWC and Local

Category:
Description

Hilton, Glenbeck, Gaylord and West Water Main Replacement

Montgomery County Environmental Services, Kettering, Ohio

Approximate Construction Estimate:
$975,000

Projected Bidding Timeframe:
Quarter 1, 2019 by Montgomery County

Project Funding:
OPWC and Local

Willeke Avenue Reconstruction Phase 2

Willeke Avenue Reconstruction Phase 2

Village of Ada, Harden County, Ohio

Approximate Construction Estimate:
$1,324,219

Projected Bidding Timeframe:
Quarter 1, 2019 by Choice One

Project Funding:
OPWC

Category:
Description

Willeke Avenue Reconstruction Phase 2

Village of Ada, Harden County, Ohio

Approximate Construction Estimate:
$1,324,219

Projected Bidding Timeframe:
Quarter 1, 2019 by Choice One

Project Funding:
OPWC

Village of Ludlow Falls Sanitary Sewer System

Village of Ludlow Falls Sanitary Sewer System

Village of Ludlow Falls, Miami County, Ohio

Approximate Construction Estimate:
$3,096.157

Projected Bidding Timeframe:
Quarter 1, 2019 by Choice One

Project Funding:
USACE, CDBG, OWDA

Category:
Description

Village of Ludlow Falls Sanitary Sewer System

Village of Ludlow Falls, Miami County, Ohio

Approximate Construction Estimate:
$3,096.157

Projected Bidding Timeframe:
Quarter 1, 2019 by Choice One

Project Funding:
USACE, CDBG, OWDA

Quarter 2, 2019

Traffic Signal Improvements

Traffic Signal Improvements

Village of New Bremen, Auglaize County, Ohio

Approximate Construction Estimate:
$1,000,000

Projected Bidding Timeframe:
Quarter 2, 2019 by Choice One

Project Funding:
Local

Category:
Description

Traffic Signal Improvements

Village of New Bremen, Auglaize County, Ohio

Approximate Construction Estimate:
$1,000,000

Projected Bidding Timeframe:
Quarter 2, 2019 by Choice One

Project Funding:
Local

MMM Road Reconstruction – Phase 1

MMM Road Reconstruction – Phase 1

Village of South Lebanon, Warren County, Ohio

Approximate Construction Estimate:
$800,000

Projected Bidding Timeframe:
Quarter 2, 2019 by Village of South Lebanon

Project Funding:
OPWC

Category:
Description

MMM Road Reconstruction – Phase 1

Village of South Lebanon, Warren County, Ohio

Approximate Construction Estimate:
$800,000

Projected Bidding Timeframe:
Quarter 2, 2019 by Village of South Lebanon

Project Funding:
OPWC

Quarter 3, 2019

Main Street Traffic Signal Upgrades

Main Street Traffic Signal Upgrades

City of New Carlisle, Clark County, Ohio

Approximate Construction Estimate:
$515,000

Projected Bidding Timeframe:
Quarter 3, 2019 by ODOT

Project Funding:
ODOT, CMAQ

Category:
Description

Main Street Traffic Signal Upgrades

City of New Carlisle, Clark County, Ohio

Approximate Construction Estimate:
$515,000

Projected Bidding Timeframe:
Quarter 3, 2019 by ODOT

Project Funding:
ODOT, CMAQ

Quarter 2, 2020

AUG-SRTS Wapak Infrastructure (PID 106131)

AUG-SRTS Wapak Infrastructure (PID 106131)

City of Wapakoneta, Auglaize County, Ohio

Approximate Construction Estimate:
$360,000

Projected Bidding Timeframe:
Quarter 2, 2020 by ODOT

Project Funding:
ODOT

Category:
Description

AUG-SRTS Wapak Infrastructure (PID 106131)

City of Wapakoneta, Auglaize County, Ohio

Approximate Construction Estimate:
$360,000

Projected Bidding Timeframe:
Quarter 2, 2020 by ODOT

Project Funding:
ODOT

Mason-Lebanon Bike Path Connector (PID 105175)

Mason-Lebanon Bike Path Connector (PID 105175)

City of Mason, Warren County, Ohio

Approximate Construction Estimate:
$625,000

Projected Bidding Timeframe:
Quarter 2, 2020 by City of Mason

Project Funding:
ODOT

Category:
Description

Mason-Lebanon Bike Path Connector (PID 105175)

City of Mason, Warren County, Ohio

Approximate Construction Estimate:
$625,000

Projected Bidding Timeframe:
Quarter 2, 2020 by City of Mason

Project Funding:
ODOT

Quarter 4, 2020

Lincoln Avenue Phase 3, PID 106438

Lincoln Avenue Phase 3, (PID 106438)

Village of Ada, Hardin County, Ohio

Approximate Construction Estimate:
$2,678,000

Projected Bidding Timeframe:
Quarter 4, 2020 by ODOT

Project Funding:
ODOT

Category:
Description

Lincoln Avenue Phase 3, (PID 106438)

Village of Ada, Hardin County, Ohio

Approximate Construction Estimate:
$2,678,000

Projected Bidding Timeframe:
Quarter 4, 2020 by ODOT

Project Funding:
ODOT

Quarter 1, 2021

MOT-E. Springfield Street Improvements

MOT-E. Springfield Street Improvements

City of Riverside, Montgomery County, Ohio

Approximate Construction Estimate:
$2,600,000

Projected Bidding Timeframe:
Quarter 1, 2021 by ODOT

Project Funding:
ODOT, MVRPC

Category:
Description

MOT-E. Springfield Street Improvements

City of Riverside, Montgomery County, Ohio

Approximate Construction Estimate:
$2,600,000

Projected Bidding Timeframe:
Quarter 1, 2021 by ODOT

Project Funding:
ODOT, MVRPC

Quarter 1, 2022

MOT-W. Springfield St. Reconstruction

MOT-W. Springfield St. Reconstruction

City of Riverside, Montgomery County, Ohio

Approximate Construction Estimate:
$2,000,000

Projected Bidding Timeframe:
Quarter 1, 2022 by ODOT

Project Funding:
ODOT

Category:
Description

MOT-W. Springfield St. Reconstruction

City of Riverside, Montgomery County, Ohio

Approximate Construction Estimate:
$2,000,000

Projected Bidding Timeframe:
Quarter 1, 2022 by ODOT

Project Funding:
ODOT